Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SiLC Meeting November 18, 2005.

Slides:



Advertisements
Similar presentations
R&D Towards a Solid-State Central Tracker in NA World-Wide Review of LC Tracking January 8, 2004 Bruce Schumm SCIPP & UC Santa Cruz.
Advertisements

Long Shaping-time Silicon Readout Bruce Schumm University of California, Santa Cruz Amsterdam ECFA-DESY Workshop April
SCIPP R&D on Time-Over-Threshold Electronics and Long-Ladder Readout Beijing Linear Collider Workshop Beijing, China February Bruce Schumm.
Long Shaping-time Silicon Readout Bruce Schumm UC Santa Cruz Arlington Linear Collider Workshop January
SCIPP R&D on Long Shaping- Time Electronics SLAC SiD Workshop October 26-29, 2006 Bruce Schumm.
ILC R&D at SCIPP: Progress Report De-scoped ($97.5K) Proposal Activities Radiation Hardness for BeamCal sensors (new; with SLAC) KPiX/Double Metal Performance.
Testbeams for Tracking Prototypes Two categories: TPC/Gaseous tracking – please chime in Solid-state (silicon  strip) tracking – will present some issues.
ILC Instrumentation R&D at SCIPP ILCWS ‘08 University of Illinois at Chicago November Bruce Schumm Santa Cruz Institute for Particle Physics.
SCIPP R&D on Time-Over-Threshold Electronics and Long-Ladder Readout Beijing Linear Collider Workshop Beijing, China February Bruce Schumm.
Beyond the Large Hadron Collider: R&D Towards an International Linear Collider Bruce Schumm SCIPP & UC Santa Cruz San Jose State Physics Seminar April.
SCIPP R&D on the International Linear Collider Detector SCIPP Review May 18, 2006 Presenter: Bruce Schumm.
SCIPP R&D on the International Linear Collider Detector DOE Site Visit June 28, 2005 Presenter: Bruce Schumm.
R Frey 9/15/20031 Si/W ECal Update Outline Progress on silicon and tungsten Progress on readout electronics EGS4 v Geant4 Ray Frey M. Breidenbach, D. Freytag,
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
The SCIPP LSTFE Time-Over- Threshold Electronics Readout Project SILC Meeting, Santander, Spain December, 2008 Bruce Schumm Santa Cruz Institute.
SCIPP R&D on the International Linear Collider Detector SCIPP Review November 29, 2005 Presenter: Bruce Schumm.
February 8 th, 2001 Status Report: SciFi for MICE Edward McKigney Imperial College London.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LC Workshop January 6-10, 2004.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LCWS05 July 28-31, 2004.
RESMDD'02 pCT: Hartmut F.-W. Sadrozinski, SCIPP INITIAL STUDIES on PROTON COMPUTED TOMOGRAPHY USING SILICON STRIP DETECTORS L. Johnson, B. Keeney, G. Ross,
SiLC Front-End Electronics LPNHE Paris March 15 th 2004.
28 June 2002Santa Cruz LC Retreat M. Breidenbach1 SD – Silicon Detector EM Calorimetry.
R&D Towards a Solid-State Central Tracker in NA World-Wide Review of LC Tracking January 8, 2004 Bruce Schumm SCIPP & UC Santa Cruz.
SCIPP R&D on Long Shaping- Time Electronics 4 th SiLC Meeting Barcelona, Spain (by remote connection) December Bruce Schumm.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LCWS05 July 28-31, 2004.
SCIPP R&D on Long Shaping- Time Electronics SLAC SiD Workshop October 26-28, 2006 Bruce Schumm.
SCIPP R&D on Linear Collider Tracking – Hardware and Simulation DOE Site Visit June Bruce Schumm Santa Cruz Institute for Particle Physics.
SCIPP R&D on Long Shaping- Time Electronics ALCPG Workshop Vancouver, BC, Canada July 19-22, 2006 Bruce Schumm.
SCIPP R&D on Time-Over- Threshold Electronics and Long- Ladder Readout LCWS 07 DESY May 30 – June Bruce Schumm Santa Cruz Institute for Particle.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz Victoria Linear Collider Workshop July 28-31, 2004.
MICE Tracker Readout Increased Data Readout Rate VLSB Development 16 AFE II t boards 8 Visible Light Photon Counter (VLPC) cassettes 4 cryostats.
