Luminosity Monitor MWPCs, test beam 22 results. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg, 27.06.2011.

Similar presentations


Presentation on theme: "Luminosity Monitor MWPCs, test beam 22 results. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg, 27.06.2011."— Presentation transcript:

1 Luminosity Monitor MWPCs, test beam 22 results. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg, 27.06.2011

2 Original motivation Test new MWPC modules Check PCOS4 readout integration in Bonn DAQ Check mechanical co-existence with the GEM modules Try out combined GEM-MWPC tracking?

3 DORIS test run -> test beam 22 Lead Glass Calorimeter MWPC#1,2 with the onboard electronics 2x prop.chambers (1mm spacing, XUV) 864 channels total modern CROS3 electronics (Gatchina)  ~1/3 of the final setup!

4 DORIS test run (April’2011 slide) almost no noise clear timing correlation with the trigger very low leakage currents (few  A at most) rather low hit multiplicities no sensitivity to synchrotron background on-board electronics works fine in “partly off-board” configuration useful acceptance ~105x105mm 2 confirmed relatively low efficiency (~95%)  last Feb’2011 run #285: ~60mA after injection, Bhabha electrons flux ~700kHz:

5 MWPC efficiency: HV scan  all 6 planes U1..V2 at CROS3 threshold 40  efficiency plateau starts at ~3500V

6 MWPC efficiency: threshold scan  all 6 planes U1..V2 at 3500V  will determine the actual threshold based on the noise conditions in the experiment

7 Summary Two new MWPC modules tested Electronics checked under routine operation MWPC efficiency confirmed to be well above 99%