Plans (& ideas) for beamline commissioning The beamline Magnet field tests Source characterisation Optics (& model) commissioning K. Tilley CM18, 14/06/07.

Similar presentations


Presentation on theme: "Plans (& ideas) for beamline commissioning The beamline Magnet field tests Source characterisation Optics (& model) commissioning K. Tilley CM18, 14/06/07."— Presentation transcript:

1 Plans (& ideas) for beamline commissioning The beamline Magnet field tests Source characterisation Optics (& model) commissioning K. Tilley CM18, 14/06/07

2 The beamline until Jan? (this presentation) ‘please sir’

3 Magnet field tests – Upstream: Q1-3 & B1 Upstream Possible – In test area: QIV(s), (B1 – less likely) Sometime 18/06 – 01/07 – currently being discussed Upstream Fallback – In situ: QIVs, B1 By negtd access August?

4 Magnet field tests – Upstream Possible In test area: QIV x1+, (B1 – less likely). being discussed for 18/06 – 01/07 eg: QIV before installation. - Pole tip fields v Current to 200A (cf. old g.v.I data) (compare to old data curve) - deGauss procedure (to 200A) - Gross magnetic centre (with Mr Heath Robinson) Currently searching for XY translation stage/support- - for improved versions of all above - L_eff & field quality – unlikely.

5 Magnet field tests – Upstream Fallback In situ: QIVs, B1. By negotiated access August? - for QIVs:- - polarity (Hall probe between poles) - deGauss procedure? (ditto: desire minml jig?) - others are more difficult (but may try). (note do have old g.v.I data) - for B1:- - polarity - B.v.I – some access (desire miniml jig?) (note do have old B.v.I data) - deGauss procedure

6 Magnet field tests - Downstream Same plan as CM17 – B2, Q35s Unchanged procedure & measurements: - we have no B.v.I tables for Q35s - use XY stage/jig (for Q35s)... - still need someone to make jig. Timeframe – If B2 to be used Aug onwards – measure August?! Q35s sometime Sept – Dec? Location – undefined. Test area if pre Dec? MICE Hall once installed?

7 Magnet field tests – Decay Solenoid Discovered I don’t have any B.v.I tabulation ! Does PSI have these? (could we measure these? eg. fringe field & model?)

8 Source characterisation – naïve ideas

9 Once beam, could consider using available detectors to tell us something about particle source, ie:- - Determine intensity (au) of whole flux versus momentum - Range out protons & determine intensity (au) of (∏ +µ+e) versus momentum - Range out protons & use Ckov1, later TOFs to: determine intensity (au) of ∏ versus momentum - Knowing ~ intensity (au) may help beamline setup for maximum flux etc.

10 Source characterisation – naïve ideas Once beam, might consider using available detectors to tell us something about particle source, ie:- - Determine intensity (au) of whole flux versus momentum eg. (preceeding optics setup):- - use upstream fibre monitor for intensity (au) - use momentum scan of B1 (Quads off)

11 Source characterisation – naïve ideas If synch vault was still accessible could also:- - Determine intensity (au) of (pi+mu+e) versus momentum:- eg. (preceeding optics setup) - insert protons absorber before u/str monitor - use momentum scan of B1 (Quads off) If synch vault or DSA not accessible, but B2 available, could perform same experiments with d/stream monitor, scanning both dipoles (B1=B2)

12 Source characterisation – naïve ideas For even more fun, bring in Ckov1 / (later TOFs?) into play ?:- - Determine intensity (au) of (pi) versus momentum ?:- eg. (again preceeding optics setup) - insert proton absorber before d/str monitor - use Ckov1 count how many hits not pi’s. diff = pi’s - much easier if TOF available! - use momentum scan of B1 (Quads off) (Does this work? I told you I was naïve !)

13 Optics (& model) commissioning Aim maybe to get the real optics into the design configuration. This might be:.or something slightly different nowadays. Aim to get this section understood & right

14 Optics (& model) commissioning Start with best avail model (TTL/g4bl) – best developed & cross checked. Make simple expts and compare measurables to model – to establish we understand basic beam/model behaviour. Potential measureables:- upstream monitor: vertical beamsize (vertical position) flux if DSA available, use d/str mtr there: vertical beamsize (vertical position) flux. could use both monitors:-> vert opt fns & ε v ? I don’t know how to measure horizontal beamsize/posn directly (only via flux)

15 Optics (& model) commissioning Example: Q1 on, Q2/Q3 off. B1 on. Vary Q1. Observe change in vertical beamsize/optic fns/ ε v Compare with model expected behaviour. Could fit model to machine. (L_eff etc) Vary target depth. Repeat above. Observe if any change in vertical position (source position) Finally bring up Q1-Q3 as single lens. Modify Q1-Q3 using model until believe obtain design optic.