Presentation is loading. Please wait.

Presentation is loading. Please wait.

Furnaces and wet benches Savitha P. Annealsys new RTP: facilities hook up over, waiting for gases hook up, what about the pump? K-space Ultra scan:

Similar presentations


Presentation on theme: "Furnaces and wet benches Savitha P. Annealsys new RTP: facilities hook up over, waiting for gases hook up, what about the pump? K-space Ultra scan:"— Presentation transcript:

1 Furnaces and wet benches Savitha P

2

3 Annealsys new RTP: facilities hook up over, waiting for gases hook up, what about the pump? K-space Ultra scan: Basic training over – Rough comparison with Dektak XTA, results similar – Need some software patches to be fixed Need to schedule annual maintenance for the furnace – One week each for LPCVD and atmospheric furnaces – Plan includes dismantling/cleaning of tubes, PCW lines gas injectors and scrubbers Problems with new material entry – Protocol for bringing in substrates other than Si and glass? No information on order status/delivery with MITO076 Furnaces & Wet benches - update

4 Thank you


Download ppt "Furnaces and wet benches Savitha P. Annealsys new RTP: facilities hook up over, waiting for gases hook up, what about the pump? K-space Ultra scan:"

Similar presentations


Ads by Google