Miccosukee Road Resurfacing and Re-striping Public Input Requested On-Street Parking vs Bike Lanes.

Slides:



Advertisements
Similar presentations
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Advertisements

Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Lesson 15 Publication No. FHWA-HRT Bicycle Lanes.
Titusville to Edgewater Bike Loop PD&E Study
Shared Road Markings “Sharrows” For Bicycles Max Starcke Park Connection to the Future TxDOT Hike and Bike Trail.
Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
Ed Cox City of Sacramento, Department of Public Works Bicycle Solutions in Sacramento.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
1 Leon County Board of County Commissioners Killearn Lakes Sidewalk Construction and Traffic Calming Kinhega Drive and Deer Lake Road.
WHCA – April 9, 2014 Timeline for Choosing Priority Projects for NCAC Funding  Fall Presented ‘gaps’ and possible project solutions to WHCA in.
Slide 1. Slide 2 Introduction How did you get to school as a child?
Plan Purpose:  To provide pedestrian environments that are safe, attractive, and accessible to community institutions, employment and retail services.
CRTPA FY FY 2017 Priority Project Lists UPDATE.
1 City of Rapid City and Rapid City Community Planning RAPID CITY BICYCLE AND PEDESTRIAN MASTER PLAN in collaboration with: Kadrmas, Lee and Jackson RDG.
University Bike Master Plan. University Policy  Bicycle committee recommends that the current policy for bicycles on sidewalks be changed to create a.
Bike Routes and Pedestrian Routes. Bike Route Goals Create a safe route through the city Connecting parks, schools, and subdivisions Raise awareness of.
Hillsborough County Walk/Bike Action Safety Plan Hillsborough County MPO Prepared for: Prepared by: Hillsborough County Bicycle/Pedestrian Advisory Committee.
Walking and Biking the Busiest Roads Around Atlanta: a Bike/Ped Plan that establishes non-motorized transportation among regional-scale priorities Regan.
Why do you need a plan for walkers? They can walk anywhere, can’t they?
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Monroe Street Access Management and Lake Ella Implementation Study CRTPA Board Meeting January 23, 2012.
TRANSPORTATION ENHANCEMENTS. OVERVIEW  The CRTPA coordinates the annual submission of priority project lists (PPLs) to the FDOT for annual funding consideration.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
New Visions Bicycle & Pedestrian Action Plan Bicycle and Pedestrian Transportation – Bicycle and pedestrian travel is vital to the region’s public health,
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
Instructions  Check in with Andrew Bomberger at TCRPC to let him know what muni you will be visiting so he can give you any specific info for that muni.
Board of County Commissioners September 25, 2012.
Chicago Department of Transportation Bobby L. Ware, Commissioner Richard M. Daley, Mayor Metropolitan Planning Council November 3,
“Connecting People and Places” REGIONAL MOBILITY PLAN CRTPA Board Meeting May 17, 2010.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
County of Fairfax, Virginia Department of Transportation 1 Requirements for Pedestrian Improvements on Road Projects in the Board’s Six Year Priority Plan.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2010/11 – 2014/15 Presentation to Board of County.
1 Leon County Board of County Commissioners MICCOSUKEE ROAD RESURFACIING INTERMITTENT ROAD CLOSURE From North MERIDIAN STREET To DOCTORS DRIVE.
Outline  Board Direction  Tasks Completed  Recommendation.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
ACHIEVING PHILADELPHIA’S VISION ZERO ACTION PLAN THROUGH INNOVATIVE STREET DESIGN Jackson Wandres, RLA – The RBA Group December 3, 2015.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
Community Development Department Dimensional Variance In Connection with The Agreement to Convey Property – City Initiated Application # Palm.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
I-80 San Pablo Dam Road Interchange Project – Phase 1.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
City of Belmont Comprehensive Bicycle and Pedestrian Plan Parks and Recreation Commission Meeting 11/4/2015.
8 th Ave S 2016 Pedestrian Improvements South Park Neighborhood Association David Allen, Sue Byers, Alisa Arment April 12, 2016.
Transportation Improvement Plan (TIP) Project Solicitation
UGA Bicycle Facilities Study
US 92 Pedestrian Connectivity & Safety Assessment Study
Santa Cruz avenue sidewalks Project
WELCOME State Road 50 (Cheney Highway) Overview and Methodology
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Pilot Project Evaluation
Nolanville Main Street Sidewalk & Bicycle Connectivity
SR 60/Kennedy Boulevard and Jackson Street Resurfacing Projects
US 92 Pedestrian Connectivity & Safety Assessment Study
FY 2011 – FY 2015 Transportation Improvement Program (TIP)
Hillsborough County Initiatives to Address School Safety
Orange Grove Boulevard Complete Streets Project
MPO Board Presentation
Federal-aid Highway Program
Interlocal Cooperative Agreement FY 20
Presentation transcript:

Miccosukee Road Resurfacing and Re-striping Public Input Requested On-Street Parking vs Bike Lanes

What’s Happening? Miccosukee Road is due for resurfacing. Miccosukee Road is due for resurfacing. Due to the build-up of asphalt from prior resurfacings, the road will be extensively milled first. Due to the build-up of asphalt from prior resurfacings, the road will be extensively milled first. Curb sections and sidewalk ramps will be reconstructed as part of the project. Curb sections and sidewalk ramps will be reconstructed as part of the project.

Re-Striping Normal practice when resurfacing is to restore the original striping plan. Normal practice when resurfacing is to restore the original striping plan. The Bicycle and Pedestrian Master Plan calls for the on-street parking to be replaced with bike lanes when the road is resurfaced. The Bicycle and Pedestrian Master Plan calls for the on-street parking to be replaced with bike lanes when the road is resurfaced. Recognizing impacts to the community served by this road, public input is being requested for consideration. Recognizing impacts to the community served by this road, public input is being requested for consideration.

What is this Master Plan? The Tallahassee-Leon County Metropolitan Planning Organization (MPO) developed the plan in The Tallahassee-Leon County Metropolitan Planning Organization (MPO) developed the plan in This was the first strategic 20-year plan to improve safety, connectivity and comfort for pedestrians and bicyclists. This was the first strategic 20-year plan to improve safety, connectivity and comfort for pedestrians and bicyclists. The MPO is now known as the Capital Region Transportation Planning Association (CRTPA) The MPO is now known as the Capital Region Transportation Planning Association (CRTPA)

What are the Project Limits? Miccosukee Road from west of Magnolia to Meridian Road. Miccosukee Road from west of Magnolia to Meridian Road. Turnouts to side roads will also be improved. Turnouts to side roads will also be improved.

Are there Options? Leon County would like to receive your input on three possible options for the re-striping of the road. This information will be presented to the Board of County Commissioners for consideration. Leon County would like to receive your input on three possible options for the re-striping of the road. This information will be presented to the Board of County Commissioners for consideration. The options are on the following slides. The options are on the following slides.

Option 1 – Bike Lanes The Master Plan currently directs that this option be used. The Master Plan currently directs that this option be used. The Board of County Commissioners can re-direct staff. The Board of County Commissioners can re-direct staff. This plan would remove all on-street parking for the project limits and install bicycle lanes in their place. This plan would remove all on-street parking for the project limits and install bicycle lanes in their place.

Option 2 – Modified Bike Lanes This option would call for replacing parking with Bike Lanes from Hillcrest to Meridian, but replacing the parking between Hillcrest and Magnolia. This option would call for replacing parking with Bike Lanes from Hillcrest to Meridian, but replacing the parking between Hillcrest and Magnolia. The travel lanes would be marked with sharrows, indicating that the lanes are shared with bicyclists. The travel lanes would be marked with sharrows, indicating that the lanes are shared with bicyclists.

Option 3 – Replace Parking This option would consist of replacing the existing striping plan, with parking, when the resurfacing work is complete. This option would consist of replacing the existing striping plan, with parking, when the resurfacing work is complete.

Public Meeting At the Public Meeting on April 29, County staff will have displays around the room and will be available to discuss the various options and to receive suggestions and input from you, the public. At the Public Meeting on April 29, County staff will have displays around the room and will be available to discuss the various options and to receive suggestions and input from you, the public. Staff from the MPO / CRTPA will also be available to discuss the plan recommended in the Master Plan. Staff from the MPO / CRTPA will also be available to discuss the plan recommended in the Master Plan.