Circulation Solutions for Alexander-University Congestion Alain L. Kornhauser 24 Montadale Circle Princeton Township
2
View in “Slide Show” mode There are a substantial number of important animations
4
z 100% 30% 70% Road Flow North-Bound Alexander Road Flow North-Bound Alexander
5
100% 50% Road Flow South-Bound Alexander Road Flow South-Bound Alexander
6
Congestion @ Alexander & University Place
7
Solution: One – Way Flow Solution: One – Way Flow
8
Flow Pattern @ Alexander & University Pl.
9
Minimal Conflicts; Readily Accommodates Pedestrians Minimal Conflicts; Readily Accommodates Pedestrians
10
Before - After Traffic Flow Impacts: NB Alexander – RT University (Largest Flow) Before - After Traffic Flow Impacts: NB Alexander – RT University (Largest Flow) Before 70% 100% No Change! 100% 70% After
11
Before - After Traffic Flow Impacts: NB Alexander – RT Mercer (Largest Flow) Before - After Traffic Flow Impacts: NB Alexander – RT Mercer (Largest Flow) 100% 15% Before 15% After Incr. NB Univ Decr. NB Alex. & Mercer 100% Before - After Traffic Flow Impacts: NB Alexander – RT Mercer Before - After Traffic Flow Impacts: NB Alexander – RT Mercer
12
Before - After Traffic Flow Impacts: NB Alexander – RT Mercer (Largest Flow) Before - After Traffic Flow Impacts: NB Alexander – RT Mercer (Largest Flow) 100% ~ 10% Before 7.5% After Incr.: NB Univ &WB College & Mercer Decr.: NB Alex. Decr.: NB Alex. 100% 15% ~ 5% 7.5% 2.5% Before - After Traffic Flow Impacts: NB Alexander – LT College or Mercer Before - After Traffic Flow Impacts: NB Alexander – LT College or Mercer
13
Incr.: SB Alex. &WB College Decr.: SB Univ. Decr.: SB Univ. Before - After Traffic Flow Impacts: SB University Before - After Traffic Flow Impacts: SB University 50% 100% Before 50% After 100%
14
Before - After Traffic Flow Impacts: SB Alexander Before - After Traffic Flow Impacts: SB Alexander No Change! 50% 100% Before 50% After 100%
15
Before - After Traffic Flow Impacts: Combined Before - After Traffic Flow Impacts: Combined
16
Conclusions One-Ways are trivial to implement and are readily reversible – A few one-way signs, some paint, reprogramming of the traffic light at Alex&Univ to activate only for pedestrian Xing requests. Eliminates all turning movement conflicts at Alex&Univ Substantially reduces Wawa Access conflicts & improves access to Dinky Kiss&Ride Only slightly alters existing travel patterns Decreases traffic flow along upper Alexander (Mercer Hill) Better utilizes College Rd by having it absorb some increased traffic; (increased from essentially zero) Adds only few left turning movements from Univ to College Rd. Adds a little more traffic on upper Univ which can be readily handled by the light at Univ&Nassau
17
Thank You
19
Endangered?
20
50% Walk & Ride ~500 patrons/day 50% Walk & Ride ~500 patrons/day 43/150 Solid Top 30%
21
Preferred Dinky Terminus
22
Kiss& Ride FreeB, taxi ~10 62 32 25 26 ~7 On-street: ~100 Small lot: ~62 Commute Lot : ~150 Total: ~340 Yield: ~375 Boarders/day; ~680 McCarter Patrons On-street: ~100 Small lot: ~62 Commute Lot : ~150 Total: ~340 Yield: ~375 Boarders/day; ~680 McCarter Patrons 62 Baker surface lot 62 Baker surface lot ~150 (Commuter Lot) ~150 (Commuter Lot) 178 (Each Floor of Lot 7) 178 (Each Floor of Lot 7) Existing Dinky Parking Dinky / McCarter Parking
23
East-West Pedestrian Flow
24
At-grade Xings ??? At-grade Xings ???
25
East-West Pedestrian and Vehicular Flow