Schedule Remove ARGUS experiment - Fall 2009 Disassemble and ship OLYMPUS detector - Spring 2010 Ship target and beamline – Fall 2010 Modify DORIS beam-line.

Slides:



Advertisements
Similar presentations
Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
Advertisements

April 6th 2009Olympus Meeting at DESY, F.Brinker1 Detector power supply Detector cooling Polarity switches Kicker pulser Preparation of the experimental.
E.Clément Novembre 2011 E.Clément GANIL AGATA Days February 2013 AGATA Campaign at GANIL  Setup to be integrated  Project Organization and.
1/22 MOLLER Juliette M. Mammei. 2/22 Working Groups Polarized Source Hydrogen Target Spectrometer Integrating Detectors Tracking Detectors Polarized Beam.
ALICE © | RRB | 17 April 2013 | Catherine Decosse 24 th meeting of the ALICE Resources Review Board CERN-RRB
Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
Purpose: Integration of AGATA detectors in triple modules Acceptation tests of triplets (energy resolution, crosstalk,…) Complementing the scanning table.
September 15th 2009Olympus technical review at DESY, F.Brinker1 DORIS storage ring Olympus in the IP-region Beam optic, changes on the lattice Beam dimensions,
Status at DORIS Hall Argus was removed by end of march Argus Parts (except 4 heavy pieces) shipped to Hall 1 Rails of electronics hut have to be extended.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Status of the Forward Elastic Scattering Luminosity Monitor Hampton University, Hampton, VA Jefferson Laboratory, Newport News, VA OLYMPUS.
Luminosity Monitor MWPCs. Status and plans. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Richard Milner April 22, Internal Target Experiment at DORIS Proposal of a new experiment at DORIS using the available MIT-BLAST detector and.
MICE CMPB 3-Feb-2006 Alain Blondel 1 Status of MICE.
OLYMPUS U.Schneekloth/R.Beck PRC closed session
D. Peterson, Cornell Univ., “Round table” 23-Jan-2003 Cornell Linear Collider Detector Research Cornell Interests: The Cornell group proposes to contribute.
DESY PRC May 10, Status of OLYMPUS -Project DESY PRC MAY 5, 2009 OLYMPUS-Proposal conditionally approved by PRC October 2008: 1.) details of the.
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
D. Peterson, “Tracking Detector R&D at Cornell University and Purdue University” ALCPG SLAC 07-Jan Tracking Detector R&D at Cornell University and.
Richard MilnerDESY April 6, OLYMPUS Overview Motivation for the experiment Progress to date on the experiment The path forward.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
SBS Program Management John J. LeRose SBS Collaboration Meeting October 18,
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.
2 1/March/2015 日本物理学会大70回年次大会@早稲田大学 東大ICEPP 内山雄祐 他 MEG II collaboration.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
1 Referee Report Olympus Elke Aschenauer Desy PRC, April 2011.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
News from DESY. Joachim Mnich Plenary ECFA CERN November 20, 2014 XFEL PETRA III & FLASH II Particle Physics DESY Test beam.
AHCAL Mechanics status report Karsten Gadow CALICE Collaboration Meeting Argonne,
Thia Keppel 6/4/13 Hall A Update. Near term accelerator schedule – same as last meeting Accelerator Run II: Beam in hall 3/2014, or maybe as early as.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
1 Collaboration Meeting JLAB January 2008 Project Status Update E.C. Aschenauer.
10/25/2007GlueX Collaboration Meeting1 October 25-27, 2007 Jefferson Lab This is approximately our 20’th such meeting.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
PRad Recent Achievements 1)PRad Implementation (“Position”) document developed and submitted to Jlab. 2)Jlab’s Director Office scheduling review passed.
Budget Status and FY03 Requests Elton Smith Hall D Collaboration Meeting Sep 12-14, 2002.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.
Resources, Timeline & Contingency UCN CDR (Sept/2010)
Hall A Installation Review John J. LeRose 2/25/2009.
HPS Summary Costs, Manpower, Schedule John Jaros Searching for a New Gauge Boson at JLab Jefferson Laboratory September 20, 2010.
News from DESY. Joachim Mnich Plenary ECFA CERN, November 2011.
1- Handling The Olympus GEMs at MIT-BATES between June 6th-August 8th Manufacturing The GEMs at HU-GEM LAB since Sep 2010 OZGUR ATES HAMPTON UNIVERSITY.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
STATUS OF COMPASS. /74 Status of the Collaboration MoU signatures Status of the run – Preparation – Run 18/11/2014COMPASS FRC - 17th meeting2 Outline.
Project Overview James Fast Pacific Northwest National Laboratory.
Eurisol DS, Task 11 meeting, Helsinki September‘07 Task 11.2: Fragmentation of post accelerated ISOL beams David Pérez Loureiro Universidad de Santiago.
Hall A Update Thia Keppel User Group Board of Directors January 2015.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
Electromagnetic Calorimeter Development at NCCU
TC activities.
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
Draft SuperB Organization Chart for TDR Phase
Overview of LERF Status, Plans and Goals
MICE Project in the US: Completion of Efforts
THE GRANT-MAKING PROCESS
S4 will be a “big” Collaboration:
Francesco Forti University and INFN, Pisa
The DESY ATLAS Group The Group and ALFA Physics SLHC upgrade
THE GRANT-MAKING PROCESS
ILC Main Linac Superconducting Splittable Quadrupole
Workforce / Students / Tasks
Presentation transcript:

Schedule Remove ARGUS experiment - Fall 2009 Disassemble and ship OLYMPUS detector - Spring 2010 Ship target and beamline – Fall 2010 Modify DORIS beam-line and install OLYMPUS target - Winter 2010/11 Assemble OLYMPUS detector – Spring 2011 OLYMPUS commissioning in parking position – Spring 2011 Install complete OLYMPUS experiment - Summer 2011 Commission OLYMPUS - Fall 2011 –Parasitic mode and some dedicated shifts during service weeks Take data Schedule discussed/agreed with DESY M, FS and FH directors

Funding German groups submitted grant request to the BMBF, December 2008 American groups submitted grant request to NSF and DOE January 2009 Funding Requests: Transportation BLAST-detector: 626,-k$ only American Groups DOE GEM and wire chamber upgrade 95,- k$ only American Groups, DOE Target: 450,- k$ only American Groups NSF,DOE Luminosity Monitor: 120,- k$ only American Groups NSF,DOE Trigger, DAQ: 235,- k € Bonn, Erlangen, Mainz BMBF Postdoc, PhD-Students 480,- k € Bonn, Erlangen, Mainz BMBF New Intersection Region: 280,- k € only European groups DORIS Modifications: 487,- k € all groups OLYMPUS Cooling and power: 365,- k€ Bonn, Mainz + others OLYMPUS Operation Costs: 585,- k € all groups DORIS Operation Costs: 450,- k € direct request to BMBF or DESY

Man-power Institute (Faculty) Scientist PhD-Student Engineer Requested (FTE) (FTE) Bonn: R. Beck, F. Klein, 2 * (0.5 FTE) 1 2 * (0.25 FTE) 1 Postdoc H. Schmieden Mainz: A. Denig, F. Maas 3 * (0.30 FTE) 2* (0.25 FTE) 1 Postdoc D. von Harrach 1 PhD student Erlangen: E. Steffens 1 * (0.10 FTE) Arizona State U.: Alarcon 1 * ( 0.3 FTE) 1 Hampton Univ.: 1 Postdoc (0.5 FTE) Kohl 1 1 PhD student MIT: Milner, Matthews, Redwine 2 * FTE 2 2* (0.75 FTE) Univ. Of Colorado: Kinney 1 * ( 0.2 FTE)

Institute (Faculty) Scientist PhD-Student Engineer Requested (FTE) (FTE) Univ. of Kentucky: Crawford 1 Univ. of New Hampshire: Calarco 1* (0.5 FTE) 1 Glasgow: Rosner, Kaiser 1 * (0.3 FTE) 1* (0.5 FTE) 1 PhD student 1 Postdoc St.Petersburg: Belostotski 2* FTE 1* FTE will apply in 2010 Italy groups De Leo, Nappi 2 * FTE 2 * (0.25 FTE) 2 PhD students Ferretti Dalpiaz will apply in 2010 Lenisa, Cisbani, Frullani, Garibaldi DESY: F. Brinker, Y. Holler 2 * FTE 2 * FTE U. Schneekloth 2 * (0.5 FTE) Man-power

OLYMPUS Infrastructure Items cost man power start institute funding (k€) (FTE) design construction Cooling system /09 11/09 Mainz (Bonn) k€ + external 0.75 FTE Transformer, power supply, /09 11/09 DESY, MIT cabling + external

DORIS Modifications Main items cost man power start institute funding (k€) (FTE) construction Polarity switches /09 Bonn (+Mainz) 60 k€ 0.25 FTE Power/signal cables /10 DESY + ext. Quadrupoles /09? DESY 38 k€ 1 FTE Mod/rebuild kicker /09 DESY Vacuum system 28 (50) 1 (2) 11/09 MIT, DESY (may be needed) Remove ARGUS /09 DESY, Yerevan St. Petersburg Construction work /10 DESY + ext. Rebuild IR /10 DESY + institutes other items 85 Sum 797 (50) 7.6

Cost Estimate – Investments Possible in-kind contributions of institutes –Cooling system (design, ordering, setup,…) –Cabling from power supply to toroid –Polarity switches (assembly in workshop) –Modification of vacuum system –Send technicians (ARGUS removal, modification of IR,…) –Currently available k €, 2 FTE of total 797 (50) k€ and 7.6 FTE Could save about 100k€ in power costs in case of early modification of quads

OLYMPUS TDR Scientific goals (from proposal) DORIS beamline (F. Brinker, J. Hauschildt) OLYMPUS experimental configuration (U. Schneekloth, J. Hauschildt, J. Kelsey)) Tracking chambers (D. Hasell, E. Kinney) Scintillator detectors (J. Calarco) Target system (R. Milner, E. Steffens, P. Lenisa, J. Kelsey) Luminosity monitor (M. Kohl) Electronics (R. Beck) Data acquisition, online system (TBA) Expected performance (MIT, C. Crawford) Propose: Draft chapters: September collaboration meeting TDR completed: December 1 st

9 Future OLYMPUS Meetings Collaboration meeting - September 2009 –finalise TDR draft –discuss collaboration organisation MOU’s prepared over summer 2009 Technical meeting at MIT with DESY staff – Summer 2009 Technical meeting at DESY – Collab. Meeting Sept Meeting of US Collaboration at MIT-Bates - Summer 2009