SCIPP R&D on Linear Collider Tracking – Hardware and Simulation DOE Site Visit June Bruce Schumm Santa Cruz Institute for Particle Physics.
19 March 2005 LCWS 05 M. Breidenbach 1 SiD Electronic Concepts SLAC –D. Freytag –G. Haller –J. Deng –mb Oregon –J. Brau –R. Frey –D. Strom BNL –V. Radeka.
Silicon Microstrip R&D at SCIPP and the University of California at Santa Cruz Future Linear Colliders Spanish Network Universidad de Sevilla February.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz Cornell LC Workshop July 13-16, 2003.
ILC Tracking R&D at SCIPP SiD Workshop Thursday, June Bruce Schumm Santa Cruz Institute for Particle Physics.
The Gossamer Tracker: A Novel Concept for a LC Central Tracker Bruce Schumm SCIPP & UC Santa Cruz UC Davis Experimental Particle Physics Seminar June 3,
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: On-Orbit Calibration and.
Highlights From ILC R&D at SCIPP LCWS 2010 Friendship Hotel, Beijing, PRC March Bruce Schumm Santa Cruz Institute for Particle Physics.
ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
ILC Instrumentation R&D at SCIPP ILCWS ‘08 University of Illinois at Chicago November Bruce Schumm Santa Cruz Institute for Particle Physics.
LHCb VErtex LOcator & Displaced Vertex Trigger
ILC Instrumentation R&D at SCIPP ALCPG ‘09 University of New Mexico September 29 – October Bruce Schumm Santa Cruz Institute for Particle Physics.
FPCCD option Yasuhiro Sugimoto 2012/5/24 ILD 1.
Tracking at the ILC: Why Silicon Tracking is Best, and How it Might Be Optimized Bruce Schumm SCIPP & UC Santa Cruz STD6 “AbeFest” September 11, 2006.
SCIPP R&D on the International Linear Collider Detector DOE Site Visit June 28, 2005 Presenter: Bruce Schumm.
L.Royer– Calice LLR – Feb Laurent Royer, J. Bonnard, S. Manen, P. Gay LPC Clermont-Ferrand R&D pole MicRhAu dedicated to High.
The development of the readout ASIC for the pair-monitor with SOI technology ~irradiation test~ Yutaro Sato Tohoku Univ. 29 th Mar  Introduction.
SPIROC update Felix Sefkow Most slides from Ludovic Raux HCAL main meeting April 18, 2007.
J. Brau LCWS 2006 March, J. Brau LCWS Bangalore March, 2006 C. Baltay, W. Emmet, H. Neal, D. Rabinowitz Yale University Jim Brau, O. Igonkina,
Eleuterio SpiritiILC Vertex Workshop, April On pixel sparsification architecture in 130nm STM technology ILC Vertex Workshop April 2008 Villa.
SCIPP R&D on the International Linear Collider Detector DOE Site Visit June 8, 2006 Presenter: Bruce Schumm.
Silicon Microstrip Tracking R&D in the US SiLC Collaboration Meeting University of Paris VII January 25, 2010 Bruce Schumm Santa Cruz Institute for Particle.
ILC Instrumentation R&D at SCIPP ALCPG ‘09 University of New Mexico September 29 – October Bruce Schumm Santa Cruz Institute for Particle Physics.
CLAS12 Central Detector Meeting, Saclay, 3 Dec MVT Read-Out Architecture & MVT / SVT Integration Issues Irakli MANDJAVIDZE.
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics.
Silicon Tracker Data Acquisition and Electronics for the Linear Collider Jean-Francois Genat LPNHE Universite Pierre et Marie Curie CNRS/IN2P3 On behalf.
Thought on SCIPP’s Participation in SiLC Test Beam Activities
A General Purpose Charge Readout Chip for TPC Applications
Time-Over-Threshold Readout Long Ladder Readout Noise
Evidence for Strongly Interacting Opaque Plasma
Jean-Francois Genat LPNHE Universite Pierre et Marie Curie CNRS/IN2P3
CMS Preshower: Startup procedures: Reconstruction & calibration
ILC Instrumentation R&D at SCIPP
SiD Electronic Concepts
Analog Front-end electronics for the outer layers of the SuperB SVT: design and expected performances Luca Bombelli1,2 on behalf of the SVT-SuperB Group.
The CMS Tracking Readout and Front End Driver Testing
R&D Towards a Solid-State Central Tracker in NA
Presentation transcript:

Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SiLC Meeting November 18, 2005

Overview Status as of LCWS05 Test bench prepared NLC-oriented LSTFE-1 chip received, but basic design flaw precluded testing Current Status Test-bench control system completed Cold-technology-oriented LSTFE-2 designed & fabricated; tests beginning Long-ladder assembly under construction Back-end (digital) architecture designed and tested

Faculty/Senior Alex Grillo Hartmut Sadrozinski Bruce Schumm Abe Seiden Post-Docs Gavin Nesom Jurgen Kroseberg Students Michael Young Kunal Arya (Com- puter Eng. The SCIPP/UCSC ILC HARDWARE GROUP Lead Engineer: Ned Spencer Technical Staff: Max Wilder, Forest Martinez-McKinney

The Gossamer Tracker Ideas: Long ladders  substantially limit electronics readout and associated support Thin inner detector layers Exploit duty cycle  eliminate need for active cooling  Competitive with gaseous track- ing over full range of momenta Also: forward region…

THE LSTFE-2 CHIP Long shaping-time front end suppresses 1/f noise, allowing for long-ladder readout Power cycling should reduce IR heating by close to x100 Analog measurement via time-over-threshold (TOT) from low-threshold “readout” comparator. Redesigned relative to LSTFE-1 to accommodate long pulse train and exploit more relaxed (5 Hz) duty cycle. Submitted to TSMC 0.25  m mixed-signal RF process; received August 11 (5 weeks late)

3  s shaping time; analog readout it Time-Over-Thres- hold with 400 nsec clock

1/4 mip 1 mip 128 mip Operating point threshold Readout threshold

RMS Gaussian Fit RMS Gaussian Fit Efficiency and Occupancy as a function of high threshold Resolution as a function of low threshold SIMULATED PERFORMANCE FOR 167cm LADDER

1 mip Expected analog gain of 140 mV/fC confirmed Transition to log- arithmic response (TOT) at ~ 1.5 mip INITIAL RESULTS

DIGITAL ARCHITECTURE: FPGA DEVELOPMENT Digital logic should perform basic zero suppression (intrinsic data rate for entire tracker would be approximately 50 GHz), but must retain nearest-neighbor information for accurate centroid.

Status of Back-End Architecture Development First-pass digital strategy worked out FPGA code developed for 8-channel system Simulated data stream (including noise and detector background) injected and processed in simulation Data rates estimated

FIFO (Leading and trailing transitions) Low Comparator Leading-Edge-Enable Domain Proposed LSTFE Back-End Architecture Clock Period  = 400 nsec Event Time 8:1 Multi- plexing (  clock = 50 ns)

Master FIFO Per 128 Channel Chip: 1 Master FIFO reads out 32 local FIFO’s Store in Master FIFO essentially complete by end of ~1ms beam spill Controller FIFO Proposed LSTFE Back-End Architecture (cont’d)

DIGITAL ARCHITECTURE VERIFICATION ModelSim package permits realistic simulation of FPGA code (for now, up to signal propagation delay) Simulate detector background and noise rates for 500 GeV running, as a function of read- out threshold. Per 128 channel chip ~ 7 kbit per spill  35 kbit/second For entire long shaping-time tracker ~ 0.5 GHz data rate (x100 data rate suppression) Nominal Readout Threshold

LONG LADDER CONSTRUCTION

SUMMARY Progress on key fronts: Front-end electronics development LSTFE-2 chip (cold-rf optimization) designed and testing underway Digital architecture Proposed back-end architecture developed and verified; raw data rates acceptable (0.5 GHz) Ladder construction underway Substantial work remains in all these areas; working towards testbeam run in late 2006