UNIVERSITY OF CALIFORNIA. Web Job Order Samantha Brown Co-developed with Jennifer Fish February 2014.

Slides:



Advertisements
Similar presentations
Welcome to the Montreal MIS Tutorial. MIS Tutorial What is an MIS What is the MIS role in JDF Introduction Gray Boxes MIS Requirements – Job Costing.
Advertisements

Upgrading the Oracle Applications: Going Beyond the Technical Upgrade Atlanta OAUG March 19, 1999 Robert Cooney.
The Documentum Team Lance Callaway, Brooke Durbin, Perry Koob, Lorie McMillin, Jennifer Song Missouri University of Science and Technology Rolla, Missouri.
Systems Analysis & IT Project Management Pepper. System Life Cycle BirthDeathDevelopmentProduction.
Planning & Scheduling Systems: From Design to Fabrication.
For MIP Fund Accounting Software
Standard Financial Information Structure (SFIS) Overview Presented by: Ray Bombac Business Transformation Agency.
John Langsford 13 September 2006 CI Implementation Project.
Ed Gray, PE Public Service Electric and Gas
System Analysis and Design (SAD )
Modern Systems Analysis and Design Third Edition Chapter 11 Selecting the Best Alternative Design Strategy 11.1.
Mercury Quality Center Formerly Test Director. Topics Covered Testdirector Introduction Understanding the Testdirector Interface. Understanding Requirement.
Slide 1 INTRODUCTION Chapter 1. Slide 2 Key Ideas Many failed systems were abandoned because analysts tried to build wonderful systems without understanding.
Oracle General Ledger, Financial Reporting and Data Warehouse 6/22/2015 RIAS PHASE II Overview.
July 18, 2003SA, HRMS, FIN Unit Liaison Meeting1 Training Approach Project Initiative (TAPI) Update Frances Mueller Cathy Handyside July 18, 2003.
The Production Process
Integrated Practice Management Systems. Learning Objectives After reading this chapter the reader should be able to: Document the workflow in a medical.
© 2006 IBM Corporation SOA on your terms and our expertise Discovering the Value of SOA SOA In Action SOA & End-2-End Business Driven Development using.
Achieving Operational Excellence and Customer Intimacy:Enterprise Applications Chapter 9 (10E)
Model-Based Manufacturing PARTICIPANTSIMS ACTIVITY OPPORTUNITY Improved cross domain interoperability Enhanced modeling and simulation Optimized design.
SPAWAR HQ (General Fund) Navy ERP Implementation Lessons Learned – Comptroller View.
System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
Starter Kit. Starter kit Production : Cut operations receiving ECN (Eng. Change Notice) Auto copy to prod orders details Shop floor reporting Generic.
Software Evolution Planning CIS 376 Bruce R. Maxim UM-Dearborn.
Configuration Management Process and Environment MACS Review 1 February 5th, 2010 Roland Moser PR a-RMO, February 5 th, 2010 R. Moser 1 R. Gutleber.
Effective Methods for Software and Systems Integration
JWST Integrated Modeling Environment James Webb Space Telescope.
RAILINC I ACACSO
Financials – Phase II Kick-Off Meeting September 11, 2008 Brenda Bolander, State Comptroller Michael Grisser, Project Manager.
Student Administration Finance Human Resources Research Administration Mosaic Improving Business and Administrative Processes at McMaster University.
ShopKeeper was designed from the ground up to manage your entire fleet maintenance operations … from 1 user to 100, including full security features that.
SOFTWARE ENGINEERING MCS-2 LECTURE # 5. RAD (RAPID APPLICATION DEVELOPMENT) MODEL  In RAD model the components or functions are developed in parallel.
11 the best Customer satisfaction enhancement plan N. Jerry Simonoff Director, IT Investment & Enterprise Solutions CIO-CAO.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
ITS NCID Next Generation (NG) Project Overview February 24, 2010.
1 G A A new Document Control System “A new system to manage LIGO documents” Stuart Anderson Melody Araya David Shoemaker 29 September, 2008
University of Wisconsin System HRS Project Update to ITC November 19, 2010.
1 Warranty and Repair Management For Infor XA Release 7 WARM Denise Luther – Sr. XA Consultant WARMS Technical Manager CISTECH, Inc. Rod Fortson – Sr.
Database System Development Lifecycle 1.  Main components of the Infn System  What is Database System Development Life Cycle (DSDLC)  Phases of the.
MERCURY BUSINESS PROCESS TESTING. AGENDA  Objective  What is Business Process Testing  Business Components  Defining Requirements  Creation of Business.
Overview & High Level Plan Date: Team: Todd Kaywood, Alex Wiechers, Andy Idema.
Enabling Project Communication, Collaboration & Workflow (CCW)
Core Business Processes and Organizational Value Chains
Supporting the needs of Core Lab managers and users CORES: Core Ordering and Reporting Enterprise System.
Cmpe 589 Spring 2006 Lecture 2. Software Engineering Definition –A strategy for producing high quality software.
System Design and Deployment Status PDS Management Council Face-to-Face UCLA, Los Angeles, California November 28-29, 2012 Sean Hardman.
GCRC Meeting 2004 BIRN Coordinating Center Software Development Vicky Rowley.
Oracle Warehouse Builder - Beta 1 New Features Jean-Pierre Dijcks.
Industry Goals. Increase Customer Satisfaction  On-Time, On-Budget, Within Scope  Ensure High Quality Delivery Increase Margins  Drive Efficiencies.
Modern Systems Analysis and Design Third Edition Chapter 11 Selecting the Best Alternative Design Strategy 11.1.
Worldwide Protein Data Bank Common D&A Project Sequence Processing Modular Demo May 6, 2010 Project Deliverable.
Contract Year 1 Review IMT Tilt Thompkins MOS - NCSA 15 May 2002.
System/SDWG Update Management Council Face-to-Face Flagstaff, AZ August 22-23, 2011 Sean Hardman.
Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 11 Selecting.
Systems Development Life Cycle (SDLC)
Patricia Alafaireet  Lecture 2 – Implementation and go-live strategies Data conversion Communication Planning Downtime.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
1 Presented by: Val Pennell, Test Tool Manager Date: March 9, 2004 Software Testing Tools – Load Testing.
Managing multiple projects or services? Have a mix of Microsoft Project and more simple tasks? Need better visibility and control?
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
AMIGO Assistance for BMC TrueSight Infrastructure Management
Banner Project Student Team Update
Maintaining software solutions
Deploying CIM to Bridge the Modeling Gap Between Operations and Planning Mike usa.siemens.com/digitalgrid unrestricted © Siemens AG 2017.
Leigh Grundhoefer Indiana University
System Review – The Forgotten Implementation Step
Your Facility Your Information
Model-Based Manufacturing
Presentation transcript:

UNIVERSITY OF CALIFORNIA

Web Job Order Samantha Brown Co-developed with Jennifer Fish February 2014

Web Job Order | October 30 th, 2012 WJO - Introduction The WJO is an integral part of the Engineering process flow as it bridges the gap between the design phases and the actual installation of components. It requires integration with the Document Control Center upstream and procurement downstream. This tool allows engineers and designers a way of realizing their designs.

Web Job Order | October 30 th, 2012 WJO - Brief History The precursor to the Web Job Order stems from a paper based form that engineers/designers would fill out prior to handing off to a procurement liaison. Back in the late 1990s, an effort was made to convert the process to the digital realm by our centralized IT staff. This system, as it exists today, closely mimics the original paper form.

Web Job Order | October 30 th, 2012 WJO – Redevelop Decision Core users identified need to replace existing interface Cited reasons for upgrade: User interface dated and input mechanisms were tedious Attachments were prone to transfer failures Document Control integration was wanting Enables better tracking for projects, procurements, fabrication, assembly, and installation Better support since original development team in IT dissolved Opportunity to integrate the process better with our workflow

Web Job Order | October 30 th, 2012 WJO – Unique Capabilities Tight integration with WBS of Engineering Fabrication projects through category codes Capture all labor and PO/Pcard costs under a single account number Enables better project accounting Future project estimations generated from WJO data Utilize one interface for onsite or offsite fabrication Extensive integration with Engineering’s Document Control Center (a CAD neutral release repository) in addition to being an important hub in the design process

Web Job Order | October 30 th, 2012 WJO – Logistics Both systems (the old & new interface) are currently live and running in parallel

Web Job Order | October 30 th, 2012 WJO - Demo Live Demonstration Of new WJO interface

Web Job Order | October 30 th, 2012 WJO – Current Status The new WJO is accessible at wjo2.lbl.gov Both systems will continue to run in parallel for the next month Any JO started on either system requires completion in the same system Beginning in October this year, the new WJO and all of the lab’s financial infrastructure will have significant changes (known as F$M) Old WJONew WJO UC12xxxUC20xxx

Web Job Order | October 30 th, 2012 WJO – Yet to be implemented Short Term Deliverables Date Promised By (from Procurement) RFQs Clone JO Long Term Direction Deeper integration with JobBOSS via the B77 Shops Management of QA documentation Possible tie in with LBNL’s delivery tracking system

Web Job Order | October 30 th, 2012 WJO – Q & A Session Questions old interface: wjo.lbl.gov new interface: wjo2.lbl.gov Samantha Brown (x5640) Jennifer Fish (x2320)