Presentation is loading. Please wait.

Presentation is loading. Please wait.

AGATA detector characterization: scanning setup at Orsay Concept of the Orsay scanning system (last Agata week – K. Hauschild) Status and plans A. Lopez-Martens.

Similar presentations


Presentation on theme: "AGATA detector characterization: scanning setup at Orsay Concept of the Orsay scanning system (last Agata week – K. Hauschild) Status and plans A. Lopez-Martens."— Presentation transcript:

1 AGATA detector characterization: scanning setup at Orsay Concept of the Orsay scanning system (last Agata week – K. Hauschild) Status and plans A. Lopez-Martens & A Korichi for the Orsay (IPN-CSNSM) Group

2  LN 2 XYZ table Ge segment and anode signals / NaI 500 MBq Digital [TNT]/Analogue electronics Industrial PC Scanning PC Linux [NARVAL] + SDLT + 1.3 TB NAS NaI Linux Experimental hall at the CSNSM EM shielded and air conditionned Area & EMC control

3 Concept : xyz Table + TOHR (Orsay) Digital electronics Focal point 2r Fe dd’ Positionning rods Tungten sheet Brace 40 triangular–shaped 200  m thick W-plates Plate separation : 200  m 200  m diameter holes on a hexagonal lattice Agata detector :  movment Xy movment Tohr : z movment Coincidences : 6 NaI detectors Intense Source : 15 mCi Volume /scan point : 2 x 2 x 2- 3 mm3 : 3D Scan of the whole detector From simulations, the number of single interaction Compton scatter events at a given position : 400/h @front face and 10/h @the back of the detector

4 Collimated 137 Cs delivered : 477 MBq -> 2 kHz After a heavy safety procedure (A. Lopez-Martens) we are allowed to use the source Security trolley Security lock down More security

5 G4 simulations have shown that TOHR collimator are too thin (K. Hauschild) Double up the thikness Recalibration of each TOHR module (focal point) Done (J. Robin & F. Le Blanc)

6  Mechanics ready (P. Pariset)  A conventional XY table, the motorised rotational plate to turn the AGATA detector and the stepping motor for the z-translation of TOHR : delivered  Programming Software for the different movements : done (E. Legay, N. Dosme and X. Grave)

7 VME interface ACQ-CAMC __________________ CAMAC Analogique ___________________ TNT2 + trigger ___________________ HT et BT détecteur ___________________ ATCA AGATA The analog electronics: 3x(16 channels) CADC cards developped and tested VME interface ACQ- CAMAC : under way (D. Linget, E. Legay, S. Leboutelier, X. Grave) Electronics housing : Spécial temperature Controlled rack

8 AP1 Infrastructure : ready Analogue electronics (48ch) and DAQ (Narval) ready Digital electronics : 10 TNT2 cards (Gabriela) are under tests at Strasbourg Commmissioning of the set-up with a real Agata detector Possible from April 2006 Orsay set-up : Ready to scan summer 2006 Summary

9 VME interface ACQ-CAMC __________________ CAMAC Analogique ___________________ TNT2 + trigger ___________________ HT et BT détecteur ___________________ ATCA AGATA (plus tard) PC-Linux ACQ __________________ PC table xy, Commande moteur __________________ LN2-Auto _

10 Status : future prospects Manque ACQ et é lectronique analogique TNT2 cards under tests at ires Ready in few weeks Commmissioning of the set-up with a real agata detector April 2006 Ready to scan summer 2006 Liste des gens

11 Collimated 137 Cs source ‘security’ trolley ‘ security’ lock down more ‘security’

12


Download ppt "AGATA detector characterization: scanning setup at Orsay Concept of the Orsay scanning system (last Agata week – K. Hauschild) Status and plans A. Lopez-Martens."

Similar presentations


Ads by Google