AAE450 Spring 2009 Week 4 Project Timeline [Solomon Westerman] [PM]

Slides:



Advertisements
Similar presentations
AAE450 Spring 2009 Reliability Analysis Solomon Westerman, PM Week 5, 2/12/09 [Solomon Westerman] [PM] 1.
Advertisements

SPIN
AAE450 Spring 2009 Propellant Choice and Mass Estimates for the Translunar OTV Week 2 Presentation Thursday, Jan 22, 2009 Brad Appel Propulsion Group.
AAE450 Spring 2009 Final Presentation Draft Slides Description: Some draft slides and ideas 3/26/09 Kris Ezra Attitude 1.
AAE450 Spring 2009 Time to Complete 50m/s ΔV & 100g Payload System Overview Brittany Waletzko 100g Payload Integration Manager Translunar/OTV Phase Week.
AAE450 Spring 2009 Hopper Trajectory February 26, 2009 [Alex Whiteman] [Mission Ops] [Lunar Descent] Page 1.
AAE450 Spring 2009 Arbitrary Payload Cost Optimization to LLO Tasks: Payload Cost / Mass Optimization (Launch to LLO) Disprove Momentum Transfer Alternative.
AAE450 Spring 2009 Slide 1 of 8 Orbital Transfer Vehicle (OTV) Masses and Costs Ian Meginnis March 12, 2009 Group Leader - Power Systems Phase Leader -
AAE450 Spring 2009 Kelly Leffel 3/26/09 Structures and Thermal Lunar Descent Phase Lander Integration Lander Thermal Control (Day) Kelly Leffel Structures.
AAE450 Spring 2009 Lander Phase: Hybrid Propulsion System Propulsion System Sizing and Inert Mass Analysis Hopper and Rover Designs for 10kg Payload Hopper.
AAE450 Spring 2009 Week 9 [Solomon Westerman] [PM] Design Freeze on Thursday night!
AAE450 Spring 2009 Analysis of Trans-Lunar Spiral Trajectory [Levi Brown] [Mission Ops] February 12,
AAE450 Spring Attitude Control – Arbitrary Payload Christine Troy Assistant Project Manager Webmaster Lunar Descent Attitude Control Analysis Design.
AAE450 Spring Spinning Descent and Compressed Gas Hopper Christine Troy Assistant Project Manager Webmaster Lunar Descent Attitude Control Analysis.
AAE450 Spring 2009 Final Sizing and Trajectory Design for 100 g/10kg Payloads [Levi Brown] [Mission Ops] March 12,
AAE450 Spring 2009 Week 4 Presentations [Solomon Westerman][PM]
AAE450 Spring 2009 Tony Cofer Power Group TLI Phase 03/05/09 Power Limitations for Arbitrary Payload Tony Cofer] [Power] page 1.
AAE450 Spring 2009 OTV 3-D GEOMETRY & INTEGRATION Korey LeMond STRC/THM/INTEG GL, OTV Phase [Korey LeMond] [STRC/THM/INTEG/CAD GL, OTV Phase] 1.
AAE450 Spring 2009 Lunar Descent Final Numbers Josh Lukasak Attitude Group Lead Lunar Decent Phase Lead 03/12/09 [Josh Lukasak] [Attitude] (1)
AAE450 Spring 2009 Translunar Orbit Transfer Vehicle (OTV): Propulsion System Setup for 100g & 10 kg Case Launch Vehicle Selection for Arbitrary Case Thermal.
AAE450 Spring 2009 Descent Trajectory Hover Trajectory LD Code Integration John Aitchison March 5 th, 2009 [John Aitchison] [Mission Ops]
AAE450 Spring 2009 Week 6 [Solomon Westerman] [PM] PDR Complete! Check the website if you have any mission requirement questions!
AAE450 Spring Gram Mission Integration and Model Korey LeMond STRC/THM/INTEG GL [Korey LeMond] [STRC/THM/INTEG/CAD GL, OTV Phase] 1.
AAE450 Spring 2009 Cost Analysis, Redux Solomon Westerman Week9: 3/12/09 [Solomon Westerman][PM]Page 1/3.
AAE450 Spring 2009 Mass Savings and Finite Element Analysis (FEA) Preparation for Orbital Transfer Vehicle (OTV) 100 gram Case Tim Rebold STRC [Tim Rebold]
AAE450 Spring 2009 Lunar Lander Preliminary propulsion system selection and design analysis Thursday, January 22, 2009 Thaddaeus Halsmer, Propulsion.
AAE450 Spring 2009 Translunar OTV (Orbital Transfer Vehicle) : Chemical Propulsion System Refined estimates: OTV WET Mass, Propellant Volume & Propellant.
AAE450 Spring 2009 Lunar Capture Altitude Mass to LLO for Arbitrary Time to Rotate Lander During Descent Camera/Dust Removal [Kara Akgulian] [Mission Ops]
AAE450 Spring 2009 Hopper Design Alternative Josh Lukasak Attitude Group Lead Lunar Decent Phase Lead 02/26/09 [Josh Lukasak] [Attitude] (1)
AAE450 Spring 2009 Brian Erson Attitude Control Systems Trans Lunar Phase Thruster Analysis [Brian Erson] [Attitude] 1.
AAE450 Spring 2009 Presentation Notes 1.Good Q&A Becoming ‘experts’ on your system! 2.Give background information / assumptions [Solomon Westerman] [PM]
AAE450 Spring Lunar Descent Attitude Control Analysis Christine Troy Assistant Project Manager Webmaster Lunar Descent Attitude Control Analysis.
