Endcap Muon meeting: Florida, January 9-10, 2004 J. Hauser UCLA 1 TMB, RAT, and ALCT Status Report Jay Hauser University of California Los Angeles ALCT/Mezzanine.

Slides:



Advertisements
Similar presentations
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Advertisements

TMB and RAT Status Report Endcap Muon OSU April 16, 2004 Yangheng Zheng University of California, Los Angeles  TMB Status  RAT Status.
Endcap Muon meeting: UC Davis, Feb , 2005 J. Hauser UCLA 1 TMB and RAT Status Report Outline: Current status of TMB and RAT boards Noise measurements.
Martin von der Mey, EMU at CMU, October ALCT and TMB Status Martin von der Mey University of California Los Angeles ALCT production statusALCT production.
Endcap Muon meeting: FNAL, Oct , 2004 J. Hauser UCLA 1 TMB and RAT Status Report Jay Hauser University of California Los Angeles.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
Update on SP02 design by Victor Golovtsov & Lev Uvarov Trigger Meeting at Rice August 2002.
HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Uli Schäfer 1 Production and QA issues Design Modules have been designed, with schematic capture and layout, in Mainz (B.Bauss) Cadence design tools, data.
TMB and RAT Status Report Endcap Muon OSU June 6, 2004 Martin von der Mey University of California, Los Angeles  Previous Status (OSU, April)
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
21 January 2003Paul Dauncey - UK Electronics1 UK Electronics Status and Issues Paul Dauncey Imperial College London.
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Status of the CSC Track-Finder Darin Acosta University of Florida.
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
CSC Endcap Muon Sorter Mezzanine Board Rice University July 4, 2014.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
UCLA Group Meeting May 01, 2014 Andrew Peck Shayan Rastegari 1 Updates from Lab Andrew Peck & Shayan Rastegari May 01, 2014.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
DAQMB Production Status S. Durkin The Ohio State University Florida EMU Meeting 2004.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
March 2005, USCMS Trigger video meetingD. Acosta1 Revised Schedule for SP Pre-Production Continued testing of first two pre-production boards over next.
1 ME1/1 OTMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
SP04 Production Lev Uvarov RICE Muon Trigger Meeting August 27, 2004.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
CSC Muon Sorter M. Matveev Rice University January 7, 2003.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.
TDC/TEL62 update M. Sozzi NA62 TDAQ WG meeting Bruxelles – 9/9/2010.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
CSC Hardware Upgrade Status
University of Wisconsin
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
University of California Los Angeles
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
University of California Los Angeles
Muon Track-Finder Trigger
University of California, Los Angeles Endcap Muon Purdue
CMS EMU TRIGGER ELECTRONICS
MicroTCA Common Platform For CMS Working Group
University of California Los Angeles
ALCT Production, Cable Tests, and TMB Status
University of California Los Angeles
University of California Los Angeles
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
CSC Trigger Update Specific issues:
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
TMB, RAT, and ALCT Status Report
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Muon Port Card & Sector Processor in production
University of California Los Angeles
TMB and RAT Status Report
CSC Trigger Meeting Summary
Jason Gilmore Vadim Khotilovich Alexei Safonov Indara Suarez
University of California Los Angeles
Sector Processor Status Report
SP Main FPGA & DT transition card design status
Plans for the 2004 CSC Beam Test
Presentation transcript:

Endcap Muon meeting: Florida, January 9-10, 2004 J. Hauser UCLA 1 TMB, RAT, and ALCT Status Report Jay Hauser University of California Los Angeles ALCT/Mezzanine production statusALCT/Mezzanine production status TMB statusTMB status RAT statusRAT status

Endcap Muon meeting: Florida, January 9-10, 2004 J. Hauser UCLA 2 ALCT/Mezzanine Card Production Base ALCT boards:Base ALCT boards: All built and debugged (10% spares)All built and debugged (10% spares) Occasional fixing of boards returned from FAST sites (esp. PNPI)Occasional fixing of boards returned from FAST sites (esp. PNPI) Spare and Port Card mezzanine boards:Spare and Port Card mezzanine boards: Assembling 162:Assembling 162: –25 XCV1000 type for ALCT672 (20% spares). –71 XCV600-7 type for ALCT288 and ALCT384 (15% spares). –66 XCV600-8 (fast) type for Muon Port Cards. Some problem with 1/3 of PC boards had to be remade with flatter finish (gold) for ball-grid assemblySome problem with 1/3 of PC boards had to be remade with flatter finish (gold) for ball-grid assembly 2/3 of boards can be checked out by end-January, remainder by end- February.2/3 of boards can be checked out by end-January, remainder by end- February.

