Presentation is loading. Please wait.

Presentation is loading. Please wait.

Sarah Shoemaker 3/20/2008 Structures, Gondola Design, Tanks, CAD Final Slides AAE 450 Spring 2008 Structures.

Similar presentations


Presentation on theme: "Sarah Shoemaker 3/20/2008 Structures, Gondola Design, Tanks, CAD Final Slides AAE 450 Spring 2008 Structures."— Presentation transcript:

1 Sarah Shoemaker 3/20/2008 Structures, Gondola Design, Tanks, CAD Final Slides
AAE 450 Spring 2008 Structures

2 Balloon Gondola Sized to fit each launch vehicle 1 kg 200 g 5 kg
AAE 450 Spring 2008 Structures

3 Gondola Dimensions Payload Size Mass (kg) Length (m) Width (m)
Thickness (m) Ring Diameter (m) 200 g 3.346 0.876 0.04 1.3015 1 kg 3.849 1 1.1264 5 kg 338.32 5.133 1.38 1.8386 AAE 450 Spring 2008 Structures

4 Backup Slide - Strength
Strength Calculation σ = F/A (σ, stress; F, force; A, area) F = g*(gond_weight + GLOW) (g, m/s2; gond_weight, mass of gondola without the base; GLOW, gross liftoff weight) A = area of gondola base Max. Strength of Aluminum = 455 MPa Strength of Gondola 200 g: 56,301 Pa 1 kg: 32,704 Pa 5 kg: 75,479 Pa Conclusion: Gondola Will Hold! AAE 450 Spring 2008 Structures

5 Backup Slide – Cost Manufacturing (Thanks to David)
$1,205.30 Same for all payloads Avionics (Thanks to Nicole and Daniel) One battery: $10,000 Sensors: $2,000 Total Gondola Cost: $13,205.30 AAE 450 Spring 2008 Structures

6 Backup Slide - Multi-view 200 g
AAE 450 Spring 2008 Structures

7 Backup Slide - Multi-view 1 kg
AAE 450 Spring 2008 Structures

8 Backup Slide - Multi-view 5 kg
AAE 450 Spring 2008 Structures


Download ppt "Sarah Shoemaker 3/20/2008 Structures, Gondola Design, Tanks, CAD Final Slides AAE 450 Spring 2008 Structures."

Similar presentations


Ads by Google