AAE450 Spring 2009 Launch Vehicle Performance Payload Cannon Zarinah Blockton Mission Ops~Group Earth to LEO~Phase Rover ~Phase February 19, 2009.
AAE450 Spring 2009 Week 8 – Ahhhhhh! Only un-reprinted C&H strip!
AAE450 Spring 2009 Patch Antenna Pivot Michael Christopher -Communications Group -TLI Phase Group 1 OF 5Michael Christopher - COM.
AAE 450 Spring 2008 Allen Guzik January 31, 2008 Trajectory Airplane Launch Trajectory Code and ΔV Drag Comparison Trajectory Optimization 1/5.
A spring with a mass of 6 kg has damping constant 33 and spring constant 234. Find the damping constant that would produce critical damping
AAE450 Spring 2009 OTV 3-D GEOMETRY & INTEGRATION Korey LeMond STRC/THM/INTEG/CAD GL, Locomotion Phase OTV Phase [Korey LeMond] [STRC/THM/INTEG/CAD GL,
AAE450 Spring 2009 Launch Vehicles Zarinah Blockton Mission Operations 1/29/2009 Blockton Ops.
AAE450 Spring 2009 Finite Element Analysis (FEA) for Orbital Transfer Vehicle (OTV) Tim Rebold STRC [Tim Rebold] [STRC] [1]
AAE450 Spring 2009 Support structure for Orbital Transfer Vehicle (OTV) Tim Rebold STRC [Tim Rebold] [STRC] [1]
AAE450 Spring 2009 Slide 1 of 7 Final Presentation Slides Ian Meginnis April 9, 2009 Group Leader - Power Systems Phase Leader - Translunar Injection OTV.
AAE450 Spring 2009 Slide 1 of 8 Final Presentation Back-up Slides Orbital Transfer Vehicle (OTV) Power and Thermal Control Ian Meginnis Ian Meginnis Power.
AAE450 Spring 2009 Low Thrust Spiral Transfer Maneuvers and Analysis [Andrew Damon] [Mission Ops] February 5,
AAE450 Spring 2009 Lunar Lander Main Engine Thaddaeus Halsmer Thursday, February 12, 2009 Thaddaeus Halsmer, Propulsion.
AAE450 Spring 2009 Final Slides Lunar Lander Structure April 9, 2009 Lunar Descent Phase Group [Ryan Nelson] [STRC] 1.
AAE450 Spring 2009 Brian Erson Attitude Control Systems Trans Lunar Phase Alternative Design Comparison [Brian Erson] [Attitude] 1.
AAE450 Spring 2009 Thermal Transport Subsystems Toy Ball System,100g Payload John Dixon COM GL, Loco PL [John Dixon] [COM GL] 1.
Final Slides By: Kara Akgulian Mission Ops Locomotion Phase 1.
AAE450 Spring 2009 Final Lander Volume and Mass 10kg, 100g, Arbitrary March 12, 2009 Lunar Descent Phase Group [Ryan Nelson] [STRC] 1.
AAE450 Spring 2009 Launch Vehicle Selection Zarinah Blockton Mission Ops~Group Earth to LEO~Phase March 5, 2009.
AAE 450 Spring 2008 Elizabeth Harkness Trajectory Design Group Contact Preliminary Trajectory Model: Vertical Launch.
AAE 450 Spring 2010 AAE 450 2/11/2010 Kathy Brumbaugh Chris Spreen
AAE 450 Spring 2010 AAE 450 3/11/2010 Kathy Brumbaugh Chris Spreen
AAE450 Spring 2009 Lander Sizing and Launch Vibrations Feb. 12, 2009 Earth Launch/Lunar Descent Phase Group 1 [Ryan Nelson] [STRC]
AAE 450 3/30/2010 Kathy Brumbaugh Chris Spreen AAE 450 Spring 2010.
Week 6 Presentation Thursday, Feb 19, 2009
Attitude, Lunar Transfer Phase
Architecture Selection Logic
Lunar Descent Slide Suggestions & Questions
Lunar Descent Trajectory
Solomon Westerman, PM “Polished” Final Slide Layout Week 13.
Final Presentation Slides
[Solomon Westerman] [PM]
[Solomon Westerman] [PM]
Solomon Westerman Week3 1/29/09
[Solomon Westerman] [PM]
Launch Vehicle Selection Spring Cannon Launch Vehicle Alternatives
Final Slides Attitude Control System (ACS) – Lunar Transfer
Sarah Shoemaker 3/20/2008 Structures, Gondola Design, Tanks, CAD Final Slides AAE 450 Spring 2008 Structures.
Presentation transcript:

AAE450 Spring 2009 Week 4 Project Timeline [Solomon Westerman] [PM]

AAE450 Spring 2009 Website Updates  MDR Posted  Folder for Mass/Volume/Power budgets –Managed by STRC/THM –Make sure to get component parameters to your GL by Wed. evening so this budget can be in presentation [Solomon Westerman] [PM]

AAE450 Spring 2009 Today  List major design characteristics –Hard/Soft landing (Trajectory) –Locomotion type –Spin stabilization (OTV and/or Lander) –TLI trajectory type –Payload to lunar surface  Discuss arbitrary mass payload –Scalability –Work forward from launch vehicle

AAE450 Spring 2009 Design (Week)X0 (2)X1 (3,4)X2 (4)X3 (4)X4 (4) Main PurposeInitial designRefined GLXP design Scalability analysis Effect of firm landing Effect of spin stabilization LandingSoft (<10g’s) Firm (<100g’s) TBD LocomotionRover TBD TLIHohmann (cryo) Spiral (EP) Stabilization3-axis Spin OTV or lander Mass to Lunar surface ~250 kg~ 150 kg?As large as X1 will allow ~ 150 kg?