Endcap Muon meeting: Florida, January 9-10, 2004 J. Hauser UCLA 3 TMB2003A and RAT2003A 4 boards produced and bench-tested Replaces problematic PHOS4 fine delays with commercial DDD devices Faster and larger FPGA (Xilinx Virtex-2 XC2V3000) on mezzanine board ALCT and RPC inputs through RAT (Rpc Alct Transition) board Rad-hard regulators used, 1.5v added for Virtex-2 core voltage

Endcap Muon meeting: Florida, January 9-10, 2004 J. Hauser UCLA 4 TMB Status and Plans TMB2003A and RAT2003A prototypes both debugged & pass all tests. Plan for 25 sets: 18 for two full crates +2 spares at CERN +1 JK +1 OSU +1 Rice +1 UC +1 additional spare. Produce that number of TMB base boards, mezzanine cards, and RAT modules. Produce 5 TMB front-panels with ALCT cable access (for debugging), 20 without (for CERN) Modest changes needed to base board layout: Get rid of blue wires (minor errors). Swap Virtex-2 I/O assignments so as to not use global clock lines. Dual regulator configuration to allow Spartan-3 upgrade (1.2v core voltage).

Endcap Muon meeting: Florida, January 9-10, 2004 J. Hauser UCLA 5 RAT Status and Plans Current boards are fine for ALCT inputs (ME2,3,4). Will make very minor near-term layout changes (few LEDs, etc). Longer-term: Need feedback from data interchange tests with RPC Link boards (~May at CERN). May want to move RPC connectors back a little (~1.5 cm). Will need to finalize ME1 RPC cables, routing, strain relief.

Endcap Muon meeting: Florida, January 9-10, 2004 J. Hauser UCLA 6 TMB Mezzanine Card Plans Problem #1: global clock buffers used for Virtex-2 I/O do not tri-state properly This use allowed by written Xilinx documentation but dis-recommended verbally! Current temporary solution: yank the lines to a proper state with low- impedance resistors. However: timing may not be good. Better solution: modified layout of the Mezzanine card so as to not use these lines for I/O. Discussing this with Golovtsov et al. (PNPI). Problem #2: Virtex-2 are expensive, Spartan-3 are ½ the cost XC2V3000 fits budget and current (test-beam) algorithm, but algorithm gave non-ideal results XC2V4000 large enough for proper ordering of pattern qualities but blows our budget by about $400K. Solution: new mezz. card layout for Spartan-3 chips. However: the chips and the new layout may not be ready for Slice test. Plan: fix Virtex-2 mezz. layout, work on Spartan-3 layout, branch point around mid-Feb.

Endcap Muon meeting: Florida, January 9-10, 2004 J. Hauser UCLA 7 Schedule TMB base and RAT boards: Feb. 1: layout changes done Feb. 15: PC boards produced Mar. 1: boards assembled March-April debugging May 1: 25 sets ready for system tests May 31-June 6: CERN test beam TMB Mezzanine Card (subject to discussion with PNPI): Feb. 1: layout changes done Feb. 15: PC boards produced Mar. 1: boards assembled March-April debugging May 1: 25 sets ready for system tests May 31-June 6: CERN test beam

Endcap Muon meeting: Florida, January 9-10, 2004 J. Hauser UCLA 8 TMB 2003A Detail

Endcap Muon meeting: Florida, January 9-10, 2004 J. Hauser UCLA 9 RAT2003A Detail These Connectors for GND Only RPC connectors To TMB and 3.3v, 1.8v power ALCT SCSI input connectors Spartan 2E FPGA for RPC