AFC engineering group meeting on the 26 th of Jan 2004 MICE Absorber Focus Coil work schedule for the next 6 months By Wing Lau, Oxford.

Slides:



Advertisements
Similar presentations
Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
Advertisements

Liquid Hydrogen Absorber
January 6. January 7 January 8 January 9 January 10.
Magnet Measurement Device for MICE F. Garnier, P-A. Giudici, F.Bergsma CERN MICE Collaboration Meeting No July 2011 Oxford technical drawings by.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
AFC Status Tom Bradshaw John Cobb Wing Lau Matt Hills MICE MICO Meeting 11 th January 2012 Elwyn Baynham Mike Courthold Victoria Bayliss 1.
MICE VC 15/3/07Chris Nelson MICE Hall. Issues Realistically, I would expect D2 drawings to go for tender by end next week 23/3 but I hope we can use same.
Agreement on scope of supply and extent of interface among different suppliers of the AFC module This talk covers the scope of supply on the Absorber Focus.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
Cooling Channel Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
MICE COLLABORATION MEETING CERN March 29-April 1, 2004 Detector/Focus Coil module interface details P. Fabbricatore INFN-Genova Detector/Focus Coil module.
paul drumm; 3rd December 2004; AFC MM 1 Cost & Schedule Review I Terms of reference: –To review the Cost and schedule of the MICE Muon beam –To review.
MICE Engineering Integration Update August 13, 2003 Edgar L. Black IIT.
1 MICE Radiation Shutter Description Present status Plans, schedule and remaining work MICE CM26, 24-27th March, 2010.
MICE Project Report Paul Drumm ~ Sunday August 1 st 2004.
Progress on the Coupling Coil & Focus Coil Interface Engineering
MICE Collaboration meeting at Berkeley 9 – 12 February 2005 Cooling Channel layout Presented by Stephanie Yang & Wing Lau.
MICE AFC Work Group meeting February 13, 2004 Introducing the Coat Hanger technique --- the Global reference system Wing Lau.
MICE Absorber and Test Cryostat Shigeru Ishimoto KEK MICE AFC Module Phone Conference (March 12, 2004) (1) MICE Absorber Test Process (2) MICE Absorber.
Paul drumm; 3rd December 2004; AFC MM 1 Why? Goal: Ultimate (CCLRC defined) Safety & Design Review –How do we get there? We need a Process –What is needed?
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
MICE Collaboration Meeting 17 CERN 21 – 25 Feb 2007 Summary on Magnet & MICE Integration talks By Oxford University.
Design of the MICE RF Cavity Module :Status of the module designModule flange sealing options Steve Virostek Lawrence Berkeley National Lab MICE
Integration March 18, 2004 Latest MICE integrated lattice layout Edgar L.Black IIT.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module progress update Wing Lau – Oxford.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Paul Drumm 25 March 2004 MICE at Project Report CERN Collaboration Meeting 29 March 2004.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
Liquid-hydrogen absorber: Shigeru Ishimoto KEK Contents (1)Introduction (2)MICE absorber design (3)Prototype absorber test at KEK (4)MICE absorber instrumentation.
MICE VIDEO Conference 17 th December 2003 Report on AFCSWG Safety Review -- Future Plan By Wing Lau -- Oxford.
Choose level of difficulty Jennie’s council has a target of 1/5 for households to recycle their waste. In January, Jennie recycled 1/10 of her household.
CSSM Meeting Summary CCSDS CSSM Technical Meetings San Antonio, Texas, USA 28 – 31 October 2013.
1 MICE PM Report Completion of Infrastructure Target, solenoids Phase Two planning & schedule Non-MICE costs Staffing & visitors Don’t have time for a.
Project manager report paul drumm CM16 October 2006.
MICE Collaboration Meeting Frascati 26 – 29 June 2005 Work Group report On Design & Safety Review.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
Time Management: Prioritization Wednesday, Jan. 29 Surviving Your GEs: Reading Tuesday, Feb. 11 Time Management: Scheduling Thursday, Feb. 27 Surviving.
Absorber Production Status Contents (1)MICE absorber design/status (2)MICE absorber instrumentation (3)Schedule (4)Summary Sasanqua at KEK on 13-DEC,’09.
MICE Collaboration meeting (CM20) At RAL 10 – 13 Feb 2008 AFC Magnet – Status and Progress W. Lau, Oxford University.
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Compressor status AWAKE Technical Board meeting 19 August 2015.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
MICE – MUON Interface meeting at Mission Inn, Riverside, California January , 2004 MICE Cooling Channel Integration Issues Wing Lau – Oxford & Steve.
1 MICE PM Report Outcome of Reviews held at CM22 –Motivation for holding them –Outcomes & actions –Observations & follow-ups MICE Video Conference, 20.
Design & Safety Review Work Group meeting 10 March 2005 Progress update Wing Lau, Oxford.
SunSatFriThursWedTuesMon January
MALAYSIA Feb 21 –22 February 21.
Decision Making. Alter the flow of the program Conditionally controlling execution of a set of commands if -statement: if a > b: print a.
1 MICE PM Report Infrastructure/integration progress Electrical work AFC, diffuser, etc Help with project control & staffing issues Worries & problems.
MICE – Video conference Alain Blondel, 17 December   MICE selected NEWS: Future meetings Safety review Study of controls Gateway I & Toward Gateway.
WBS ? Proposed by IPRP … –Preparation for a review –MICE Costs & Time Scales need to be more accurate & Justified –Technical Leaders arranged by technology.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
1 WBS 1 Preparation for FDRs NCSX WBS 1 Engineering Meeting March 17, 2003 What establishes the plan? What are near term deliverables? How will we status.
1 paul drumm; Date; Title …project report …more comments paul drumm february 2005.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
MICE Target – Status & Plans Chris Booth Sheffield 28 th February 2006.
MICE Prototype Coupling Coil Cooling Circuit Design Dan Cheng Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Chris Booth Sheffield 29th March 2006
Flexible lines production and planning
Engineering Design Day
Information Management & Financial Analysis for HR Managers
AIDA Asic Heatsinks Prototype received, and approved.
Ch. Boccard, M. Krupa, G. Schneider, R. Veness, M. Wendt
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
GDPR Dashboard General Data Protection Regulation 06/02/2018
Presentation transcript:

AFC engineering group meeting on the 26 th of Jan 2004 MICE Absorber Focus Coil work schedule for the next 6 months By Wing Lau, Oxford

The following is the AFC work schedule for the next 6 months. This is in accordance with Paul Drumm’s master schedule. The immediate miles stones are:- Agreement on the interface details by end of February so that we can draw up the re-baseline drawing before the MICE Collaboration meeting in CERN at the end of March 2004; Completion of the Mechanical seal test by the end of January 2004 to allow prototyping of the Absorber body which is due to start in Feb is this on-schedule?; Start of the Window manufacturing by the beginning of Feb 2004 to allow window test to commence in end Feb is this on schedule? R & D on the welded window to commence at the beginning of Feb We need to agree to work to this schedule with commitment.