Plan Purpose:  To provide pedestrian environments that are safe, attractive, and accessible to community institutions, employment and retail services.

Slides:



Advertisements
Similar presentations
Complete Street Analysis of a Road Diet Orange Grove Boulevard Pasadena, CA Aaron Elias Engineering Associate Kittelson & Associates Bill Cisco Senior.
Advertisements

West Portland Crossroads Community Forum Southwest Neighborhoods, Inc. March 15, 2010.
Washington Street Redesign Andrew Brunn, Kamila Misiak, Sarah Thomas The Long Term Solution.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Beautiful PB Workshop Summary 212 ideas + proposed design solutions summarized in four priority investment strategie s: Create a highly integrated network.
Right and Left Turns.
Presentation to Suburban Councillors February 2015.
Southern Corridor Study Recommendations March 16, 2011.
Transport.tamu.edu Options for Access Improvements Near MSC Wednesday, December 7, 2011.
Virginia Street Corridor Plan. From our Tier One University, world renowned recreation and our Midtown entertainment area to abundant cutting edge business.
Pedestrian and Bicycle Concerns About Highway Design and Operation Barb Mee, AICP City of Asheville Transportation Department
Advancing Active Transportation In Toronto ACT Canada Sustainable Mobility and Healthy Communities Summit December 2, 2014 Carol Mee, Toronto Public Health.
Slide 1. Slide 2 Introduction How did you get to school as a child?
Share the Road Lesson Plan. “Share The Road” Lesson Plan: Why??  Usually little or no training for cyclists, motorists, and pedestrians on safe interactions.
Midtown Alliance Capital Improvements Program
6 th Street (Junipero to Bellflower) Bike Boulevard Design Concepts March 2012.
South of Market Alleyway Improvement Project ALLEYWAY OVERVIEW: Project Goals Create outdoor living rooms for the community Create outdoor living rooms.
Fundamental Methods for Building More Walkable Communities Mark Fenton Pedestrian and Bicycle Information Center University of North Carolina.
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
Pinehurst School Traffic Safety Pinehurst School Traffic Safety Meeting January 27-28, 2015.
Curitiba, Brazil 40 Years of Careful Planning TravelBlog.
Walking and cycling routes Local facilities Streets Open space Public transport Supporting infrastructure Creating ‘commons’ Local planning.
Light House Projects Ghent – Car free zone
Safe Routes to School Quiz Show. Rules of the Game Your group will select a category and click on the point value for that category. Work with your group.
Virginia Street Bus RAPID Transit Extension Presentation to RTC July 17, 2015 Project Purpose Extend RAPID to UNR Improve pedestrian safety & access Create.
1 UNION STREET Easthampton | Complete Street Conceptual Design { { Streetscape for Union Street Community Workshop October 28, 2013 Planning Department.
Multimodal Corridor Plan BCC Discussion Item Transportation Planning Division August 19, 2014.
In association with: 73 rd Street to Indian Bend Wash Bridge THOMAS ROAD STREETSCAPE 73 RD STREET TO INDIAN BEND WASH BRIDGE PROJECT NO. T0606 City of.
Madison Avenue Traffic Calming Who We Are: Consortium of 17 neighborhood associations, churches, schools, hospital, and businesses concerned about economic.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
9 TH STREET IMPROVEMENT PLAN Corvallis Area Metropolitan Planning Organization (CAMPO) Ali Bonakdar.
Roads & Traffic Department College Green Public Transport Priority measure.
How to Add Active Transportation into Your Daily Life Photos courtesy of Bike Walk Ambassador Program.
COMPLEMENTARY MEASURES TO SUPPORT CYCLING Karl Reiter FGM- AMOR.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
The Main Street Bike Lane Project LADOT Bike Program.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
Presentation title | Date. Who We Are Building a Healthier Heartland (BHH)  Super-coalition of local and national partners that promotes policy, systems.
Civic Institutions Private development Parks & Squares Transportation & Downtowns Bus stops Main Streets (outdoor displays, streetscapes, cafés) Local.
Complete Streets Plan Philadelphia Vision Zero Presented by Raj Mohabeer PLA, ASLA, AICP, LEED®AP December 3, 2015 Detroit’s.
Traffic Safety. WHY ARE WE HERE To keep children safe around our schools What we will be discussing –Driving safely in and around Schools –Bicycle safety.
Safety Signs. Traffic Light Ahead Slow down and prepare to stop.
Lompoc Walkability Assessment September 24, 2009.
7 Tips to Bicycle Safety Safety Tip #1 Always wear a helmet!
Garrett Bolella, Tim Chan, Greg Khirallah, Dave Miele, Becca Ruitto.
DutchU.S.A. Cyclist Killed per 100 million km cycled Cyclist Injured per 10 million km cycled
Urban Design and Livability Bruce Monighan AIA Urban Design Manager, City of Sacramento City of Sacramento Planning Academy March 16, 2016.
Rules & Laws. Behaviours that show… RESPECTCAREEFFORT.
By Chris Perini STORING GREEN TRANSPORTATION. MANY PEOPLE (ESPECIALLY ON CAMPUS) USE BICYCLES FOR TRANSPORTATION Cities Here on campus.
Elliot Road Extension design critique and recommendations Petition to the Town of Chapel Hill Bicycle and Pedestrian Advisory Board March 25, 2014 Geoffrey.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
Bicycle Facilities Design Lecture 25 Norman W. Garrick.
Rock Creek East II Livability Study April 28, 2016.
Urban Street Design Standards Overview of Project and Details
STREETS, PEDESTRIANS AND BICYCLES
Measuring Walkability
US 92 Pedestrian Connectivity & Safety Assessment Study
The City of Colorado Springs Recognized a Unique and Powerful Window of Opportunity: Linking Expansion of its Knowledge and Innovation Capacity (UCCS)
North Lamar Boulevard Project
SR 60/Kennedy Boulevard and Jackson Street Resurfacing Projects
Concept Sketch of a Bicycle Priority Lane a) Multilane Street, along a Parking Lane When along a parking lane, right edge of bicycle priority lane is 10.
US 92 Pedestrian Connectivity & Safety Assessment Study
Roadway Scene Reuben Juster, EIT Faculty Research Assistant
City of Wilmington Bike Plan Update
Developing a Pedestrian -Bicycle Safety Action Plan
GATE SAFETY Traffic gates on JMU campus are for vehicles only. Do not cross beneath gates that are up as they may come down without warning. James Madison.
Public Participation in Carlisle Road Diet
Project Location: 35th Ave HSIP8
Presentation transcript:

Plan Purpose:  To provide pedestrian environments that are safe, attractive, and accessible to community institutions, employment and retail services.  The Pedestrian Mobility Plan is complimentary to Complete Streets Slide 2

Pedestrian Mobility Plan (Decision Making)

Complete Streets Walkability Toolbox Pedestrian Mobility Plan (Along the Street Solutions)

Complete Streets Walkability Toolbox Pedestrian Mobility Plan (Crossing the Street Solutions)

Current Strategic Initiatives Quick Wins: Enhanced Transit Stops (e.g. Prototype A) Slide 6

Current Strategic Initiatives Hamilton Strategic Road Safety Program: Enhanced Crosswalks  40+ locations Slide 7

Current Strategic Initiatives North End Traffic Management Plan  Reduced speed limit on local roads with supporting physical measures Slide 8

Current Strategic Initiatives Street Tree Program  Free street tree within City right- of-way  On average 6000 trees are planted each year (~60% are street trees) Slide 9

Current Strategic Initiatives

Slide 11 Current Strategic Initiatives

Hamilton achieved a silver designation. Slide 12

 Improved Road Safety Buffered Bicycle Lane – additional space for cyclists Buffer space for pedestrians Reduction of travel lanes and lane widths e.g. Complete Street (Victoria Street) Slide 13 Improved surface and pedestrian clear zone Complete Streets Approach (Victoria Street – One-way Alternative)

Which Street would you rather walk on? (e.g. York Boulevard) Wider sidewalks and new store frontage Green Streets & landscaping improvements Transit bays provide better access Bicycle lanes & bike parking Higher visibility street crossings Before After Slide 14 Complete Streets Approach (York Blvd: Two-Way Alternative)

City-wide Transportation Master Plan Update 15Slide: Complete Streets

Enter Presentation Name De THANK-YOU