K. Long, 12 June 2015 Project manager report WBS revision Technical Board Membership Meetings.

Slides:



Advertisements
Similar presentations
Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
Advertisements

Report to JMPB Topics: Progress Hall Clearance Programme Hall Layout Beam Line RF Power System MICE Management Structure Common Funds 14 th October 2003.
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
1 LBNL Enterprise Computing (EC) January 2003 LBNL Enterprise Computing.
AFC Schedule Review Tom BradshawWing Lau John CobbElwyn Baynham CM25 Collaboration Meeting November 2009 RAL.
AFC Schedules and Status Tom Bradshaw John Cobb Wing Lau Matt Hills MICE MICO Meeting 12 th October 2011 Elwyn Baynham Mike Courthold Victoria Bayliss.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
Defining the Project Chapter 4.
MICE VC 15/3/07Chris Nelson MICE Hall. Issues Realistically, I would expect D2 drawings to go for tender by end next week 23/3 but I hope we can use same.
1 paul drumm; ; FAC-PR MICE Project Status Funding Agency Committee 19 th September 2005.
Cooling Channel Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration.
Technical Specification / Schedule Department of Computer Science and Engineering Michigan State University Spring 2007 Team : CSE 498, Collaborative Design.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
MICE WBS rebuild/extract: Top level: – –PM: (Long acting) Level 2: –MICE Muon.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
paul drumm; 3rd December 2004; AFC MM 1 Cost & Schedule Review I Terms of reference: –To review the Cost and schedule of the MICE Muon beam –To review.
1 MICE Radiation Shutter Description Present status Plans, schedule and remaining work MICE CM26, 24-27th March, 2010.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
6. & 7. Teams: Technical Specification / Schedule Project Title Team Member 1 Team Member 2 Team Member 3 Team Member 4 Department of Computer Science.
OM480 Defining the Project Parameters – Work Breakdown Schedule (WBS) (With Material from the Text Authors)
Collaboration Board Summary K. Long, 27 June, 2015.
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
RFCC Module Tech Board Schedule Discussion Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 4, 2009.
CMPB Alain Blondel 14 April STATUS OF MICE.
MICE Wrap-up Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Paul Drumm 25 March 2004 MICE at Project Report CERN Collaboration Meeting 29 March 2004.
RF Cavity / Coupling Coil Module
MICE VC Alain Blondel 10 January MICE VC Jan 2008 MICE news -- BEST WISHES TO ALL FOR main outcomes of MICO meeting 9 January --
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for EPAC (Vittorio Palladino) o VC 20th May o VC 17th June o CM27 (RAL) 7th-10th July,
MICE CM39 Alain Blondel CB report 1 Report from the MICE collaboration board.
Report to the collaboration Yifang Wang IHEP Progress of the construction –SSM: Valve box successful, magnet cool down in mid June –Mechanical structure.
Project manager report paul drumm CM16 October 2006.
Week 6: Project Management E1102 – Design Fundamental Using Advanced Computer Technologies Spring 2010.
21 st Century Teaching and Learning The Demonstration Site for Modeling and Simulation (MODSIM) A Joint Endeavor: VBCPS/NIA/NASA LaRC.
K. Long, 10 October 2015 Project Manager’s report Status/progress since CM18 Looking forward Organisation Conclusions.
LIGO-G M Management of the LIGO Project Gary Sanders California Institute of Technology Presented to the Committee on Programs and Plans of the.
MICE CM 30 Collaboration Board Summary. Agenda 1. Approval of minutesBooth 2. Spokeʼs remarks & EB reportBlondel 3. Strathclyde request to join MICEKevin.
MICE Collaboration meeting (CM20) At RAL 10 – 13 Feb 2008 AFC Magnet – Status and Progress W. Lau, Oxford University.
1 MICE Report to the Oversight Committee February 2008 Ken Long, Andy Nichols and Richard Apsimon 25th Feb 2008 MICE Phase 1 Status MICE Phase 2 Overview.
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Norman McCubbin1 Report from the Collaboration MICE Project Board (CMPB) Norman McCubbin Director, Particle Physics Department MICE/UKNF Oversight Committee.
Spectrometer Solenoid Overview Roy Preece 31 st January 2011.
1 MICE Collaboration meeting at Berkeley 9 – 12 February 2005 Integrated Design & Safety Review Presented by Wing Lau & Paul Drumm.
MICE VC Alain Blondel 30 August MICE VC 103 MICE news -- see Malcolm's news for an inventory. -- great funding news all summer from USA! (phase.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
Hall clearance completed Revisiting Water & Cryo Plant Prepare for shutdown ’04 –beam tube –Contract hole cutting Negotiating with DF to help target work.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting September 21, 2004.
CMS-UK Oversight Committee 18/11/03 R M Brown - RAL 1 Exploded view of CMS ECAL Tracker HCAL 4T solenoid Muon chambers Total weight: 12,500 t Overall diameter:
1 Engineering Session Summary Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
MICE – Video conference Alain Blondel, 17 December   MICE selected NEWS: Future meetings Safety review Study of controls Gateway I & Toward Gateway.
MICE news video conference 15 march MICE NEWS 1.TOF0/1/2 funding 2.MICE Installation/Commissioning/Operations group (MICO) 3.Important issues from.
MICE CM23 Introduction and Meeting Goals Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
1 MICE UK meeting at RAL 05 May 2005 Integrated Design & Safety Review Presented by.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
US Construction Project: SSs, PRY, Cavities and test program 1.
MICE CM41 – CB summary Alain Blondel 1 Collaboration Board at CM41 Summary Alain Blondel.
1 MICE CM25 Engineering Session Summary Contents: Infrastructure Diffuser Coupling Coils Radiation Shutter AFC module EMR Andy Nichols, STFC, 4-7 th November.
Chris Booth Sheffield 29th March 2006
MICE CM28 Engineering Session Summary (On behalf of Wing)
Accelerator R&D for Future Neutrino Projects
Collaboration Board Summary
MICE NEWS MICE VC 155 Next Collaboration meeting will be
MICE PM Report Progress with the Infrastructure A few problems
S4 will be a “big” Collaboration:
Presentation transcript:

K. Long, 12 June 2015 Project manager report WBS revision Technical Board Membership Meetings

Work breakdown structure: revision

Plan for this week: Cummings, vacuum, radiation shutter, window, KL, Pietro Review at TB Present revised version to CB

Schedule revision: Review of WBS and schedule: November 2007

Technical Board:

Technical Board: membership: Collaboration charter: Extract:

Technical Board: membership: TB chair: Project Manager/Technical Coordinator Apsimon, Nichols Heads of all Technical subprojects WBS level 2 managers: Long (MMB), Nelson (MH&I), Bross (Instr.), Zisman (channel) RAL infrastructure representative Nelson Integration Engineer Lau Software chair Ellis Analysis coordinator Cobb Spokesperson Blondel Deputy Spokesperson Zisman Chairperson, Collaboration Board Long Others by invitation: E.g. WBS level 3 managers to report on status, schedule, plans etc.

Technical Board: standing items

Resource issues: MICE slow controls coordinator Online computer system Technical effort: Opporunity to learn systems at RAL Increased effort in the Hall