THE ROLE OF A CONSULTING FIRM COLLECTING FISH MIGRATION DATA ON THE SNAKE AND COLUMBIA RIVERS COL (RET) CURT THALKEN SENIOR VICE PRESIDENT.

Slides:



Advertisements
Similar presentations
McNary Dam The Dalles DamBonneville Dam John Day Dam Evaluate Spawning of Fall Chinook and Chum Salmon Below the Four Lower-most Columbia River Mainstem.
Advertisements

Smolt Monitoring Program 1982-Present BPA project#
Survival Estimates for the Passage of Juvenile Salmonids Through Dams and Reservoirs of the Lower Snake and Columbia Rivers (Project ) CBFWA March.
Implement Wy-Kan-Ush-Mi Wa-Kish- Wit Watershed Assessment and Restoration Plan Now A Regional Support Program Sponsored by the Columbia River Inter-Tribal.
ISO Adult PIT Interrogation System Installations BPA Project Number July
Salmonid Population and Habitat Monitoring in the Lower Columbia/Columbia Estuary Provinces Oregon Department of Fish and Wildlife.
ABOUT NORMANDEAU ASSOCIATES COMPANY OVERVIEW. ABOUT NORMANDEAU ASSOCIATES Over 40 years of experience in environmental consulting One of the largest,
Overview of Current Production Programs Across the Columbia River Basin.
NWHA- Panel Discussion “Spawning Better Ideas for Fish Passage”
Careers in Wildlife Management WORKING ON THE WILD SIDE.
Evolutionarily Significant Units and the U.S. Endangered Species Act Michael J Ford Northwest Fisheries Science Center Seattle, Washington.
TRIBAL DATA NETWORK COLUMBIA RIVER INTER-TRIBAL FISH COMMISSION.
C. A. Peery, M. L. Keefer, and S. R. Lee Idaho Cooperative Fish and Wildlife Research Unit U.S. Geological Survey and Northwest Fisheries Science Center.
Assessing the use of PIT Tags as a Tool to Monitor Adult Chinook Salmon Returns to Idaho John Cassinelli Regional Fisheries Biologist Idaho Department.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Deployment and Testing of the Alden Fish-Friendly Turbine by EPRI, Alden Research.
Coordination of Tag and Mark Recovery Programs Dan Rawding WDFW.
April Runoff Forecasts for the Columbia Basin and Power Supply Implications Jim Ruff and John Fazio Council Meeting April 14, 2010 Boise, ID.
1 Columbia River Salmon Opportunities for Success Presentation to the Pacific Northwest Waterways Association by the Columbia River Inter-Tribal Fish Commission.
OverviewOverview – Preparation – Day in the Life – Earnings – Employment – Career Path Forecast – ResourcesPreparationDay in the LifeEarningsEmploymentCareer.
Federal Columbia River Power System Operations Planning.
COLUMBIA RIVER SALMON AND STEELHEAD RETURNS FPAC and TMT – March 2013 Presented by: Washington Department of Fish and Wildlife.
COLUMBIA RIVER SYSTEM OVERVIEW
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N McNary Dworshak Anderson Ranch Palisades Ice Harbor Grand Coulee Revelstroke Lower Monumental.
Pacific Fishery Management Council Jurisdiction –3 miles to 200 miles –4 states (includes Idaho) Members -- appointed –State governments –Federal Agencies.
Survival of Migrating Salmonid Smolts in the Snake and Lower Columbia Rivers, 2009 Technical Management TeamDecember 11, 2009 Lessons Learned 2009 Bill.
Hydrosystem Operations and Fish Recovery in the Columbia River Basin U
Salmon and Energy: Do We Have Enough Power to Remove the Dams? by Katherine Hausrath
Documenting O. mykiss life histories in the White Salmon River prior to the reintroduction of anadromous fish above Condit Dam. Brady Allen and Patrick.
ISAB Snake River Spill-Transport Review ISAB – Presentation to Council September 17, 2008.
BUILDING STRONG SM 1 Columbia River Salmon and Federal Columbia River Power System Rock Peters Senior Program Manager.
Following is a list of locations that project sponsors indicated their data would be published to for the BPA categorical review process.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Page 1 Smart grid in the Pacific Northwest – best practices from the largest demo project in.
Bureau of Reclamation Pacific Northwest Region Partnerships.
Smolt Monitoring Program: Overview and Data Collection (SMP Traps) Brandon R. Chockley SMP Pre-Season Meeting Feb. 11,
BUILDING STRONG ® PORTLAND DISTRICT 1. BUILDING STRONG ® PORTLAND DISTRICT 2 BiOp Performance Standards for Dam Passage Survival RPA RM&E Actions - Strategy.
