1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff.

Slides:



Advertisements
Similar presentations
City Council Presentation July 1, 2014 Parks & Recreation Master Plan.
Advertisements

Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown.
BOE Goal: Study long-term facility needs All patrons invited to join Each building and special education co-op represented KIDS Committee met.
2008 Bond Program Implementation | Rock Creek Campus opsis architecture LLP Portland Community College | Rock Creek Campus opsis architecture Portland.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
PINOLE VALLEY HIGH SCHOOL FACILITIES SUBCOMMITTEE MEETING December 13, 2011.
UBC Athletics and Recreation – Facilities overview / Master planning.
Glenbard Township High School District 87 Facility Master Plan Steering Committee July 20, 2011.
Information Open House March 10, – 9 pm.  Tonight we will have several information stations for the public to visit.  Please visit those areas.
RENOVATION & ADDITION OPTIONS TORONTO DISTRICT SCHOOL BOARD NORTH TORONTO COLLEGIATE INSTITUTE REDEVELOPMENT STUDY.
Essex Police Challenge Meeting 12 th March Austerity Policing on a smaller budget will become the new normal.
FBCLS Facilities Master Plan September 14, Future Planning Team Dave Esely Sheryl Franke Bud Hertzog Blake McKinney Wendell Shaffer Sara Taylor.
COUNCIL WORKSESSION DECEMBER 11, AGENDA a.PROJECT SUMMARY RECAP. a.SCOPE. b.BUDGET. b.FINANCING UPDATE. a..5% GENERAL SALES & USE TAX. b.1.5% LODGING,
What is a master plan? Creates the long-term vision for the University’s land and physical resources. Lays foundation for development plan, but is not.
June 29, Discuss preliminary vision for St. Vincent’s Open lines of communication Share information as previously committed Seeking your input in.
St. Ambrose University Main Campus Planned Institutional District Application December 15, 2011.
Alpha Borough Community Recreation Project Preliminary Design Presented by Group 3 February 28, 2002 From left to right: Pamela Vislocky, Erin O’Brien,
FHLBNY © 2015 FEDERAL HOME LOAN BANK OF NEW YORK 101 PARK AVENUE NEW YORK, NY Overview of the Project Construction Form (AHP/APP-109)
EXTREME MAKEOVER OR GENTLE REMODEL Linda Demmers Infopeople 2006.
Town of Carver Review of Proposed Plan for Fire and Police Facilities November 12, 2013 EDWARD J. COLLINS CENTER FOR PUBLIC MANAGEMENT.
POSSIBILITIES. The Iceberg $17 Million Infrastructure Reinvestment Needed Annually The Iceberg $2 Million.
Arizona State University Student Services Projects DOWNTOWN | POLYTECHNIC | TEMPE | WEST MARCH 2012.
Fullerton College Physical Education Project Community Meeting March 11, 2009.
Implementation Update Docklands Community Forum 26 February 2014.
Controls & Data Services
Walkerton Accommodation Review April 24, 2008 The following most recommended scenarios were reviewed by the Accommodation Review Committee.
Fanning Howey Stuck Associates Brailsford & Dunlavey Woods Group RDI Board of Education Work Session July 10, 2014 We promise to put children first!
El Cerrito High School El Cerrito, CA New Construction Project of Distinction WLC Architects, Inc Exhibition of School Planning and Architecture.
Planning & Community Development Department Hillsides Residential Care and Educational Center Master Plan City Council July 20, 2015.
Budget Scenarios.  Your district has recognized a need in the community for an additional Landowner Workshop/AG BMP Tour that cannot go unanswered. The.
Timeline History NOV 2007 Community process began MAY 2009Draft Recreation and Open Space Element released JUL 2010 Funding for the environmental review.
“What is happening to my College?” Questions, thoughts and reflections on the developments of Queen’s College ~ Answers by Boydy, Heardy and Jesse.
LOS ALAMOS COUNTY JUDICIAL / POLICE – JAIL COMPLEX 60% SUBMITTAL August 8, 2008.
FAMILY LIFE CENTER Building Committee Update November 23, 2014.
École secondaire catholique Jean-Robert-Gauthier - Phase II Ottawa, Ontario, Canada New Construction Project of Distinction Edward J. Cuhaci and Associates.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
Advanced Technology Center Blue Ridge Community College New Construction Project of Distinction Moseley Architects 2012 Exhibition of School Planning and.
Casey Middle School Boulder, Colorado Middle School, Unbuilt Category RB+B Architects, Inc Exhibition of School Planning and Architecture.
Presented by: Servus Place – A Plan for the Future Report on Public Consultation and Revised Plans Diane Enger Director Servus Credit Union Place March.
CITY COUNCIL WORKSHOP DECEMBER 14, Sec Review requirements. (a) The City Manager shall each fiscal year prepare a preliminary capital improvement.
COUNCIL ON ACCREDITATION/DoD FITNESS CENTER STANDARDS DEVELOPMENT.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
Guelph Soccer Centennial Community Athletics Centre Excitement is Building.
Simplifying the Budget Process
Presentation to Board June 17, 2008 Presented by: J. A. Sabo, Associate Director – Leading Services & Treasurer of the Board BUDGET York Catholic.
Parks & Recreation Suburban/Rural Urban. Parks and Recreation Avoid Decentralized Facilities Tennis Centers/Hubs –Economical Programming –Maintenance.
Joint Agreement for Use of Washington Middle School Gymnasium.
Aquatic Facility Concept Design. “Every Dog has its Day” Park Valley Pool Pool is 28 years old and nearing the 4-9 years of identified life expectancy.
Department of Public Works Recommended Residential Impact Fee Distribution Methodology Change October 26, 2015.
Planning Commission Study Session: Preferred Plan July 23, 2015.
1 Introduction Overview This annotated PowerPoint is designed to help communicate about your instructional priorities. Note: The facts and data here are.
Taylor Family YMCA......let’s take a look back and forward!
Consortia and Public-Private Partnerships: Informing the GENI Transition Ilya Baldin RENCI Director for Network Research.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
Chapter 5 Planning. Importance of Planning It could be said that nothing is more important in the development of a recreation facility than the planning.
CITY OF PORT ARTHUR, TEXAS BUDGET WORKSHOP July 12, 2005.
June 23 rd, 2012 Presentation to the Cavendish Community Ratepayers Association Inc.
Planning and Zoning Division Jefferson County RZ Sevens Residential Memory Care ODP Case Manager: Russell D Clark.
Title slide. Planning Process Where are we now? Where do we want to be? How do we get there? Action plan Park and Facility Inventory and Analysis Recommendations,
Harpenden Parents Group Public Meeting 22nd Feb
Student Services Projects
Lane Center for Academic Health Sciences – Now Open
Proposed 2016 Wilmington Parks Bond Referendum
Robinson Park Recreation Center Renovation
Facilities and Sustainability Committee
Draft Indoor Recreation Facilities Master Plan
PROPOSED FACILITIES REFERENDUM
Space Removal Initiative
Dixon Middle School Project Update
Presentation transcript:

1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff Recommendation 8.Where Do We Go From Here OVER VIEW

QUALITY -QUALITY, ROBUST, ACCESSIBLE FACILITY THAT MEETS THE SPACE AND PROGRAM NEEDS OF USERS NOW AND IN THE FUTURE. POSITIVE EXPERIENCES OF USERS AND GENERATES REVENUE. SCHEDULE -MEET A TIMELINE IMPOSED BY FUNDING PROGRAM. WHAT ARE THE OVERALL OBJECTIVES?

BUDGET -GET AS MUCH AS WE CAN IN THE BUILDING WITHIN A REASONABLE AND AFFORDABLE COST SUSTAINABILITY -MAKE SENSIBLE CHOICES ON EQUIPMENT, DESIGN AND BUILDING ENVELOPE TO REDUCE LONG TERM COSTS/CONSIDER THE ENVIRONMENT. WHAT ARE THE OVERALL OBJECTIVES?

-KEY POINT WHERE THE DESIGN ELEMENTS ARE BEING FIXED -FOOTING DETAILS ARE MORE SIGNIFICANTLY ADVANCED BECAUSE OF ACCELERATED SCHEDULE AND WILL DEFINE FOOTPRINT. -FIRST COST ESTIMATE PREPARED. CLASS “D” TO “TEST” THE DESIGN. -KEY DECISIONS MADE NOW, THEN ADVANCE TO MORE DETAILED, TENDER READY DOCUMENT. WHERE ARE WE NOW?

-FURTHER DESIGN DEVELOPMENT ON ALL BUILDING DETAILS. REFINING DESIGN. -FURTHER CLASS “C”, “B” AND “A” COST. -WORK WITH THE STEERING COMMITTEE. -ISSUE GENERAL TENDER FOR BALANCE OF WORK. WHAT FOLLOWS?

