Provisioning the Power System for the Porter Farms P.D. By: Marnelli Pascual Christian Brothers University 650 East Parkway S, Memphis TN 38104 MAESC CONFERENCE.

Slides:



Advertisements
Similar presentations
BACKGROUND: We are finding an increase in instances where the available fault current at underground (UG) 1-phase residential service entrance equipment.
Advertisements

Substation L1/ MCC L1 Update March 21 st, Current Location.
10 The Service Entrance. 10 The Service Entrance.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
Major Underground Design John Perez. Underground Engineering Design Practices Three Phase Circuit –Infrastructure: Ductbanks & Manholes All three phase.
Master Examination Practice Drill # O 1. Given: Two (2) rigid metal conduits (RMC) are to support a weatherproof 18 cu. In. device box, with threaded.
Master Examination Practice Drill # Ted “Smitty” Smith.
New Product Overview Homac STORM SAFE™ Connector Systems Presented by: Presented by: Roy Jazowski - Director of R&D Mark Hammer – Director of Marketing.
EET Survey of Electronics
Service Calculations One and Two Family And Multi- Family Paul Revere Chapter May Meeting.
Electrical Power Systems
Electrical Machines LSEGG216A 9080V. Transformer.
Master Examination Practice Drill # (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.
Electric Load Estimating 2011 SWEDE Conference. Customer’s Connected Load & Electric Utility’s Demand Load Customers provide the utility company with.
ELECTRICAL INSTALLATION PLANNING
CITY OF LAKE WORTH, FLORIDA UTILITIES DEPARTMENT A Look at our Electric Utility A Plan For The Future.
ENERGY CONSERVATION BUILDING CODE – 2006 PRESENTATION BY VP GUPTA PRINCIPAL CHIEF ENGINEER (ELECTRICAL), BSNL CHENNAI.
Incident Energy Study Christian Brothers University MAESC CONFERENCE Jermichael Beaver, Bruce Luong, David Temple, and John Ventura.
©Ted “Smitty” Smith  This speed drill is designed to help you practice calculations. The slides will transition in three and one half minutes instead.
Contributions In-Aid and Development of Fees Utility Financial Solutions Mark Beauchamp, CPA, CMA, MBA President
Tubas ELECTRICAL NETWORK STUDY Prepared by : Omar Abu-Omar Ahmad Nerat Sameed banifadel PRESENTATION TO: Dr.MAHER KHAMASH.
Antenna Electrical Infrastructure Selection of OMT Design for the EVLA X-band Receiver Bob Broilo Electrical Engineer.
Electrical Contractor
Two Minute Drill #9 Copyright 2005 Ted "Smitty" Smith.
September 2005Urban Planning Carleton University 1 Zoning By-Laws & Land Subdivision Official plan of a city provides the basis for: –Planning public facilities.
COMMERCIAL ELECTRICAL (Chapter 11)
Commercial Load Estimating 1 Richard Gaido, P.E..
Electrical Systems Construction Mr. O.
Cable Rehabilitation Program By Lee Maurer Maintenance Planning SWEDE Conference April 26, Bastrop, Tx (Second Responder Cable Treatment Program)
Copyright 2008 Ted "Smitty" Smith.  Left click on the presentation ICON located at the bottom of the slide directory to the left of the this slide. 
New Service Delivery Presented by Milton Russell.
Two Minute Drill Number 23- Residential Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith.
Oncor Electric Delivery Study on Residential Electric Vehicle Charging SWEDE Conference 2012 Ron Shipman.
Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith Two Minute Drill Number 24- Residential.
Electrical Plans.
Data Center Facility & Services Overview. Data Center Facility.
Copyright 2008 Ted "Smitty" Smith Two Minute Drill Number 21- Residential Improving your skill in code Look Up Increasing Speed Drill.
CABLING SYSTEM PROTECTION. Screening/Shielding  1 In the Signamax Cabling System for the efficient screening of the telecommunications systems, the screen.
Planning The Electrical System  Safe means for the entrance of electrical supply into a building  Means of disconnecting all electrical power in a building.
Retrofitting My Home with Fire Sprinklers Greg Kleinberg, Deputy Chief – Fire Marshal Medford Fire-Rescue.
Planning & Community Development Department Olivewood Village Project (530, 535 E. Union St., 95, 99, 119 N. Madison Ave. and 585 E. Colorado Blvd.) Predevelopment.
ELECTRICAL INSTRUMENTS ( service and utilization )
Community Development Department Ryan’s Landing Planned Unit Development Application No
SUB-STATIONS.
Electricity is produced at the power station.
Advanced Calculations Drill 1 for the 2011 NEC
License Examination Practice Drill
City and Country.
Electrical Wire for House in Chennai
Circuits Electrical Wiring.
Smitty’s Two Minute Drill Mixed Content -05
Theory and Calculations
Presented by: Keith Gray & Julienne Sugarek CenterPoint Energy
Installation And Estimation of Service Connection
Engineering Project Cable Management.
Calculations: Transformers and Service Conductor Calculations
Two Minute Drill: Raceways and Boxes 2017
ELECTRICAL CIRCUITS AND CONSTRUCTIONS An electrical circuit is a network consisting of a closed loop, giving a return path for the current 2.
Instructor: Radian Belu, PhD
EET 323 – Electrical System Design Lecture 1: Introduction to Electrical System Design Radian Belu, PhD.
Objectives Learn about Electricity Pricing Electric systems.
Objectives Finish with Practice circuits problems for
Objectives Finish Transformers Introduce HW5 (Pricing)
ECE 476 POWER SYSTEM ANALYSIS
ST800 Service Tester, 800 Amps.
EET 323 – Electrical System Design Lecture 3: Load Characteristics
Dominion Energy South Carolina: Solar Equipment Requirements
Calculations Review Drill
Calculation Speed Drill Varied-1
Presentation transcript:

Provisioning the Power System for the Porter Farms P.D. By: Marnelli Pascual Christian Brothers University 650 East Parkway S, Memphis TN MAESC CONFERENCE

Overview ●What is Porter Farms P.D.? ●Preliminary Designs ●Loop System ●Specifications ●Calculations ●Cost Analysis ●Project Summary

Porter Farms P.D. Consists of 2 Areas Consists of 2 Areas –Area 1, Subdivision with 69 lots –Area 2, Apartments with 52 units, plus 1 clubhouse Located in Collierville, TN Located in Collierville, TN

Project Location

Project Stages Stage 1 Stage 1 –Develop Area 2, Apartments Stage 2 Stage 2 –Develop Area 1, Subdivision

Existing Power Sources 1Ø 3Ø

Design 1 – Two UG Loops

BORE UNDER RAILROAD

Design 1 (cont’d) BORE UNDER THE STREET

Design 1 (cont’d) Advantages Advantages –Feeds are from the closest sources –No tree trimming/removal required Problems Encountered Problems Encountered –Railroad approval takes at least 90 days –Minimum railroad crossing fee of $75,000

Design 2 – Two UG Loops

LAKE NEW 1Ø OVERHEAD LINE

Design 2 (cont’d) Problems Encountered Problems Encountered –Crossing fee and approval from Railroad company required –City of Collierville and the homeowner’s association objected to the design –Involves tree trimming/removal

Design 3 One UG Loop

TEMPORARY OVERHEAD LINE UNDERGROUND PRIMARY

Design 3 (cont’d) BORE UNDER THE STREET

Design 3 (cont’d) Advantages Advantages –No railroad fee or approval required –No tree trimming/removal Problem Encountered Problem Encountered –Cost of $10,000 for the temporary electric

UG Single Loop Calculated Loads Calculated Loads –Apartments = 525kVA –Subdivision = 775kVA –Total = 1300kVA MLGW Requirement MLGW Requirement –Maximum load = 1320kVA

UG Electrical Loop

Transformer Isolation DISCONNECT

Specifications Fuse: (2) 100 A Fuse: (2) 100 A Transformers Used (Area 1 & 2) Transformers Used (Area 1 & 2) – (3) 50 kVA – (14) 75 kVA – (1) 100 kVA Cables & Conduits Cables & Conduits –Primary: #2 insulated copper inside 2” pvc conduit –Secondary: 350 kCM triplex inside 3” pvc conduit Meter Sockets (Apartments) Meter Sockets (Apartments) –(12) 6-Gang Meter – (2) 2-Gang Meter – (1) Single Meter

Specifications (cont’d) 6-Gang Meter Socket 6-Gang Meter Socket RISER ENTRY

Specifications (cont’d) Location of Facilities Location of Facilities – Riser Location

Specifications (cont’d) Location of Facilities Location of Facilities – Transformer Location (Apartments)

Specifications (cont’d) Location of Facilities Location of Facilities – Transformer Location (Subdivision)

Calculations Cost: Software-calculated Cost: Software-calculated Fuse: No calculation needed Fuse: No calculation needed Cables & Conduits Cables & Conduits –Size: Software-calculated based on cable length and load –Length: Measured from map

Calculations (cont’d) Cable Tension, ≤ 850 lbs. Cable Tension, ≤ 850 lbs. – Maximum Tension = 831 lbs. – Software-calculated

Calculations (cont’d) Transformer Size (Apartments) Transformer Size (Apartments) Load from Electrician, kWDemand FactorProjected Load, kW Lighting Receptacle Range Dryer Air Conditioning Total Load per Unit Total Load per Unit=  (Load from Electrician)(Demand Factor) Equation 1

Calculations (cont’d) Transformer Size (Apartments) Transformer Size (Apartments) Transformer Load=(Total Load per Unit)(No. of Unit)(Demand Factor) Equation 2 No. of BuildingsNo. of Units Demand Factor Transformer Load Transformer Size to Use kVA kVA Calculated Total Load per Unit = kVA

Calculations (cont’d) Transformer Size (Subdivision) Transformer Size (Subdivision) Number of LotsLoad Based on Sq. Ft., kVATransformer Size kVA kVA House Square Footage: 2500 sq. ft.

Project Cost SubdivisionApartments Total Cost$109,881.08$65, Cost per Lot/Unit $1,592.48$1, Average Cost per Lot/Unit $1,594.00$679.00

Apartments Cost TransformerSecondary Cable Primary Cable QuantityCost, $Length, ft.Cost, $ Project C Project C

Apartments Cost (cont’d) TransformerSecondary Cable Primary Cable QuantityCost, $Length, ft.Cost, $ Project C Project C

Project Summary –All requirements were met –MLGW and the customer approved the final design –Project is currently under construction

Questions