© ChevronTexaco 2005 Standards & Information Management Adrian Goulding IM/IT Manager OF-LCIM (Europe) “How a Standard approach to Information Mangement.

Slides:



Advertisements
Similar presentations
Rational Unified Process®
Advertisements

Commissioning Approach Integrated Service Solutions
Maximo extension to worldwide Suppliers for complete data integrity
Start with a Vision in Mind BP Greater Plutonio Project 7 th April 2005 PELC Conference 2005 Andy Till Angola DCT Program Manager BP Exploration.
Seminario Nuevas Tecnologías de Bentley para Minería 2007 Hotel Intercontinental – Santiago – Chile 04 Diciembre 2007 Bentley Mining Solution Rich Scotti.
Building an Operational Enterprise Architecture and Service Oriented Architecture Best Practices Presented by: Ajay Budhraja Copyright 2006 Ajay Budhraja,
Business Critical Rules March 2015
Adrian Cook, Group Head of Procurement
BUSINESS DRIVEN TECHNOLOGY Enhancing Collaborative Partnerships
Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,
ROI When Web Content Management Meets Knowledge Management
A framework for describing IT Project Management Processes and Tool Set Features Enterprise Project Management Framework.
Enterprise Web Content Management Path to developing a Competency Center Presented To: Presented By: Gilbane ConferenceBrian VanDeventer IT Manager, Web.
Documenting the Existing Network - Starting Points IACT 418 IACT 918 Corporate Network Planning.
KNOWLEDGE MANAGEMENT AT ACCENTURE
SAFETY MANAGEMENT INFORMATION SYSTEM By: Fahad Ishfaq Senior Engineer Safety.
1 Meeting the Reporting Challenges at International Paper.
1 © Copyright 2007 EMC Corporation. All rights reserved. EMC Documentum Information Rights Management EMC Content Management and Archiving.
Presented with Effective Document Management/Handover in the Engineering and Construction Sector This is a Title Slide with Picture and Two Logos slide.
Doc Document Management Systems For Manufacturing Industry Infocrew Solutions Pvt.Ltd.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
CORPORATE PROFILE
Basel Accord IITRANSITIONSERVICES Business Integration Support FCM Management Limited Paris New York Toronto.
HTML Comprehensive Concepts and Techniques Intro Project Introduction to HTML.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
The Internetworked E-Business Enterprise
© 2011 IBM Corporation Smarter Software for a Smarter Planet The Capabilities of IBM Software Borislav Borissov SWG Manager, IBM.
1 - 1 Copyright © 2006, The McGraw-Hill Companies, Inc. All rights reserved.
Cisco Confidential 1 © 2010 Cisco and/or its affiliates. All rights reserved. Data Center Solutions Marketing Data Center Business Advantage Customer Proof.
Office Management A Look from the Inside-Out Mohammad Najjar, PhD Management Science 1.
TAXONOMY CASE STUDY: SNC-Lavalin Infozone Taxonomy Project Joseph A. Busch Project Performance Corporation November 15, 2010.
© Dr. John T. Whiting All Rights Reserved Slide 1 The Rationale for Integrating IT Assets into the Strategic Business.
Industrial Engineering Roles In Industry
Standard way of sharing product data for nuclear power plants in Korea April 11th, 2005 Soonhung Han Plant Engineering Life Cycle Conference.
Achieving Interoperability for Equipment Supply Chains Mark Palmer FIATECH AEX Project Leader National Institute of Standards and Technology.
SMART GRID The Next Generation Electric Grid Kunkerati Lublertlop 11/30/2011 Electrical Engineering Department Southern Taiwan University.
Chapter © 2012 Pearson Education, Inc. Publishing as Prentice Hall.
More Construction for the Money “Back to the Future” Jim Porter 2004 Recipient Carroll H. Dunn Award of Excellence.
© 2008 IBM Corporation ® IBM Cognos Business Viewpoint Miguel Garcia - Solutions Architect.
Spuds, stakeholders and IM strategies: Moving from utilities to oil & gas Michelle Crosby (Hays IT) Content Management Analyst ConocoPhillips Australia-West.
E.Matias Canadian Light Source. Where is Saskatoon?
Thore Langeland, Ph.D. Manager IO, OLF Information sharing in the Norwegian offshore industry Hilton Americas Hotel, Houston, March.
Data Collection Solutions for your Business. © 2007 Data Systems International, Inc. All rights reserved. This information may not be distributed or reproduced.
Current Projects in DTEI Presented By: Tracy Jordan.
Core Issues in Linking e-GP and Procurement Reform Ram. SM, Project Manager National Institute for Smart Government 18 th May 2006.
ProMan asp Beyond software, it’s… SYSTEM! Application and Infrastructure SERVICE! Network professionals, application experts STRUCTURE! Proven methods.
Stephenson and Associates Ltd Data Management Best Practices August 2001.
Last Updated 1/17/02 1 Business Drivers Guiding Portal Evolution Portals Integrate web-based systems to increase productivity and reduce.
INFRASTRUCTURE CSIR 2015 CONFERENCE “IDEAS THAT WORK"
Enterprise Solutions Chapter 10 – Enterprise Content Management.
Providing Services to the Energy Industry Presentation By EPCM Consultants Pty Ltd EPCM Consultants Pty Ltd Comdain Group.
API Recommended Practice 17X Recommended Practice for Design, Installation, and Maintenance of Subsea Booster Pump Systems Status Report October 3,
Digital recordkeeping strategy for mobile work processes Joel Smith HPRM System Administrator.
Project Management May 30th, Team Members Name Project Role Gint of Communications Sai
Managing programs that promote personal effectiveness.
Oman College of Management and Technology Course – MM Topic 7 Production and Distribution of Multimedia Titles CS/MIS Department.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
Application of the ISO for BIM Xenia Fiorentini, Engisis.
EAsia Awards 2013 Project Name: National Products and Services Classification and Codification Islamic Republic of Iran.
Presented by: Dr. Kerry M. Joels, TMA Systems NFM&T 2012.
Quicx developed by Chinook Systems Inc. David Wampler, Software Manager Wanda Lenkewich, Owner 2014 buidlingSMART Challenge107-Jan-14.
Practical IT Research that Drives Measurable Results Vendor Landscape Plus: Enterprise Content Management Suite ECM: A vendor marketing concept, not an.
Uniper Energy Services
WHAT IS A NETWORK TYPES OF NETWORK NETWORK HARDWARE
Modern Systems Analysis and Design Third Edition
Cargo Solutions for Palma, Mozambique.
Your Facility Your Information
Office 365 and Microsoft Project Integrations for HULAK Project Management Software Enable Teams to Remain Productive and Within Budget OFFICE 365 APP.
Project Information Management Jiwei Ma
Presentation transcript:

