Furnaces and Wet bench area Savitha P. Wet bench July and August month was very busy CeNSE usage includes lab course, INUP hands-on electroplating slots.

Slides:



Advertisements
Similar presentations
Furnaces and Wet benches Savitha P. Weekly trend chart – Dry ox (5nm) Conditions: 1000 deg C – 1 min, 6 slpm oxygen flow, 20 min anneal oxide thickness.
Advertisements

HVAC523 Heat Sources.
FABRICATION PROCESSES
HEAT PUMPS.
I have seen this happen !. You have exceeded your storage allocation.
Michael Hoch / EP-AIT1 TPC Resistor Rod. Michael Hoch / EP-AIT2 Resistor Chain: Design Constrains  current per resistor chain: 241  A = 25W (total =
Summery of Cooling System Teflon Leaks* *This is independent of the internal problems Rob Pisani.
Group Meeting #1 January 29 th, 2013 Michael Bentel Jeremy David Erik Peterson Arpit Shah 1.
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
NSS Requirements Review: Utilities Michelle Everett Lab Coordinator Scientific Activities Division November 12, 2014.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
BINP level meter for cold liquids The method of measurements: change of the capacitance as function of a level of a liquid Originally designed for LN 2.
Thermal Analysis of short bake out jacket version 1 12-Nov-2013.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy July 1, 2014 Cleanroom administrative committee.
Micro Electronics Processing Lab Wet and Dry Oxide Growth Team 1B Sudipta Bera Matthew Berg Cooper Swenson Glenda Anderson Dana Olson.
Carol A. Wood Contract Specialist July 8,  Laboratory equipment, including new, refurbished, upgrades  Services related to laboratory equipment.
Sea Water Scrubber. INTRODUCTION Crystallox has developed a new generation of horizontal and vertical scrubbers for marine and land based applications.
TURBINE & COOLING SYSTEM Presented By – AVIJEET PRATAP 07ME12 IET AGRA
Gas Liquid Chromatography
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
Furnaces and wet benches Savitha P. Annealsys new RTP: facilities hook up over, waiting for gases hook up, what about the pump? K-space Ultra scan:
Furnaces and wet benches Savitha P. Metal annealing furnace – No “gold contaminated substrates” Different tubes will be provided for people worried.
Furnaces and wet benches Savitha P. TEOS installed – problems stabilizing temperature and pressure Solved with First Nano’s help – Under optimization.
They also develop power- using machines such as refrigeration and air- conditioning equipment, machine tools, material handling systems, elevators and.
Peak Scientific Instruments Ltd
1 Alan Bross MUTAC April 9, 2008 Lithium Hydride Absorber Program A. Bross for C. M. Lei.
Furnaces and wet benches Savitha P. Entry submitted for KLA Tencor contest: “Very informative and precise entry”, as per KLA – Thank you Prof. Akshay.
Cryo-Tracker Level, Temperature, and Mass Gauging Fluid Sensors
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India Arun Kumar Menon Oct 7, 2014 Cleanroom Admin Committee Meeting.
The Integrated Circuit Brad Jones AC Computer Science Mrs. Schulz August 2003.
Fabrication of Active Matrix (STEM) Detectors
ME 414 : Project 1 Heating System for NASA North Pole Project Team Members Alan Benedict Jeffrey Jones Laura O’Hair Aaron Randall May 5, 2006.
Iván Fernández CIEMAT 2 nd EU-US DCLL Workshop, University of California, Los Angeles, Nov th, 2014.
Furnaces and wet benches - update Savitha P. Current status of old equipments One bench could work: Exhaust problem need to be solved Wet oxidation and.
An- Najah National University Graduation Project (2) Prepared by: Alaa Nazzal Qais Obaid Suhaib Qaddoha Ahmad Hakam Motaseam Qotmosh HHO CELL: Design,
Manufacturing Process
Sl.NoItemOwnerStatus 1a. To get the cost estimate of having a centralized compressor for all the labs at CeNSE. b. Estimate the cost of running a new pipeline.
Furnaces and Wet bench area Savitha P. Wet bench - Movement CMOS wet bench moving to the new clean room Purchase orders for chemicals still not released.
Vacuum Fundamentals 1 atmosphere = 760 mm Hg = kPa 1 torr = 1 mm Hg vacuum range pressure range low 760 ~ 25 torr medium 25~ high ~ 10.
Principles of correct VRV Installation A. Refrigerant pipe work
IPN Lyon ILD Mechanical structure April 2012 DHCAL Assembly, Tooling, Cooling J.C Ianigro - IPN Lyon -
Cooling System. 1. List the basic parts of a cooling system: -Thermostat -Fan -Water pump -Radiator -Ethelyne glycole -Shroud.
Beam Dump Upgrade Planning Keith Welch 2/5/13. Drivers for Upgrade Historical Problems – Hardware failures Helium system Windows, diffusers Dehumidifiers.
Furnaces and Wet bench area Savitha P. Wet bench Currently has two wet benches – one exclusively for CMOS processes Two hours slots TMAH and KOH etching.
Presenter Name Facility Name Ultra Thin CCD detectors for particle physics experiments.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Lithium Hydride Absorber Program C. M. Lei March 17, 2008.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Neutrino Cryogenics Requirements Meeting 25/09/2014 Day 1 review.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Dual Atmosphere Exposure Apparatus at Montana State University
Price List for Un-pressurized Sets Vacuum TubeTankLoading Quantity (sets)FOB Price US$ SizeQty(pcs)Capacity20 ’ GP40 ’ GP40 ’ HQ 58×1800m m L
Furnaces and Wet bench area Savitha P. Wet bench Mainly Lab course and INUP Need to have purple-nitrile gloves for all processes?
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
© 2012 MITSUBISHI HEAVY INDUSTRIES – MAHAJAK AIR CONDITIONERS CO., LTD. All Rights Reserved. 5 August 2014.
Hao Guo LINAC Department Institute of Modern Physics.
AT-ECR/C.FabreMay 31, 2007 Cryogenics for Liquid Argon Calorimeters Caroline Fabre on behalf of the ATLAS Liquid Argon Cryogenics Collaboration.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
LBNE Target Pile & Decay Pipe Cooling Andy Stefanik and Ang Lee – Fermilab September 25, 2014.
CERN Cryolab CO 2 cooling for pixel detectors Investigation of heat transfer Christopher Franke, Torsten Köttig, Jihao Wu, Friedrich Haug TE-CRG-CI.
SABRE PoP Fluid Handling
HFM Test Station Main Cryostat
Future tube procurement Richard French
Integration issues at IHEP
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
Pixel CO2 Cooling Status
Laboratory: A Typical Wet Etching Process
Sensor Technology group
Presentation transcript:

Furnaces and Wet bench area Savitha P

Wet bench July and August month was very busy CeNSE usage includes lab course, INUP hands-on electroplating slots Need to have purple-nitrile gloves for all processes?

Wet bench - Maintenance Process run sheets for monthly monitoring of – Silicon etches – TMAH & KOH – oxide etching – Electrodeposition

Furnaces The exhaust problem for the Phosphorus diffusion has been solved

Furnace

Issues All furnaces have temperature control problems, especially Boron/wet diffusion – Problem with the temperature control board? – Maintenance engineer expected in Sept

ALD installation Installation engineer expected on 12 th Sept Needed for installation – 8 inch wafers for process (6-7)? – 100mm Silicon wafers for test runs (atleast 10 Nos. for process demonstration) – Process gas N2 purity 5.0 (3-6 Bar) – Instrument gas N2 purity 2.5 (5-6 Bar) – Cooling liquid for Huber-chiller (e.g. glycol, -25 deg C) – For process gases: 6mm Stainless Steel tube or thick wall Teflon tube outer diameter 6mm, inner diameter 3mm with ¼” VCR connection – For instrument gas flexible tube 4-10mm – Precursors e.g. TMA, DEZn, DI-water… – N2 (purity 2.5) for Dry pump min. 20SLM!!! 6mm tube. – Cooling system for dry pump (This should be a separate cooling unit apart from Unichiller shipped along with ALD tool) – Helium leak detector available – In Addition to that all the necessary Electrical inputs, N2 Generator for both instrument and process gas supplies as specified earlier.