1 Magnet field testing Kevin Tilley, Paul Flower, Mark Rayner, Henry Nebrensky, 16 th November Upstream magnets:- Dipole B1 Quadrupoles Q1-Q3 Downstream.

Slides:



Advertisements
Similar presentations
Ion Source Modelling and Field Index Improvements by Scott Lawrie.
Advertisements

ALICE Magnets Ben Shepherd MaRS Group ASTeC STFC Daresbury Laboratory.
1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
MICE MICE Target Mechanism Paul Smith University of Sheffield 8 th June 2010 (Based upon talk given by Chris Booth at CM26)
Ramesh Gupta, BNL D1 Dipole Design / IR Magnet Study LARP Collaboration Meeting, Oct 5-6, D1 Dipole Design Task (terminated in 2005) IR Magnet Study.
D2 conceptual design and field quality optimization Ramesh Gupta, BNL Slide No. 1 Nov. 13, 2013 D2 Conceptual Design and Field Quality.
5/3/2015J-PARC1 Transverse Matching Using Transverse Profiles and Longitudinal Beam arrival Times.
SXC meeting SRON, July 19-20, SXC meeting 19-20/07/2007 Alignment Positioning of mirror with respect to detector (internal). Positioning of total.
5/18/2015J-PARC1 High Level Physics Applications Magnets & Beams Day ?, Lecture ? Accelerator View from the Physicist.
Magnets for the ESRF upgrade phase II
Slide 1 MICE Beamline Design and Commissioning Review 16 th Nov 2007 Simulation comparison / tools / issues Henry Nebrensky Brunel University There are.
Paul drumm, mutac jan K. Tilley, MICE-VC, 10/05/07 Status of Beamline Design / Commissioning MICE-VC.
March 30, 2004 TJR1 MICE Beamline Performance with New Magnet Descriptions Tom Roberts Illinois Institute of Technology March 30, 2004.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
Mark Rayner, Analysis workshop 4 September ‘08: Use of TOFs for Beam measurement & RF phasing, slide 1 Use of TOFs for Beam measurement & RF phasing Analysis.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
1 MICE Magnets Contents: Background Refurbishment Testing Installation & survey Current status Upstream beamline Open issues & concerns MICE Beamline Review,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnetic Specifications and Tolerances Weiming Guo, NSLS-II Project In this presentation I briefly introduced the.
MICE magnetic measurements Sequence of events and MICE hall movements Alain Blondel – 10-April 2012 revision from 13 December 2012.
1 Warm Magnets Work Package Status J. Bauche, TE-MSC Technical Meeting, 9th January 2014.
BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet Design Workshop: Magnet Design and Analysis Charles Spataro, NSLS-II Project NSLS-II is a new 3Gev synchrotron.
1 / 19 M. Gateau CERN – Geneva – CH 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland.
Hypernuclear Physics in Hall A E Status John J. LeRose December 16, 2009.
Lecture 5 Jack Tanabe Old Dominion University Hampton, VA January 2011 [1] Halbach, K., FIRST ORDER PERTURBATION EFFECTS IN IRON-DOMINATED TWO- DIMENSIONAL.
1 Beamline 1. Beamline Target/Misalignment problem 2. Magnet measurements 3. Everything that’ critical and outstanding – eg d/str beamline monitors final.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
Beam line commissioning Preparations for Phase1 Kevin Tilley For Paul Drumm & the beam line group.
Plans (& ideas) for beamline commissioning The beamline Magnet field tests Source characterisation Optics (& model) commissioning K. Tilley CM18, 14/06/07.
Magnet Measurement for the Hall A Compton Dipole Ken Baggett
Extraction from the Delivery Ring November 19, 2013 J. Morgan.
BINP experience in magnet production Sample. Example of MLS Dipole modeling Number of magnets8 Bending angle, deg45 Bending radius, mm1528 Gap, mm50 ±
Magnet Design & Construction for EMMA
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
3 June 2009J. H. Cobb 1 ANALYSIS SUMMARY CM24 Agenda for Analysis parallel session at CM Sunday 31 May 14:00.
1.Placement of support base for 70 degree-dipole magnet(D) ・ Support base for 70 degree-dipole magnet(D) should be placed horizontally with a spirit level,
Consolidation of the Booster Injection Quadrupole Magnets (part 2) A. Aloev 14 th February 2013.
Magnetic Metrology of SOLEIL Synchrotron S.R. Multipoles IMMW 14, A. Madur Magnetic Metrology of SOLEIL Synchrotron Storage Ring Multipoles A. Dael, P.
XFEL X-Ray Free-Electron Laser Bernward Krause MEA WP-12: Warm Magnets WPL: B. Krause.
1 Beamline Work. Optics:- Simulation debugging (then redesign..) Commissioning Hardware:- Dipole B1 beampipe installation issue Further magnet measurements.
ATF2Quad Fab & Measurement Status Cherrill Spencer 01/31/06 1 Brief Status Report on Fabrication & Measurement of ATF2 Quads By Cherrill Spencer, SLAC,
2 July 2002Realistic Fields for a Ring Cooler Magnet System -- S.Kahn Page 1 Realistic Fields for a Ring Cooler Steve Kahn 2 July 2002 NuFact’02 Meeting.
Highlights of Prototype SC Magnet Tests (LCLSII- 4.5-EN-0612) and Proposed Production Magnet Test Plan (LCLSII-4.5-EN-611-R0) and XFEL Magnet Test Results.
ATF2 weekly meeting 4 July 2007 MONALISA: Attachment of Vacuum Vessels for ATF2 David Urner.
Prepare specifications/requirements magnetic and mechanical characteristics operation mode Development of Test facility - dedicated test facility to study.
Lecture 7 Jack Tanabe Cornell University Ithaca, NY Magnetic Measurements.
Design Update Puck and Gun Magnet February 16, 2016.
Status of RHIC Polarization Studies. Summary of Polarization Studies during Run09 Tune scans: – Nearby 0.7 – Near integer tune Polarization ramp measurement.
Practical aspects of small aperture quadrupoles Dr Ben Leigh Tesla Engineering Ltd.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
DDBA magnets Chris Bailey Low emittance rings Sept Frascati.
MICE Spectrometer Solenoids Step IV running. MICE Spectrometer Solenoids Remember: Both magnets met the full specification at the vendor and were fully.
MICE Spectrometer Solenoids Step IV running
PANAGIOTIS FARANTATOS(TE/MSC-MNC)* WP3, ESR 4: New Magnet
Test of a Permanent Magnet Quadrupole Placed in a Dipole Field
Procurement, Measurement and Installation of 2 Octupoles for ATF
MICE Operations Scenario Run 1
MICE PM Report Progress with the Infrastructure A few problems
Validating Magnets Using Beam
ILCDR08 10 July 2008 Plan of measuring cloud density in the solenoid field and in the quadrupole field K. Kanazawa (KEK)
Test beam setup: status report 10/02/2009
MDL0L02 Dipole Field July 6, 2016.
HRS at small angles for e+/ e- pair for APEX
Rogowski coils as beam position monitors
CEPC Collider Magnets CHEN, Fusan November 13, 2018.
Electron Collider Ring Magnets Preliminary Summary
Polarized 3He target installation
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Presentation transcript:

