2012.03.21, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.

Slides:



Advertisements
Similar presentations
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Advertisements

1 V1.00 © 2009 ZelFlex QR Quick Released double-sided mechanical stretching frame Step by step User guide.
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
H. MAINAUD DURAND CLIC ACTIVE PRE-ALIGNMENT SYSTEM: PROPOSAL FOR CDR AND PROGRAM FOR TDR.
XFD – XF Engineering Group October 20, 2005LCLS Undulator Alignment and Motion System1 Precision and repeatability of cam-shaft system in both directions.
1 RF-Structures Mock-Up FEA Assembly Tooling V. Soldatov, F. Rossi, R. Raatikainen
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
1/9 Hélène Mainaud Durand Sylvain GRIFFET, 28/11/2011 BE/ABP-SU/ Adjustment of 4 Drive Beam Quads positions on TM0 CLIC girders EDMS Document No
TT Assembly Structure Reference-Reinforcement System: 1.Description of the system 2.Assembling Procedure 3.Production Project Board, march 2005 D.Orlandi.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
ALIGNMENT OF Q2 LOW BETA QUADRUPOLES D. Missiaen, On behalf of the EN-MEF-SU/MTI team 1.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
, CLIC Test Module Meeting Concept of ‘hexapod type’ DB Quad adjustable support Mateusz Sosin.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team CLIC ACTIVE PRE-ALIGNMENT STUDIES: STATUS FOR CDR AND PROSPECTS FOR TDR PHASE.
CLIC alignment studies OUTLINE CLEX Alignment of the components Impact of beam on sensors readings Long term stability of the supports (girders, DB quad)
Friedrich Lackner (TS-SU) CLIC08 Workshop. CLIC Main Beam Quadrupole Magnet The Alignment Concept Expected Properties of a the Support Structure Foreseen.
CTC, Two-beam module program (WP CTC-004) CLIC Modules (boundary conditions, technical system design and integration) CDR modules Prototypes.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
MARS 2 Design Review-Optomechanical Review 07 Nov 2002 GLW1 MARS 2 Mechanical Design Review.
Dmitry Gudkov BE/RF/PM CLIC Module Working Group PROTOTYPE TWO-BEAM MODULES (CLEX) Supporting and positioning system for CLEX modules main conclusions.
Team: Wolfgang Burkert, Haimo Jöhri, Uwe Barth Mechanical precision and vibration behavior of mechanical supports Johan Wickström GFA-ATK.
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
CLIC Permanent Magnet Quadrupole update 1 st December 2010 Mechanical Engineering status N. Collomb1.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
DBQ support – motorization and performance upgrade Mateusz Sosin EN/MEF-SU.
January 25, 2005GRETINA 2004 Review1 GRETINA 2004 Annual Review Steve Virostek Lawrence Berkeley National Lab Mechanical System.
RUDE Vivien With the help of Hélène MAINAUD-DURAND And Mateusz SOSIN BE/ABP/SU CLIC MODULE September 19, 2011 Présentation REPORT OF THE CURRENT TESTS.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
Adjustable V-shaped support for TM1 Drive Beam girder Design review V. Soldatov, BE-RF-MK
CLIC Module meeting, 22/08/2011 N. Chritin (EN/MME) Cradles design for CLIC module supporting system (EDMS )  General principle  Main inputs an.
Short range alignment strategy in CLEX and first results CLIC Workshop January 2015 on behalf of : Hélène Mainaud-Durand, Mateusz Sosin Mathieu.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
Mount structure concept FM1 & FM2 Mount structure design 1) Aluminum structure. 2) Structure design for holding Newport mirror mount because of its compact.
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
CLIC module Experimental program for module array Module review, June 22 nd 2015Elena Daskalaki, BE-RF-MK.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
Procurement for the Supporting Systems
Pre-alignment of quadrupoles 1 CLIC stabilization day, STARTSLIDE PRE-ALIGNMENT OF THE MAIN BEAM QUADRUPOLES Hélène MAINAUD DURAND.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
DDBA magnets Chris Bailey Low emittance rings Sept Frascati.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Camera Motion System Requirement Design Details FEA.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
H. MAINAUD DURAND Studies on active pre-alignment for the CLIC project.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team Status on CLIC pre-alignment studies.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
Adjustable V-shaped support for TM1 Drive Beam girder Design review V. Soldatov, BE-RF-MK
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Installation of the waveguides between MB T0#2 and DB T0#2
Ad-hoc Transportation test of «CLIC module»
Girder-Magnets Installation
on behalf of the CLIC active pre-alignment team
TEST MODULE WG Cradles for CLIC module supporting system
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
F.E.T.S. Mechanical Engineering Update
Status of design and production of LEP connection cryostat
INSTALLATION SEQUENCE
ERMC/RMM activities May 2017
Platform for Target Spectrometer using linear montion drive Rexroth
List of changes and improvements for the next generation CLIC module
Installation plan for LAB modules
Rod adaptors for module tests Module positioning studies
By Arsalan Jamialahmadi
Mechanical System P09045: Membrane Characterization Test Stand
M. Modena, CLIC Stabilization Day # 10, 14 September 2010
Presentation transcript:

, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013

Mateusz Sosin Concept of ‘hexapod type’ DB Quad adjustable support Alignment requirements Mateusz Sosin Status of the DB Quad adjustable support design

Mateusz Sosin Concept of ‘hexapod type’ DB Quad adjustable support DB Quad position adjustment using modified „hexapod-type” mechanism According to reduced space for adjustable support integration Standard hexapod solution was changed to configuration with 3 supports in vertical and 3 supports in horizontal (that solution makes kinematics much simple for manual regulation purposes) One supporting ‚leg’ length isn’t adjustable and is rigid longitudinally (according to Z), rest of supports has adjustable lengths (l j ) Concept: Mateusz Sosin Status od the DB Quad adjustable support designMateusz Sosin Status of the DB Quad adjustable support design

Mateusz Sosin Concept of ‘hexapod type’ DB Quad adjustable support Tight space constraints 14.5mm for „hexapod” platform integration Small distance to V-supports Small distance to cradle (rear DBQ) Instalation on the girder Mateusz Sosin Status of the DB Quad adjustable support design DB Quad adjustable support - integration

Mateusz Sosin Concept of ‘hexapod type’ DB Quad adjustable support Mateusz Sosin Status of the DB Quad adjustable support design DB Quad adjustable support – main components REAR STIFFENING PLATE VERTICAL ‚LEG’ AND REGULATION UNIT FRONT STIFFENING PLATE (TRANSPARENT) GIRDER ASSEMBLY FRAME HORIZONTAL ‚LEG’ AND REGULATION UNIT DB QUAD PLATFORM BOTTOM PLATES

Mateusz Sosin Concept of ‘hexapod type’ DB Quad adjustable support DB QUAD PLATFORM GIRDER ASSEMBLY FRAME DB QUAD VERTICAL ‚LEG’ AND REGULATION UNIT Problem of tight space solved by profiling of the DBQ platform ‚sockets’ profiling Stiffness of Girder Assembly Frame Will be given by STIFFENING PLATES DB Quad adjustable support – main components Mateusz Sosin Status of the DB Quad adjustable support design

Mateusz Sosin Concept of ‘hexapod type’ DB Quad adjustable support Mateusz Sosin Status of the DB Quad adjustable support design DB Quad adjustable support – assembly on the girder Assembly to the girder using existing ‚bean’ holes’ Screwing to the GIRDER ASSEMBLY FRAME

Mateusz Sosin Concept of ‘hexapod type’ DB Quad adjustable support DB Quad adjustable support – regulation components 5DOF regulation thanks to flexure based supports 3 adjustable in vertical 2 adjustable in horizontal + 1 support with constant length Mateusz Sosin Status of the DB Quad adjustable support design

Mateusz Sosin Concept of ‘hexapod type’ DB Quad adjustable support Wedge based regulation 30mm of wedge move = 2mm of ‚leg’ stroke Expected resolution ~2µm Expected precision (considering thread backlash) ~5µm DB Quad adjustable support – vertical regulation unit Mateusz Sosin Status of the DB Quad adjustable support design Flexural vertical support with wedge-profiled head Threaded wedge Flexural vertical support sliding bearing Wedge sliding bearing Belleville spring stack Regulation screw bearing unit (2 flat needle bearings + tightening screw)

Mateusz Sosin Concept of ‘hexapod type’ DB Quad adjustable support DB Quad adjustable support – horizontal regulation unit Mateusz Sosin Status of the DB Quad adjustable support design Differential thread regulation screw Flexural horizontal support. One end threaded (as a part of regulation screw) DB Quad platform clamping block Differential thread based regulation 20 revolution of screw = 2mm of horiz.support stroke Expected resolution ~2µm Expected precision (considering thread backlash) ~10µm

Mateusz Sosin Concept of ‘hexapod type’ DB Quad adjustable support DB Quad adjustable support – longitudinal joint Flexure based joint Blocks longitudinal displacements of the DBQ platform Allows vertical and horizontal displacements + rotations (within assumed range) Mateusz Sosin Status of the DB Quad adjustable support design

Mateusz Sosin Concept of ‘hexapod type’ DB Quad adjustable support DB Quad adjustable support – prototype development schedule, CLEX installation Mid of March 2013 – begin of development works for DB Quad support (prototype should be ready and tested up to mid of July) Preliminary design (OK) Single ‚Vertical regulation unit’ and ‚Horizontal regulation unit’ machined and tested (up to ) Update of the preliminary design after the tests of vertical and horizontal regulation units prototypes. Machining of DB Quad support prototype up to end of July 2013 End of July 2013 tests of DB Quad adjustable support prototype. Update of preliminary design to final version according to prototype tests (up to mid of August) Improvement of support performance, stiffness, mass (and price) optimization Mid of August 2013 up to mid of September 2013 – T0 DB Quad adjustable supports procurement, parts machining and delivery End of September/begin of October 2013: DB Quad adjustable supports - CLEX installation Mateusz Sosin Status of the DB Quad adjustable support design