1 Beam test at DESY Date: 01/12 – 19/12 Place: DESY, Testbeam area 24 Time schedule and more information available:

Slides:



Advertisements
Similar presentations
Goals and status of the ATLAS VME Replacement Working Group Markus Joos, CERN Based on slides prepared by Guy Perrot, LAPP 19/09/2012.
Advertisements

Kondo GNANVO Florida Institute of Technology, Melbourne FL.
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
T2K – Canada Accelerator & Detector Status D. Karlen University of Victoria & TRIUMF ACOT meeting, May 12, 2007.
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 25 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
Detector Systems Update MICO Feb 25, MICE Detector Systems  CKOV u CKOV installation planned during March shutdown u Cable issues resolved. Geneva.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
VC MICO Report July 07Jean-Sébastien GraulichSlide 1 Main news  DAQ test bench running in Geneva 2 LDCs connected to 2 different PCs, 1 GDCs DAQ trigger.
MSS, ALICE week, 21/9/041 A part of ALICE-DAQ for the Forward Detectors University of Athens Physics Department Annie BELOGIANNI, Paraskevi GANOTI, Filimon.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
Update on APV25-SRS Electronics Kondo Gnanvo. Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple.
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
FNAL testbeam planning Jan 27, 2014 Alain Bellerive.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
1 Daniel Dobos University Dortmund Pixel Testbeam July 2003 Daniel Dobos University Dortmund – E4 ATLAS-/Si-Meeting Pixel Testbeam July.
Rome 4 Sep 04. Status of the Readout Electronics for the HMPID ALICE Jose C. DA SILVA ALICE.
SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London CALICE a calorimeter.
EUDET Pixel-related DESY Tobias Haas 29 June 2006.
CMS pixel telescope at MTEST 1 A. Kumar, S. Kwan, A. Prosser, R. Rivera, M. Turqueti, L. Uplegger.
Steven Worm – RutgersMar 25, CMS Testbeam at Fermilab: Status and Plans o Testbeam Setup Status –Big pieces are now in place: telescope, Si, ROC,
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Low Momentum dE/dx Testbeam H.P. 7/24/98. Goals for Spectrometer are based on tracking and PID –Multiparticle correlation –production of particle species.
Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – March TOTEM System in H8 - Overview, Block Diagram and Main Characteristics Applications -
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
Mar. 31, 2003CAL Testbeam Discussion J. Yu 1 Calorimeter Test Beam Goals 1.Test of hardware technologies Feasibilities, properties and performances of.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
DESY TestBeam preparation CERN ) Michele Bianco, Marcin Drozdwa Byszewski, Givi Sekhniaidze, Joerg Wotshack.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
Chris Booth Sheffield 29th March 2006
Wander baldini on behalf of the SHIP Muon Group
INSIDE in-beam PET system assembly and test at INFN Torino
CLAS12 DAQ & Trigger Status
Jean-Sebastien Graulich, Geneva
DAQ for ATLAS SCT macro-assembly
Large Area Endplate Prototype for the LC TPC
EMU Slice Test Run Plan a working document.
Testbeam Timing Issues.
10/month is the present production rate 2 FTE + sporadic contributions
TileCal ROD Commissioning Counting Room Installation
The Online Detector Control at the BaBar experiment at SLAC
State of developments on Readout interface of European DHCAL
Testbeam status report
Setup for testing LHCb Inner Tracker Modules
Perugia SuperB Workshop June 16-19, 2009
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Presentation transcript:

1 Beam test at DESY Date: 01/12 – 19/12 Place: DESY, Testbeam area 24 Time schedule and more information available:

2 Test beam area 24 movable table fixture for scintillators magnet (not used) Good conditions in test beam area - plenty of space - no problem with usage of gas -comfortable counting room

3 Detectors and services 4 Warsaw modules are shipped from Nikhef to Heidelberg this week. Mechanical support and gas system can be provided by Heidelberg. Most effort still necessary for electronics (see next slides).  available manpower is limited!

4 Necessary Equipment (Hardware) 4 front end boxes  missing 1 distribution box (including I²C)  missing TTC-system : TTCvi + TTCvx  available 1 OrxCard + 12 LVDS Adapter  available 2 Stratix Boards + Adapter  available

5 Necessary Equipment (Hardware) Power supplies :  missing ± 5V / 50A 2.5V / 5A 3.3V /10A 3 PCs  available 2 Scintillator + Nim crate  available Cooling  missing (Peltier element + CPU cooler )

6 Necessary Equipment (Software) Stratix board code for 6 links  available in Dortmund?? Readout software for the  available Stratix Board via PCI-Bus DAQ monitoring  missing I²C control  available TTC control  available

7 Many components available, but system test is mandatory!