Presentation is loading. Please wait.

Presentation is loading. Please wait.

CSSM Meeting Summary CCSDS CSSM Technical Meetings San Antonio, Texas, USA 28 – 31 October 2013.

Similar presentations


Presentation on theme: "CSSM Meeting Summary CCSDS CSSM Technical Meetings San Antonio, Texas, USA 28 – 31 October 2013."— Presentation transcript:

1 CSSM Meeting Summary CCSDS CSSM Technical Meetings San Antonio, Texas, USA 28 – 31 October 2013

2 Concept Book Reviewed Updates/re-writes identified Incl re-structuring to align with executive summary recently developed Project submission to secretariat by 31 Jan 2014

3 Schedule of Services (BB Track) Reviewed Needs an ICS – to be included Project submission to secretariat as R1 for agency review by 31 Jan 2014 Prototyping Test Plan to be updated for available resources test case (unused time publication) Testing to be completed by 11/30/13 Prototype test report to be ready by 31 Jan 2014 Question of ground station and mission IDs for SANA registry raised There are no such registries currently in SANA

4 Configuration Profile/Service Agreement Reviewed Concepts/Functional Resources, Extensibility Mechanisms Working issue of how much extensibility to expose vs pre-cooked configuration profile to meet major use cases - E.g., service delivered via CCSDS 401 vs 415 vs optical schemes/spacelink protocols Action for Spring meetings is to apply service catalog against catalog 1 and determine number of functional resource combinations to help inform how much extensibility to expose and also validate FR concept (See next two slides for FG/FR overview)

5 SCCS Functional Groups

6 Functional Resource Map

7 Service Request/Service Package Reviewed concept/approach Agreed to work on analysis for Spring 2014 mtgs deducing service request/service package specific extensibility needs Work boundary issues between schedule of services and service package - But not at the expense of producing SoS R1

8 Planning Information Separated input (mission constraints) from output data format considerations (network induced communications geometry constraints) Agreed to take work analysis for Spring 2014 mtgs Comparing agency inputs re geometric calculations - E.g, CNES “Station Plan” vs. ESA “Standing Orders” and “Orbit Event Files” vs NASA “Viewperiods”, “PSATs”, etc Prioritize output format re geometric calculations “visibilities” in accord with stated IOAG priorities (see April 2012 report to CMC).

9 DDOR WG Joint Meeting DDOR WG presented overview of DDOR service Presentation in CWE DDOR WG agreed to review draft Schedule of Services (aka Simple Schedule) Some preliminary assessment done re configuration profile and DDOR services config profile -- there are standard and also variable scan patterns (e.g, quasar-spacecraft-quasar) dwell times vary (not standardized) no standard correlator vs producer vs consumer patterns

10 Blue-1 Test Report Copy of consolidated, updated B1 test report from JAXA received and gratefully acknowledged NASA commits to updating the consolidated document for release

11 Not Addressed at Mtg (Relative to Agenda) Event Sequence book draft outline Trajectory Prediction book draft outline

12 Longer term project definitions Current projects updated re revised milestone dates Also agency commitments updated/noted where possible Two new projects defined in CWE Trajectory prediction Management services (service management automation)

13 Plan for next 6 months Green Book to Secretariat – Jan 2014 SoS R1 to Secretariat – Jan 2014 SoS Prototyping Completed -- Dec 2013 SoS Prototype Test Report -- Dec 2013 Planning Information preliminary draft – Feb 2014 IOAG SC 1 Analysis re config profile combos – Mar 2014 Service Request/Package extensibility structuring analysis – Mar 2014 Event Sequence engineering concepts – Mar 2014 Telecon Schedule Identified: T1: 19 November 2013 T2: 10 December 2013 T3: 14 January 2013 T4: 28 January 2014 T5: 18 February 2014 T6: 04 March

14 Thank you Thank you to Participants for traveling to and contributing to productive meetings Southwest Research Institute for excellent meeting facilities


Download ppt "CSSM Meeting Summary CCSDS CSSM Technical Meetings San Antonio, Texas, USA 28 – 31 October 2013."

Similar presentations


Ads by Google