- UNDERSTAND THE DIFFERENCE BETWEEN FOOTPRINT AND TOTAL SQUARE FOOTAGE -FIELD HOUSE AREA CALCULATION WORK FROM 2008 IS “LIGHT. -TO ACCOMMODATE GOOD PLAY AND ALL SURFACES, FULL SIZED INDOOR FIELD, IT IS FELT THAT EXTRA SPACE IS NEEDED. THIS IS MOST OF THE FOOTPRINT GROWTH. “GROWTH” OF FACILITY

- THERE ARE INTERIOR SPACES THAT HAVE INCREASED IN SIZE. MOST OFTEN ON SECOND LEVEL AREAS (ASSOCIATION OFFICES, MEZZANINE, FIELD VIEWING SPACES OR SECOND FLOOR), BUT ALSO IN CIRCULATION AND LOBBY SPACE. THIS IS THE GROSS SQUARE FOOTAGE INCREASE VS FOOTPRINT INCREASE. “GROWTH” OF FACILITY

- ORIGINAL PROGRAM (2008) - TECHNICAL COMMITTEE WORK - STEERING COMMITTEE WORK - INFORMAL INPUT - PUBLIC INPUT WORKSHOP - STEERING COMMITTEE TOUR OF SIMILAR FACILITIES GOOD – BAD – EXPERIENCES OF OTHERS - TRYING TO GET AS MUCH BUILDING AS WE CAN AND ADDRESS ALL OBJECTIVES -BUILDING PROGRAM VS BUDGET WHAT IS INFLUENCING DESIGN

ALL (INCLUDING USERS) - BRIGHT AND AIRY -LIKE KEY FEATURES OF INVISTA CENTRE -ROBUST, QUALITY, SPACE, ACCESSIBLE -COST EFFECTIVE TO OPERATE -SERVE AS A UNIFIED RECREATIONAL COMPLEX WHAT THE COMMITTEE HEARD FROM USERS

USERS -ENSURE BIG ENOUGH LOBBY AND CIRCULATION AREA -SPACES TO SET UP REGISTRATION/ CONVENOR AREA, ETC. -STORAGE, STORAGE, STORAGE -DRESSING ROOM BIG ENOUGH (INVISTA TOO SMALL) AND SHAPED RIGHT. -OFFICES FOR ASSOCIATIONS, GIVEN IT IS THE COMMUNITY FACILITY AND HOME TO MINOR SPORTS ASSOCIATIONS -VIEWING FOR SOCCER (SECOND FLOOR) -SOCCER DRESSING ROOMS NOT TO ACCESS FIELD DIRECTLY WHAT THE COMMITTEE HEARD FROM USERS (cont’d)

ADJUSTED CLASS D BUDGET ESTIMAGE $28,751,000 AVAILABLE CONSTRUCTION BUDGET $25,369,000 (CITY’S BUDGET) COST ESTIMATES

1- REDUCE NORTH PARKING $80, REDUCE WEST PARKING $110,000 3-REDUCE BACK OF HOUSE $120,000 4-ELIMINATE MULTIPURPOSE/OFFICE RM $380,000 5-REDUCE SOCCER WALKING TRACK $200, REDUCE SIZE OF RINK 1 $280,000* 7-REDUCE THE TENNIS COURT SIZE $100,000 8-DEFERMENT OF UPPER FLOOR LOUNGE AT PADS 1 AND 2- $400,000* Options:

North Parking Lot Reduction #1

West Parking Lot Reduction #2

Axonometric Plan Area Reduction #3

First Floor Plan Area Reduction #3

Axonometric Plan Area Reduction #4

First Floor Plan Area Reduction #4

Axonometric Plan Area Reduction #5

First Floor Plan Area Reduction #5

Axonometric Plan Area Reduction #6

First Floor Plan Area Reduction #6a

Second Floor Plan Area Reduction #6a

Building Sections Area Reduction #6a

First Floor Plan Area Reduction #6b

Second Floor Plan Area Reduction #6b

Building Sections Area Reduction #6b

Axonometric Plan Area Reduction #7

First Floor Plan Area Reduction #7

Axonometric Plan Area Reduction #8

First Floor Plan Area Reduction #8

1- REDUCE NORTH PARKING $80, REDUCE WEST PARKING $110,000 3-REDUCE BACK OF HOUSE $120,000 4-ELIMINATE MULTIPURPOSE/OFFICE RM $380,000 5-REDUCE SOCCER WALKING TRACK $200, REDUCE SIZE OF RINK 1 $280,000* 7-REDUCE THE TENNIS COURT SIZE $100,000 8-DEFERMENT OF UPPER FLOOR LOUNGE AT PADS 1 AND 2- $400,000* Options 1-7 Total= $1,270,000

FROM THE REPORT - CONSIDER REMOVAL OF OPTIONS STEERING COMMITTEE RECOMMENDS PROCEEDING WITH PROJECT AS DESIGNED STAFF RECOMMENDATION