Purpose: Integration of AGATA detectors in triple modules Acceptation tests of triplets (energy resolution, crosstalk,…) Complementing the scanning table.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

ProCal Calibration Software
Detector Characterisation Group
MICE Target Report Video Conference 15/03/07 Chris Booth Sheffield 15 th March 2007.
NSF Baseline Review February 10-12, 2004 Optical Module Production Phil Robl Physical Sciences Laboratory.
Begoña Quintana Arnés PTU Alvaro Hernández Prieto PhD Electronic Physicist María Doncel Monasterio PhD.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
I.Kojouharov, GSI Motivation: to integrate all the “life supporting” features of AGATA/AGATA Demonstrator Infrastructure in one entity. Advantages: - Grounding.
AGATA Introduction John Simpson Nuclear Physics Group.
AGATA detector characterization: scanning setup at Orsay Concept of the Orsay scanning system (last Agata week – K. Hauschild) Status and plans A. Lopez-Martens.
February 9, 2002 Muon Collaboration Technical Board Michael Iarocci E951 Cryogenics1 Cryogenic Cooling System for the E951 Pulsed Solenoid Magnet Basic.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
LIGO-G D partial ADVANCED LIGO1 Development Plan R&D including Design through Final Design Review »for all long lead or high risk subsystems »LIGO.
1. Commissioning of cryogenic crates using Mobile Test Bench 1. The Mobile Test Bench 2. Cryogenics crates and equipment – types of transducers and actuators.
WP1: Detector Assembly Liverpool Tasks:  Detector specification measurement Assembly of components in progress  Detector assembly for scanning Work in.
Characterisation & PSA Team Meeting Presentations –Liverpool Status, Andy Boston/Matt Dimmock (Liverpool) –Crosstalk properties of AGATA detectors, Bart.
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Detectors and Preamplifiers Detector deliveries Customer Acceptance Tests Available detectors AGATA triple detectors Scanning program P. Reiter IKP University.
Group Electronique Csnsm AGATA SLOW CONTROL MEETING 19th fev AGATA PROJECT PREPROCESSING MEZZANINE SLOW CONTROL GUI FOR THE SEGMENT AND THE CORE.
Wolfram KORTEN, JRA-02 AGATA Irfu AGATA week, Orsay (France), January 15-18, 2007 AGATA within EURONS Objectives: Development, construction, commissioning.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status Sam Burke UCSB HEP Group.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
Ideas about Tests and Sequencing C.N.P.Gee Rutherford Appleton Laboratory 3rd March 2001.
Ge Test-stands at MPI Munich Xiang Liu 1.General 2.Crystals, Test-stands & Results 3.Outlook.
DATA PROCESSING Working Group Digitisation P. Medina Pre-processing hardware I. Lazarus Pre-processing algorithms W. Gast Global Trigger and SynchronisationM.
GTPE 04/06/15 L. Scibile 04/06/ EDMS:
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Contract for the EURONS project has been signed (~14 M€) Project started on
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
Goals of Upper Division Laboratory Experiences Experimentation –design and conduct experiments –analyze data –draw valid conclusions from data –identify.
Early Career Internal Review Measurement of Double DVCS using SuperBigBite Spectrometer Nuclear Physics Alexandre Camsonne.
Detector Module Three 36-fold segmented detectors 111 preamplifiers Cryostat Jürgen Eberth University of Cologne Detector Team: Dirk Weißhaar Preampl.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
What has been done Campaigns of insertion: 2 in Legnaro, 1 in GSI but few are not yet in the DataBase =>300 objects referenced and assembled but few are.
AGATA Detector Meeting March 16th, 2006, Cologne Detector Acceptance Tests: delivered: three symmetric detectors S001 properties excellent S002 properties.
E.Sbrissa EP/TA3 - IC ATLAS EDR_MAG Magnet Project Fault analysis, QA & Failure rate.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
AT-ECR/C.FabreMay 31, 2007 Cryogenics for Liquid Argon Calorimeters Caroline Fabre on behalf of the ATLAS Liquid Argon Cryogenics Collaboration.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
Mitglied der Helmholtz-Gemeinschaft Status of day-one experiment commissioning at COSY Huagen Xu Goa, Mar
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Advanced Gamma Tracking Array Andy Boston The Advanced Gamma Tracking Array
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
V. Raginel, D. Kleiven, D. Wollmann CERN TE-MPE 2HiRadMat Technical Board - 30 March 2016.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Installation of the T600 at Fermilab
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
HL-LHC IT STRING and Series test of SC link
Instrumentation for Accelerators Technologies for the HL-LHC
PLC-based control systems at SOLEIL - ICALEPCS 2017
Detectors and Preamplifiers
T1 Electronic status Conclusions Electronics Cards:
AGATA Detector Work Performed at Saclay in lessons learned -
CAT of AGATA detectors &
ESS RF Development at Uppsala University
Accelerator Module Test Facility
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Question & Suggestions March 17th
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
J. Emery, B. Dehning, E. Effinger, G. Ferioli, C
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
Testing and deployment
Atefeh Sadeghzadeh Control engineer – Target safety and control
Presentation transcript:

Purpose: Integration of AGATA detectors in triple modules Acceptation tests of triplets (energy resolution, crosstalk,…) Complementing the scanning table in Orsay Further possibilities Validation of Ge crystals from Eurysis (construction phase beyond demonstrator) Validation of R&D on cryogenics on reference detectors … Planning: Construction of the test bench started : cryogenics, slow control, digital electronics, safety… First tests with a reference AGATA detector in summer 2006 Commissioning of the installation with analogue and digital electronics in the fall 2006 Training of local technician and engineer Training on Ge crystal test procedure in Köln First triplet integration possible from late 2006/early 2007 Test Bench for AGATA at CEA Saclay

Overview of the new laboratory : 4 m 7 m 3 m AGATA detector LN2 Test Bench for AGATA at CEA Saclay

Technical resources: Dedicated laboratory (expendable) 10 TNT cards (operational sept. 2006) Signal conversion boxes (CSNSM Orsay), video cables, PC NIM crate with analogue signal processing LN2 supply and automatic filling procedure of detectors Slow control (temperature interlock, automate…) Pumping system Radioactive sources Test Bench for AGATA at CEA Saclay Personnel : scientific coordinator: Andreas Görgen project coordinator: Julien Pancin post-doc: Joa Ljungvall 1 technician at 100 % on the detectors (assembly and tests) 1 technician at 20 % on slow control 1 engineer at 50 % for management, checking of test procedures…