Start with a Vision in Mind BP Greater Plutonio Project 7 th April 2005 PELC Conference 2005 Andy Till Angola DCT Program Manager BP Exploration.

Similar presentations


Presentation on theme: "Start with a Vision in Mind BP Greater Plutonio Project 7 th April 2005 PELC Conference 2005 Andy Till Angola DCT Program Manager BP Exploration."— Presentation transcript:

1 Start with a Vision in Mind BP Greater Plutonio Project 7 th April 2005 PELC Conference 2005 Andy Till Angola DCT Program Manager BP Exploration

2 2 Background Block 18 – 6 deepwater fields operated by BP FPSO – Floating production, storage & offloading vessel 300m Long, 250kbbls / day EPCm contract with Kellogg Brown & Root, UK FPSO Hull built by Hyundai Heavy Industries, Korea First Oil Q2 2007 BP investment of $3.3b

3 3 Learning Cycle Planning Standards Specifications Doing Contracts Data Collection Tools Reflecting Assurance Audit Linking Cleansing Correction Vision Planning

4 4 GPP Information management (Planning) Define Statement of Requirements during early stages of project (pre-feed) Agree standards i.e. ISO 15926 Agree project data and document requirements Write the requirements in to the contract Handover requirements (Responsibilities / Accountabilities) Detailed standards (numbering / handover) Clear Data Model Early Visibility of Data

5 5 Core Data Model

6 6 Data Collection (Doing) ICT Phasset Oracle Data Vault Document Vault Documentum KBR Oracle Data Vault Supplier Electronic Documents SDRL Document Register EIHS Templates and SDRL Data Requirements Import or Data Entry Document Posting/ Review Suppliers Propid P-H Document Meta-Data Engineering Data & Relationships Supplier SDRL Documents - Processes V

7 7 Close collaboration with: (Reflecting) KBR – EPCm Contractor Pearson-Harper – Validation and Content & Data Collection Tool Aveva – 3D Model & Engineering Portal People Process Technology

8 8 The Learning Cycle (Revised)

9 9 What is your paradigm? Electronic Data & Documents Single window Global Access

10 10 Status of deliverables

11 11 Conclusion Write requirements in to the contract (2 Years 3 months to polish the data) Comprehensive information set available for HUC and Operations (required detail in EIHS) Confidence the information set will be complete for 1st Oil (data has been validated) Any electronic system is only as good as the data entered (consistency and cleansing) Angola has only scratched the surface of possibilities Have a Vision People Process Technology

12 12