© ChevronTexaco 2005 Standards & Information Management Adrian Goulding IM/IT Manager OF-LCIM (Europe) “How a Standard approach to Information Mangement promotes Standards in Information”

© ChevronTexaco 2005 Fifth Largest integrated energy company in the world and second largest in the US 1 Capital & exploratory budget in 2004 of $8.5 billion 1 Based on market capitalization

© ChevronTexaco 2005 Southern Africa Strategic Business Unit CABGOC (39.2%), Sonangol (41%), TotalFinaElf (10%) Agip (9.8%).

© ChevronTexaco 2005 Sanha Condensate Project - Statistics Three bridge-connected platforms; a remote flare; a lone oil-producing platform; a newly built floating production, storage and offloading vessel (FPSO); a trio of large compressors; and more than 62 miles (100 km) of pipeline $1.9 billion Capital Spend 100,000 barrels a day of oil, condensate and liquefied petroleum gas (LPG) by LPG FPSO is both the largest and first purpose-built vessel of its kind 500 million cubic feet per day of dry gas re-injected into the reservoir Project duration - 5 years

© ChevronTexaco 2005 Sanha Condensate Project - Scope

© ChevronTexaco 2005 Sanha Condensate Project - Reach 13 countries on five continents

© ChevronTexaco 2005 So on to Information Management...