Estimating the Age and Origin of Spring/Summer Chinook Salmon at Lower Granite Dam Christian Smith USFWS Abernathy Lab, Longview, WA Jody White Quantitative.
RMIS Overview & Infomap Service PSMFC Regional Mark Processing Center (RMPC) Overview of RMPC & CWT Database Since 1977 the RMPC has provided essential.
Columbia River Basin Dams FCRPS--29 federal dams (USACE and BOR) Hydropower (50-65% of the region’s needs) Flood control Irrigation Recreation Navigation.
Zack Larson and Associates. Dual-frequency Identification Sonar (DIDSON) is promising new technology for enumerating anadromous fish in rivers. DIDSON.
Mass Marking and Electronic Recovery of CWTs In the Pacific Northwest Ron Olson Northwest Indian Fisheries Commission Olympia Washington.
REGIONAL COORDINATION High Level Indicators Draft “white paper” to recommend a core set indicators that can be shared among all types of monitoring Protocol.
The Columbia River Basin Where we’ve been. Where we’re going. October 18, 2005.
Fiscal Year 2004 April 10, FY 2002FY 2003FY 2004 EnactedBudgetBudget COLUMBIA RIVER BASIN: Army Corps of Engineers Bureau of Land.
BUILDING STRONG SM Partnering and Coordination to Accomplish the Navigation Mission.
FCRPS Adaptive Management Implementation Plan (AMIP) 1 September 15, 2009.
Smolt Monitoring Program: Overview and Data Collection Brandon R. Chockley SMP Pre-Season Meeting February 20,
Oregon State University Real Time Research, Inc. USGS-Oregon Cooperative Fish & Wildlife Research Unit Pre-Management Status of Caspian Tern Colonies in.
4/24/2017 Juvenile Salmon Ecology in the Lower Columbia River and Estuary: Tidal Freshwater Research Presented by Nichole K. Sather Northwest Power &
Downstream Survival of Juvenile Stream Type Chinook Salmon and Steelhead Through the Snake/Columbia River Hydropower System and Adult Return Rates AFEP.
Status & Trend Monitoring Data End User Management Questions, Directives, Research & Monitoring Plans and Other Strategies 1.Federal Columbia River Estuary,
Integrated Status and Trends Monitoring Demonstration Project Pacific Northwest Aquatic Monitoring Partnership Bernadette Graham Hudson, Lower Columbia.
Development of Bolt-on Low Profile Overflow / Orifice PIT Tag Antennas for John Day Dam Adult Ladders PTAGIS Field Office Kennewick, Washington November.
Findings of Congress The Endangered Species Act is the last resort for species at risk of extinction. Under the ESA, the National Marine Fisheries Service.
Estuary Actions for Salmon and Steelhead Columbia River Estuary Science Policy Exchange September 10-11, 2009 NOAA 2008 FCRPS Biological Opinion Estuary.
Species Main focus for NMFS is ESA listed salmonids, Main focus for NMFS is ESA listed salmonids, Equal focus for NMFS is to protect essential fish habitat.
Columbia River Basin Fish Restoration Activities ACCOMPLISHMENTS TO DATE AND UPCOMING ISSUES Bonneville Legal Briefing – October 2015.
Northwest Power Planning Council Fish and Energy Impacts Resulting from Reductions in Summer Bypass Spill July 16, 2003.
Performance of a New Steelhead Line Derived from Hatchery Parents Collected in Autumn in the Grande Ronde River Lance Clarke, Michael Flesher, Shelby Warren,
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Slide 1 FEDERAL ENVIRONMENTAL SYMPOSIUM (West) – 6/3/09 Implementing Energy Efficiency in Remote.
Northwest Fisheries Science Center Technical Management Team
Pacific Northwest Salmon Migration and the Relationship with Hydroelectric Dams Matt Jordan CE 394 GIS and Water Resources.
Comparative Survival Study Annual Meeting
Comparative Survival Study Project #
Northwest Fisheries Science Center Technical Management Team
Steelhead status in Idaho – 2012 Update
2017 TMT Year-end Review December 12, 2017 Brandon R. Chockley
Direct Survival of Migrating Salmonid Smolts in the Snake and Lower Columbia Rivers: Update with 2007 Results Northwest Power and Conservation Council.
NOAA Mainstem PIT Tag Research
Adult PIT-tag Interrogation System Wells Hydroelectric Project (System Design, Installation and Evaluation)     Shane Bickford* Public Utility District.
Modifications to TDG Monitoring and Tracking
Presentation transcript:

THE ROLE OF A CONSULTING FIRM COLLECTING FISH MIGRATION DATA ON THE SNAKE AND COLUMBIA RIVERS COL (RET) CURT THALKEN SENIOR VICE PRESIDENT

ABOUT NORMANDEAU ASSOCIATES Over 40 years of experience in environmental consulting One of the largest, most well-known natural resources management companies in the U.S. (EBJ) Recognized ability to tackle large, complex projects 250 employees in 13 states Technical Disciplines –Marine Sciences –Fisheries and Aquatics –Terrestrial / Wetlands / Wildlife –Water Resources –Hydrology and Geology –Biological Laboratories and Field Equipment –Public Involvement Employee owned since 2000! We qualify as a small business under Federal NAICS code Research and Development in the Physical, Engineering, and Life Sciences. Other NAICS codes include: Environmental Consulting Services and Other Scientific & Technical Consulting Services.

PORTS & WATERWAYS FIELD SERVICES Sediment / Dredge Materials Characterization Studies –Sediment coring and grab sampling –Acoustic Doppler Current Profiler (ADCP) –Side Scan Sonar –Sediment Profiling –Bathymetry Collection and Characterization of Marine Species –Benthic macro invertebrates, Shellfish, Ichthyoplankton, Phytoplankton, Zooplankton and Aquatic Plants Remote Methods –Hydroacoustics –Sediment Profile Cameras –Video Characterizations –Dive Surveys

FISHERIES AND AQUATICS Active Hydroacoustics –Natural resources management –Hydropower –Coastal nuclear and fossil fuel energy –Offshore renewable energy –Ports, waterways, coastal development Technologies include –DIDSON –Single-beam, multi beam echosounders –Side scan sonar –Acoustic Doppler Current Profiler (ADCP) –Acoustic Telemetry Patented Technology –Hi-Z Turb’N Tag ®

ADULT FISH COUNTING CONTRACT Why a Private Sector Small Business? In 2011, USACE initiated a market research survey. This includes issuing a “Sources Sought” requesting qualified businesses to notify USACE of their ability to accomplish the work. In accordance with federal regulations, should two or more small businesses respond to a federal agency’s request for sources sought, and these businesses adequately demonstrate they are capable of performing the work, that federal agency is required to set the procurement aside for only small businesses. Normandeau was one of a group of firms that responded to the sources sought— requiring the next contract to be competed among qualified small businesses. As the result of a competitive small business process, USACE awarded the adult fish counting services contract for the Snake and Columbia Rivers to Normandeau Associates Inc. on November 8, 2012.

SCOPE OF SERVICES Furnishing accurate counts of adult fish passing though 14 fish ladders at 8 Corps projects. Government-furnished computer system is used to tally each fish. Nine species of fish are counted, including Chinook, coho, sockeye, pink, and chum salmon; steelhead; bull trout; American shad; and Pacific lamprey. Chinook and coho are also counted as either adults or jacks, based on length. Wild and hatchery steelhead must be distinguished through the presence/absence of an adipose fin. Fish tags/marks, injuries, and signs of gas bubble trauma are noted.

FISH COUNTING LOCATIONS Bonneville Dam (Visual and Video Counts) Bradford Island Fish Ladder Washington Shore Ladder The Dalles Dam (Visual and Video Counts) East Fish Ladder North Fish Ladder John Day Dam (Visual and Video Counts) South Fish Ladder North Fish Ladder McNary Dam (Visual and Video Counts) Oregon Shore Fish Ladder Washington Shore Fish Ladder Ice Harbor Dam (Visual and Video Counts) South Shore Fish Ladder North Shore Fish Ladder Lower Monumental Dam (Visual Counts Only) South Shore Fish Ladder North Shore Fish Ladder Little Goose Dam South Shore Fish Ladder (Visual Counts Only) Lower Granite Dam South Shore Fish Ladder (Visual and Video Counts)

FISH COUNTING SCHEDULE Real time fish counting –All projects, April 1 – October 31 –50 minutes/hour, 16 hrs/day (5 am – 9 pm) Video fish counting –Night counts annually at selected projects  June 15 – Sept 30 (9 pm -5 am) –Winter counts annually at selected projects  Nov 1 – Mar 31 (5 am -9 pm)

FISH COUNTING Staff of 50 counters with experience ranging from several months to 35 seasons Ongoing training for new and experienced counters as the season progresses and fish passage conditions change Quality Assurance program dictates that each counter is tested by a supervisor on a monthly basis

SEE WHAT THE BONNEVILLE COUNTERS SEE

FISH COUNTING DATA Fish have been counted at Bonneville since 1938 and at other federal hydroelectric projects since they were completed. Both the NOAA Fisheries BiOp and the Northwest Power Planning Council (NPPC) Fish and Wildlife Program establish regional processes for fish passage management. Counting schedules, which fish species are counted, how counts are reported, and expansion or estimation methods are overseen by the Fish Passage and Operations Management (FPOM) committee (comprised of NOAA, CRITFC, ODFW, WDFW, IDFG, BPA, and Corps of Engineers biologists). Normandeau staff enter fish data directly into a regional database maintained by the Corps of Engineers Fisheries Field Office at Bonneville Dam and available at:

EXAMPLE OF FISH COUNT DATA

NORMANDEAU OFFICE LOCATIONS QUESTIONS?