SIDING MATERIALS Floor Plan 40’ 24’ 16’ 32’ 24’

Slides:



Advertisements
Similar presentations
Framing.
Advertisements

Unit 55 Roof Finish Roof Overhangs and Cornices • Open Cornices • Closed Cornices • Cornice Soffit Systems • Covering Roofs • Asphalt Shingles • Wood Shingles.
CEM-STEEL Floor Decking Roof Decking Security Walls
 Nov 4 - regular class  Electrical text  Openings text  Nov 6 – no class  Nov 11 – no class – Veteran’s Day  Be sure to hug a Veteran (women only)
INAR 243 FLOORS.  Structural element  Proper ground for functions.
Siding Profiles. Lap Siding* 6” or Less 8” or More *name also applies to beveled siding.
Building Code – Flashing Changes & Challenges Builder Breakfast and Luncheon Series Presented by:
Welcome to Hardie 101 Basic Training
The Floor Cut away the flat side channel & replace with true 3D channel: (Evergreen.100”) Cut out the original floor from nearly bolster to bolster & replace.
Text goes here Agenda Welcome to Hardie 101 Basic Training Best Practices Version 6.2 – October 2012 Welcome to Hardie 101 Basic Training Best Practices.
Architectural Drawing
INSTALLATION INSTRUCTIONS FOR GERARD METAL SHINGLES
ROOFING MATERIALS. Prepping Materials A roof must be prepped before applying your roofing materials. Step one: Nail on Drip cap. This cap us used to prevent.
Chapter 20 Roof Plan Components.
Engineering Solutions Event  Six students will design a solution to an engineering problem.  Students will work as a team to design solutions.  Teams.
Custom Vehicle Applications February Internal usage only Common Customizations  Deck Plate Thickness - 3/8", ½" ¾"  Wear Plates - Fully welded.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Protection From the Weather
Construct Pitched Roofs (Simple)
Is it rock……..….or is it NextStone?.  Random Rock Panels  Drystack Panels  Accessories  Features/Benefits  Applications  Installation Overview.
CON 4003 Construction Estimating Prof R. V. Locurcio.
Lesson Siding Agricultural Structures Interest Approach What types of buildings siding have you seen on the farm? What are some of their advantages?
Old Main. Finalized Process Plans  Front Face Process Plan.
King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye.
SOLAR CHILL SOUTHWEST SOLAR PUMP POWER IN FAN MOTOR PAD MEDIA PUMP BOARD.
Construction Carpenter Vocabulary Created by The University of North Texas in partnership with the Texas Education Agency.
Balloon Frame North-American invention, 1833
Construction Framing Mr. Brock. Lumber 2x4s are not actually 2” by 4”
Copyright © Glencoe/McGraw-Hill Carpentry & Building Construction Applying Vinyl Siding.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Venting Solar Skylight Replacement / Trim Kit included in the box for a clean finish for any skylight replacement Factory Installed Blinds.
HW#2 – RSMeans Estimating Prof. Ralph V. Locurcio, PE.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Michael Kruse Chance Guthrie If we use the money wisely then the specifications of the house will be met. And we could build a house that meets the requirements.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Puesta Del Sol II Progress and Update Report May, June, & July, 2000.
Chapter 22 Roof Plan Components Roof Plan Types Roof Shapes
CON 4003 Construction Estimating Prof R. V. Locurcio.
Framing the House. Platform Framing Platform framing.
Pencil Case. Cut 1 square 8.25” by 8.25”. Cut another square 8” by 8.25” (this square is the lining and the width needs to be slightly smaller). Mark.
Tessellations You will need two pieces of computer paper and a small piece of thick paper and your final paper.
Starter Strip Starter Strip comes in lengths of 10’ Starter strip is installed around the exterior perimeter of the building The starter strip is nailed.
Ships Service Air System
STARLIGHT SKYLIGHTS How to Install: Standard Deck Mount Skylights.
Estimation of the Cost of a Job Repairing a Roof.
Chapter 24 Chimneys and Fireplaces Copyright Goodheart-Willcox Co., Inc. May not be posted to a publicly accessible website. Explain how masonry chimneys.
Construct Pitched Roofs (Simple)
Sound Mixing Basics. The columns on the left side are alike or very similar Each column represents a sound source The columns are called channels.
ROOFING BCGCA3007B.
Condominium Work Order Request Rowell Estates
Construction Framing Mr. Brock.
1420 Copper Creek Dr Pleasant Hill, IA $254,900
Lantern plans by Master Dafydd and Master Terafan
Greenhouse Components at Kirkwood
Fastener Selection.
How to Create your Sea Floor Spreading Model
Sketchbook assignment-part3
Review Questions 3rd MD.8.
Stainless Steel Water Well Casing.
Perforated Casing Pipe. Stainless Steel Perforated Casing.
Site Plan Tower 6 - Fiorenze Tower 4 - Divo Tower 7 - Gisella Tower 5 - Elba Tower 3 - Cossimo Tower 1 - Arabella Tower 2 - Bianca.
Framing the House                                                                                                                   
SAB 3122 CONSTRUCTION TECHNOLOGY AND ESTIMATING CONCRETE AND REINFORCEMENT Dr. Chai Chang Saar.
Tube Heater, 3,000 Watt 240V Top + Back Front 1”Hole For Mixer Shaft
Unit 8 Floor Framing.
Lecture 4 Building Construction 2 Week 5
Perforated Casing Pipe. Stainless Steel Perforated Casing.
Chapter 13 Concrete Form Design.
Presentation transcript:

SIDING MATERIALS

Floor Plan 40’ 24’ 16’ 32’ 24’

QUANTITYSIDING BID SHEETCOLORUNIT COSTTOTAL 24 SQUARE D 4”DUTCH LAP -VARIFORM.044 THICKNESS- CAMDEN POINT STONE MOUNTAIN CLAY$ OUTSIDE CORNERSSTONE MOUNTAIN CLAY$ BOXESJ CHANNEL 48 pieces per boxSTONE MOUNTAIN CLAY$3.70 piece $ box 10DUAL UNDER SILL TRIMSTONE MOUNTAIN CLAY$ MASTER EXHAUST VENTSTONE MOUNTAIN CLAY$ MOUNT MASTER HOSE BIBSTONE MOUNTAIN CLAY$9.75 1MOUNT MASTER METER PANELSTONE MOUNTAIN CLAY$ MOUNT MASTER FOR OUTLETSSTONE MOUNTAIN CLAY$8.70 5MOUNT MASTERS FOR LIGHTSSTONE MOUNTAIN CLAY$ STARTER STRIP$3.65 1STAINLESS STEEL TRIM NAILSSTONE MOUNTAIN CLAY$ STAINLESS STEEL TRIM NAILSSANDY TAN$ lb 1 ¼” roofing nails$ SQUARETRIPLE 4”CENTER VENT SOFFIT 16 pieces per boxSANDY TAN$7.30 piece 2 SQUARETRIPLE 4” SOLID SOFFIT 16 pieces per boxSANDY TAN$7.30 piece 10J CHANNELSANDY TAN$ F CHANNELSANDY TAN$3.86 7COIL STOCKSANDY TAN/WHITE$66.45 TOTAL COST 6 % sales tax 12% overhead and profit Siding Material Supplier #1

QUANTITYSIDING BID SHEETCOLORUNIT COSTTOTAL 24 SQUARE D 4”DUTCH LAP -VARIFORM.044 THICKNESS- CAMDEN POINT STONE MOUNTAIN CLAY$ OUTSIDE CORNERSSTONE MOUNTAIN CLAY$ BOXESJ CHANNEL 48 pieces per boxSTONE MOUNTAIN CLAY$4.20 piece $ box 10DUAL UNDER SILL TRIMSTONE MOUNTAIN CLAY$ MASTER EXHAUST VENTSTONE MOUNTAIN CLAY$ MOUNT MASTER HOSE BIBSTONE MOUNTAIN CLAY$9.55 1MOUNT MASTER METER PANELSTONE MOUNTAIN CLAY$ MOUNT MASTER FOR OUTLETSSTONE MOUNTAIN CLAY$3.70 5MOUNT MASTERS FOR LIGHTSSTONE MOUNTAIN CLAY$ STARTER STRIP$4.15 1STAINLESS STEEL TRIM NAILSSTONE MOUNTAIN CLAY$9.99 3STAINLESS STEEL TRIM NAILSSANDY TAN$ lb 1 ¼” roofing nails$ SQUARETRIPLE 4”CENTER VENT SOFFIT 16 pieces per boxSANDY TAN$7.25 piece 2 SQUARETRIPLE 4” SOLID SOFFIT 16 pieces per boxSANDY TAN$7.25 piece 10J CHANNELSANDY TAN$ F CHANNELSANDY TAN$3.99 7COIL STOCKSANDY TAN/WHITE$64.45 TOTAL COST 6 % sales tax 12% overhead and profit Siding Material Supplier #2