© ChevronTexaco 2005 Adopting a Standard – Some wins and losses Corporate Business Unit guidance in the areas of Document and Drawing Numbering/Classification Drawing layout standards Tagging and Engineering specification Deficiencies in × Adherence to guidelines × Supporting Processes × Technologies that support/impose standards × Invited late to the Project

© ChevronTexaco 2005 Adopting a Standard - Lessons By Contract Specification  Not always specific  Seen as a cost not a saving By Procedures  Not always aligned By Business Unit Specification  Dated  Not Comprehensive

© ChevronTexaco 2005 Adopting a Standard - Technologies Shared Drives People’s PCs/CDs/ Contractor solution  But a different Contractor for –Each Phase –Different Scopes Funding an issue  No funding in FEED  No Central Systems

© ChevronTexaco 2005 Construction Starts Issues Remote Locations Japan South Korea Spain No IT plan in placeNo IM plan in place Built Infrastructure using private and VPN circuits Servers in Korea & Japan

© ChevronTexaco 2005 Collaboration Space was essential internet eRoom Server Suppliers

© ChevronTexaco 2005 Effects of a Collaboration Technology A tool to use  Web based sharing across the Intra & internet Improved work process  Rudimentary workflows  Basis for using Standards Better adherence to rules  Especially when additional tools were introduced  Transmittals  Change Order Tracking

© ChevronTexaco 2005 Document Capture – What? Classifications – and I will only focus on handover Studies Reports Drawings Data Sheets Calibration Settings Spare parts Design & Construction Manuals Operating & Maintenance Manuals

© ChevronTexaco 2005 Target Systems for Handover Drawings & Documents Recently installed Documentum System Existing FileNet system in Houston Maintenance Mangement System JDE World to be upgraded to Enterprise One Plethora of local Systems

© ChevronTexaco 2005 Documents – Reports & Studies These are extremely important to understand the fundamentals of the facility Flow Assurance  Basis for PFDs & P&IDs Safety Studies  Included in Basis of Design for capacity and layouts Hazardous Operation Studies  Safe Charts, Sim Ops plans and others Design Basis  Bringing it all together Early deliverables which were not included in the Document Numbering regime and so we now have large catch up. We can now quantify the results of not having standards

© ChevronTexaco 2005 Documents - Drawings Best known deliverable, which in turn has been best managed Standard Layouts and Title Block Autocad the Standard Master Drawing Register But... 2D deliverables becoming harder to deliver in a 3D world 3D model not brought to As Built and not used beyond Start Up

© ChevronTexaco 2005 Documents – Data Sheets Key deliverable from our EPC and a key document within the operations – about 3 rd on the list of wants Higher percentage in Excel or Word format Captured as unstructured data But... Common classification is missing Common layout is missing Common units are missing Should ChevronTexaco drive a standard?

© ChevronTexaco 2005 Documents – Calibration Settings for example An example of a commissioning activity Sanha did not have an Owner Operator Commissioning Tracking System – in the authors view a mistake. It should have tracked by tag, line, cable, end device  Mechanical completion  Calibration  Commissioning activity  Startup What we have now is a high amount of unstructured handwritten information in commissioning dossiers

© ChevronTexaco 2005 Documents – O&M, D&C & Vendor Manuals An extra 320 feet of shelving is going to be required to house one copy of the manuals at our shore base in Angola Steps towards structured information  Classification of content  Nomenclature in document numbering  Use of Document Management System, Web Delivery & CD Snapshots Barriers  Variety of content  Getting into other’s business processes  Format

© ChevronTexaco 2005 Bringing Structure to Vendor Documentation Classification of content Dividing into files by classification Adding meaningful meta data Restructure Hierarchy 350MB PDF file on a CD Delivered Restructure by :-

© ChevronTexaco 2005 Documents – Spare Parts Two elements Sparing Philosophy & Spare Part Catalogues Again unstructured data but key to the three elements Asset Register CMMS 1 Document Management Common codes can bring it together Where we define the Asset Where we know how to maintain it Where we maintain knowledge 1 Computer Maintenance Management System

© ChevronTexaco 2005 Commissioning Tracking what could have been Asset Register Data Required Data Captured Tracking System Commissioning Task

© ChevronTexaco 2005 Data Capture - Use of Data Warehouse Rapid deployment because technology already adopted - eWarehouse Used as a vehicle for capture and handover Equipment Instruments & end devices Lines Populated our CMMS – JDE Edwards Advantages Classification Normalisation Structure “Best set of information in the Concession”

© ChevronTexaco 2005 Data Warehouse – beyond Handover Wants to be included as a key information repository in Operations Hold a higher granularity of data Hold relationships Step towards Common Asset Codes

© ChevronTexaco 2005 Tying the information together Remember this? Asset Register CMMS Document Management Common codes can bring it together Where we define the Asset Where we know how to maintain it Where we maintain knowledge Portal – Roles based Data Warehouse

© ChevronTexaco 2005 Thank you for your attention Questions