Circulation Solutions that Preserve the Current Dinky Terminus Alain L. Kornhauser 24 Montadale Circle Princeton Township.

Slides:



Advertisements
Similar presentations
Critique of PU A&T Site Plan Alain L. Kornhauser, PhD 11/29/
Advertisements

Full Kornhauser. Full Kornhauser Issues Not surprisingly, tunneling to Palmer Square is no easy matter. The tunnel route must go under road infrastructure,
increase West Windsor resident parking
Access & Circulation to a Moved Dinky Terminus Alain L. Kornhauser 24 Montadale Circle Princeton Township.
What is the S-48 Corridor? Study Area What’s Happened So Far? Previous Tasks  Project InitiationJune 2005  Existing ConditionsOct  Planning.
NICHOLS SCHOOL TRAFFIC OPERATIONS STUDY. Existing Operations Examined Data Collection  On-site Count Collection of Representative Traffic Conditions.
An Advanced Transit Alternative for The Princetons Alain L Kornhauser 24 Montadale circle Board Chair Advanced Transit Association Founder ALK Transportation.
Design of Parking Facilities.  Location  Type of Operations  Surface Car Parks  Parking Garage / Underground  Access  Layout  Pedestrian  Bus.
1 Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area Township of West Windsor September 8, 2008 Urbitran | DMJM Harris.
West Contra Costa Unified School District
A case of sustainable development.  Hopewell centre II is located in zone of transition in Wan Chai  Adjacent to CBD  A mixed commercial-residential.
Transport.tamu.edu Options for Access Improvements Near MSC Wednesday, December 7, 2011.
Signals, Signs, and Road Markings Sophomore Driver Education.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
South Coast Rail Project February 28, 2014 Stoughton Town Hall.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Department of Architecture and Regional Planning, IIT, Kharagpur Perspective Plan for Barddhaman Planning Area – Vision 2025 TRAFFIC & TRANSPORT.
Addressing The Dinky Terminus Must Move Issue Alain L. Kornhauser Montadale Circle Township.
Lec 25, Ch.7, pp : Intersection types and design principles (Objectives) Become familiar with the typical intersection types (See figures 7-1 thorugh.
Access & Circulation to a Moved Dinky Terminus Alain L. Kornhauser 24 Montadale Circle Princeton Township.
Investigating Traffic in Glasgow
School travel planning an engineer will love. School travel in Moonee Valley Need: A more planned and coordinated approach to active travel program delivery.
“Making Michigan State University’s Campus More Bike Friendly” Presentation at Nov. 21, 2013, TCBA Membership Meeting Tim Potter MSU Bikes Service Center.
August 2004 Hickory by Choice Linking Land Use and Air Quality Planning.
Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.
Lexington Town Center Streetscape Project Page 1 Battle Green Improvements Project Intersection of Bedford Hancock Street / Harrington Road Board.
Wheely Wednesday Thursday, August 10, 2006 Wheels Around Edmonton aka Welcome to the Sides of your Tires.
September 25, 2010 Ultimate Accessibility Through Modernization and Extension of the Dinky to Palmer Square Alain L. Kornhauser Resident, Montadale Circle.
South Parkway Refinement Plan F Context of the plan F Goals of the plan F Major issues F Parkway/Third Street alternatives F City of Bend, ODOT assess.
Gone Riding Event Traffic. Place in main access road to direct traffic away from the regular trailhead & towards the event parking lot. Re-usable DO NOT.
San Juan Greenway WJI PRODUCTIONS Cycling and Walking Centennial Trails Project.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Redesigning the Seoul Subway Transformers. Index 1. Defining problems 2. Solving process 3. Solutions.
Public safety (vehicular & pedestrian) Worker safety Maintenance of traffic flow Business access Maintenance of utility services.
Circulation Solutions for Alexander-University Congestion Alain L. Kornhauser 24 Montadale Circle Princeton Township.
September 25, 2010 Ultimate Accessibility Through Modernization and Extension of the Dinky to Palmer Square Alain L. Kornhauser Resident, Montadale Circle.
Alain L. Kornhauser, PhD Professor, Operations Research & Financial Engineering Director, Program in Transportation Faculty Advisor, Princeton Autonomous.
1. Variety of modes (types) of transport (public and private) 2. Density of transport networks more nodes and.
Traffic Signal Timing Design Part II. Slide 2 What to do?  Distribute volume among lanes to Identify lane utilization Determine need for lane adjustment.
Slides for Nov 1 Planning Board Meeting. The Arts Campus Can be built without touching the Dinky.
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
Problem 4: Okeechobee Road Stopped Control Analysis.
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
September 30, 2010 Whereas, Ultimate Accessibility Through Modernization and Extension of the Dinky to Palmer Square Alain L. Kornhauser Resident, Montadale.
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Agenda Methodology Major Findings –Perceptions of Congestion –Ease of Travel –Transportation Planning Issues –Interest in Using Public Transportation.
Consideration of Dual Left Turns at 82 nd Street Intersections & at 50 th Street Intersections City of Lubbock Citizens Traffic Commission By: Jere Hart.
PARKING…..
IENG 471 Facilities Planning Personnel Planning - Parking
C & C CONSTRUCTIONS LTD. BUS TERMINUS & COMMERCIAL COMPLEX, MOHALI.
April 20, 2012 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Fehr & Peers | December 13 th, 2011 Traffic Access and Circulation Analysis Pinole Valley High School Reconstruction.
Fehr & Peers | March 13 th, 2012 Traffic Access and Circulation Analysis Pinole Valley High School Reconstruction.
Summary Results for: Roundabout Peer Review & Gap Project Evaluation Presented by: City Council: July 2, 2013Presenter: Scott Ritchie, P.E. RoundaboutsCorridorsSignals.
Project Development and Environmental Study (PD&E) S.R. 30 (U.S.) 98 Gregory Street and Bayfront Parkway at 17 th Avenue Intersection Project Development.
LoRaWAN Use Cases Ali Hosseini / SenRa.
JUAN DE FUCA PEDESTRIAN CROSSING Transportation and Public Infrastructure Committee Colwood, BC 1 October 2012.
2a. Fully actuated signal - Improved T intersection
Problem 2: Moe Rd/Route 146 Intersection
9th & Colorado Redevelopment Impacts Denver Public Works - Traffic Safety recommendations Community feedback Survey Results Conducted by: Colorado.
Analysis of Walk Distances to Major Venues from existing and proposed station locations by Alain L. Kornhauser 12/18/12 Format of labels: Name (Walk Distance.
CE 3500 Transportation Engineering Saturation flow and signal LOS
Problem 3: Shenendehowa Campus
Изразеното в настоящата презентация мнение обвързва единствено автора и не представлява официално становище на Комисията за финансов надзор Данил Джоргов.
WELCOMES YOU TO THE COMMUNITY OPEN HOUSE OCTOBER 2018.
Tomken Road Middle School Kiss and Ride Changes
Radical Improvements for the Area's Transportation System
Presented at Princeton Future Princeton Public Library, Princeton NJ
State Route 55 Improvement Project from Interstate 5 to State Route 91
Presentation transcript:

Circulation Solutions that Preserve the Current Dinky Terminus Alain L. Kornhauser 24 Montadale Circle Princeton Township

View in “Slide Show” mode There are a substantial number of important animations

z 100% 30% 70% Road Flow North-Bound Alexander Road Flow North-Bound Alexander

100% 50% Road Flow South-Bound Alexander Road Flow South-Bound Alexander

Alexander & University Place

Solution: One – Way Flow Solution: One – Way Flow

Flow Alexander & University Pl.

Minimal Conflicts; Readily Accommodates Pedestrians Minimal Conflicts; Readily Accommodates Pedestrians

Before - After Traffic Flow Impacts: NB Alexander – RT University (Largest Flow) Before - After Traffic Flow Impacts: NB Alexander – RT University (Largest Flow) Before 70% 100% No Change! 100% 70% After

Before - After Traffic Flow Impacts: NB Alexander – RT Mercer (Largest Flow) Before - After Traffic Flow Impacts: NB Alexander – RT Mercer (Largest Flow) 100% 15% Before 15% After Incr. NB Univ Decr. NB Alex. & Mercer 100% Before - After Traffic Flow Impacts: NB Alexander – RT Mercer Before - After Traffic Flow Impacts: NB Alexander – RT Mercer

Before - After Traffic Flow Impacts: NB Alexander – RT Mercer (Largest Flow) Before - After Traffic Flow Impacts: NB Alexander – RT Mercer (Largest Flow) 100% ~ 10% Before 7.5% After Incr.: NB Univ &WB College & Mercer Decr.: NB Alex. Decr.: NB Alex. 100% 15% ~ 5% 7.5% 2.5% Before - After Traffic Flow Impacts: NB Alexander – LT College or Mercer Before - After Traffic Flow Impacts: NB Alexander – LT College or Mercer

Incr.: SB Alex. &WB College Decr.: SB Univ. Decr.: SB Univ. Before - After Traffic Flow Impacts: SB University Before - After Traffic Flow Impacts: SB University 50% 100% Before 50% After 100%

Before - After Traffic Flow Impacts: SB Alexander Before - After Traffic Flow Impacts: SB Alexander No Change! 50% 100% Before 50% After 100%

Before - After Traffic Flow Impacts: Combined Before - After Traffic Flow Impacts: Combined

Endangered?

50% Walk & Ride ~500 patrons/day 50% Walk & Ride ~500 patrons/day 43/150 Solid Top 30%

Preferred Dinky Terminus

Kiss& Ride FreeB, taxi ~ ~7 On-street: ~100 Small lot: ~62 Commute Lot : ~150 Total: ~340 Yield: ~375 Boarders/day; ~680 McCarter Patrons On-street: ~100 Small lot: ~62 Commute Lot : ~150 Total: ~340 Yield: ~375 Boarders/day; ~680 McCarter Patrons 62 Baker surface lot 62 Baker surface lot ~150 (Commuter Lot) ~150 (Commuter Lot) 178 (Each Floor of Lot 7) 178 (Each Floor of Lot 7) Existing Dinky Parking Dinky / McCarter Parking

East-West Pedestrian Flow

At-grade Xings ??? At-grade Xings ???

East-West Pedestrian and Vehicular Flow

Thank You