1 Magnet field testing Kevin Tilley, Paul Flower, Mark Rayner, Henry Nebrensky, 16 th November Upstream magnets:- Dipole B1 Quadrupoles Q1-Q3 Downstream magnets:- Dipole B2 Quadrupoles Q4-Q9

2 2 Upstream dipole – B1 – completed tests Upstream dipole critical to extract beam from synchrotron vault. Performed functional tests prior to installation in July. Performed electrical/water tests (AN talk) Field map & L_effective as expected Central field versus current to 250Amps. Measurements agreed perfectly with tables & theory (Leff) to 250A. Not tested to full field.

3 3 Upstream dipole – B1 – future tests Polarity in situ Full B.v.I tests (into saturation) Determine rqd reproducibility (B/I) Measure hysteresis & complete standardisation if rqd. Scheduled for w/c 14 th Jan’08 Note, some discussion about changing pole tip of this magnet for non-tapered pole (homogeneities) – use same tests May monitor the field of this measurement directly during running if hysteresis significant.

4 4 Upstream quadrupole – Q1 – completed tests Performed functional tests prior to installation in July. Performed electrical/water tests (AN talk) Measured g.v.I, hysteresis Measured (g, magnetic centre, skew)

5 5 Upstream quadrupole – Q1 – completed tests Jig allows measurement of field relative to mechanical centre & known rotation – survey references. Sample field along 3 lines -> extract 4 parameters, then solve for (g,magnetic centre(x,y), skew). Errors in magnetic centre ~ ±0.1mm no significant magnetic centre displacement no significant skew. g.v. I as expected. hysteresis measured at ~0.5% - magnet works ok.

6 6 Upstream quadrupoles – Q1-Q3 –future tests Polarity in situ Scheduled for w/c 14 th Jan’08

7 7 Downstream dipole – B2 – future tests Polarity in situ Full B.v.I tests (into saturation) Determine rqd reproducibility (B/I) Measure hysteresis & complete standardisation if rqd. Scheduled for w/c 9 th Jan’08 or early December if services available.

8 8 Downstream quadrupoles – Q4-Q9 – present tests Perform basic tests.…to qualify as early as possible if any problems exist.… Pole tip fields to determine ~g.v.I Field balance on each pole tip / colloid. If indications, potential to perform detailed checks with jig. Expected to begin this week, turnaround time <1week per magnet.

9 9 Downstream quadrupoles – Q4-Q9 – present tests We have only incomplete field specifications for the Q35s! Detailed tests on at least two Q35s complete with mirror plates. Measure one magnet with each of the two coil types for reference data. L_effective. Adaptor & jig -> detailed (g,magnetic centre(x,y), skew) as before. g.v.I Determine required reproducibility. Hysteresis. Standardisation if required. In ~2-3weeks

10 Summary. Upstream magnets:- Dipole:- performs well to 250A. Checks of full current, polarity, hysteresis in situ. w/c Jan 14th Quadrupoles: one magnet tested – performs well. Polarity of all in situ. w/c Jan14th. Downstream magnets:- Dipole:- to be tested early December or w/c Jan 9 th. Quadrupoles: basic testing schedule commencing this week. Detailed measurements on at least two of differing coil types for reference data.