Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg, 27.06.2011.

Slides:



Advertisements
Similar presentations
BigBite Wire-Chamber Status Report Brandon Craver University of Virginia Hall A Collaboration Meeting June 23, 2005.
Advertisements

PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
HERMES tracking for OLYMPUS. Part #1. Detector survey. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Status at DORIS Hall New fixed cable channel on the floor for cables from outside to electronics hut Firedetection and network connections rerouted to.
Status at DORIS Hall Argus was removed by end of march Argus Parts (except 4 heavy pieces) shipped to Hall 1 Rails of electronics hut have to be extended.
THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING APRIL 2011.
1 Beam test at DESY Date: 01/12 – 19/12 Place: DESY, Testbeam area 24 Time schedule and more information available:
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
Luminosity Monitor MWPCs. Status and plans. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
CDF Silicon Workshop th May 2006 New BLM & BLM electronics Jose E. Garcia, Jennifer Gimmell, Ulrich Husemann.
Luminosity Monitor MWPC status report A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
UoA, NTUA, AUThATLAS Overview week 1-7 Oct 2004 BIS Integration and Commissioning Status All 112 bare BIS chambers are at CERN All but 5 are equipped with.
Status at DORIS Hall June 28th start of mounting the Al- frames, progressig very fast, finished by July 9th All 8 coils pressure tested with 15 bar = O.K.
OLYMPUS Collaboration Meeting Luminosity Monitor Symmetric Möller/Bhabha Calorimeter David Rodríguez Piñeiro Mainz University OLYMPUS Collaboration Meeting.
Monte-Carlo simulations and reconstruction for 12-degree ep-elastic Luminosity Monitor A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
Luminosity Monitor MWPCs, test beam 22 results. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
1 Timescales Construction LCR MICE Beam Monitoring counters + DAQ My understanding Jan 07 Feb 07 Mar 07 Apr 07 May 07 Jun 07 Jul 07 Aug 07 Sep 07 ISIS.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
PHENIX Run-14 Status January 28, 2014 Klaus Dehmelt 1Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting.
Construction and Installation of the CLIC Experimental Area
Hall A 12 GeV DVCS Status report December 16th 2013 Hall A collaboration meeting Alexandre Camsonne.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS.
1 SSD status report – 16 July 2004 Jerome Baudot, Strasbourg STAR Collaboration Meeting BNL, 16 July 2004 Silicon Strip Detector status report  Report.
2 1/March/2015 日本物理学会大70回年次大会@早稲田大学 東大ICEPP 内山雄祐 他 MEG II collaboration.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
1 Referee Report Olympus Elke Aschenauer Desy PRC, April 2011.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
FNAL testbeam planning Jan 27, 2014 Alain Bellerive.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
DVCS-2 Assembly & Installation Charles Hyde DVCS Collaboration Meeting 18 December 2009 Clermont-Ferrand.
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
CLAS12 Drift Chamber Prototyping
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
Tracker 1. Status 2. Expected delivery date of system to RAL 3. Required support infrastructure needed for setup and initial debug. Things like vacuum,
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
News from DESY. Joachim Mnich Plenary ECFA CERN, November 2011.
Status of HO Installation Shashi Dugad Tata Institute of Fundamental Research India-CMS Collaboration Meeting, Chandigar April 2007.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
S.DusiniOPERA meeting, LNGS May 2003 Cosmic Test Status Reports Remind of test setup Status report Gas and HVOK Strips and ElectronicsOK DAQalmost.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Baby MIND beam test status
10/month is the present production rate 2 FTE + sporadic contributions
Hall A Compton Electron detector overview
UK CMS Oversight Committee Mtg
Presentation transcript:

Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,

Equipment status  First two chambers tested in DORIS test run in February  Two more chambers checked in test beam 22 in May-June  Last two chambers to be delivered to DESY on July,3 …  … and tested in DORIS hall on July,4-5  Survey and final mounting in experiment on July,6-7  Missing CROS3 on-board electronics to be in HH on July,4  see short summary report to this meeting  see extensive report to the April’2011 meeting

Equipment status, continued  Gas system will be finished next week  Low voltage: use Rome modules  High voltage: hope to use OLYMPUS spares  Patch panels, cabling, trays, etc: two coming weeks  Electronics hut installation: next week  CROS3 readout: tested in DORIS and test beam 22 runs  Integration in Bonn DAQ: completed in DORIS test run

Test installation in OLYMPUS  MWPCs fit comfortable to the support rails  (Almost) no conflict with the drift chambers

MWPC design (April’2011 slide) CROS3 readout for the final setup  require design modifications! everything seems to fit together  will check in May with CROS3 have more freedom to vary Z-positions … … but also there are more problems with the cables  fine tuning in progress

Test installation in OLYMPUS  Comfortable clearance to the toroid coils  Yet space will become very busy after on-board electronics and cabling installation

Summary Test installation in OLYMPUS was successful Most part of equipment is delivered to DESY and checked Remaining part will be in HH in a week from now Full installation will require one more week