May 2010 1 SG Communications Overview Matt Gillmore 02/27/2012.

Slides:



Advertisements
Similar presentations
Impact of Smart Grid, ICT on Environment and Climate Change David Su Advanced Network Technologies National Institute of Standards and Technology ITU Symposium.
Advertisements

SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example Kay Stefferud Chair, SG-Systems Use Cases For more information visit:
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
SG Communications Boot Camp November 19th, Agenda 3:30 – 3:40 – Welcome and Introductions 3:40 – 4:00 – Review scope and charter of SG Communications.
UCAIug HAN SRS v2.0 Summary August 12, Scope of HAN SRS in the NIST conceptual model.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 03/07/11.
OpenHAN Boot Camp July 19, OpenHAN TF Overview Chair Erich W. Gunther, EnerNex – Co-chair Mary Zientara, Reliant Energy -
Draft February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task.
Submission May 2010 Don Sturek, PG&ESlide 1 Submission Title: [OpenSG Washington DC Opening Report] Date Submitted: [May 4th, 2010] Source: [Don Sturek]
Knoxville, TN October 20, 2009 OpenADE Status and Plans Dave Mollerstuen
OpenFMB Specification Development Plan
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC Closing Report– January 2012 Date: 19 January 2012 Discussion topics.
Business Technology Solutions B usiness T echnology S olutions Smart Grid Program Consumers Energy’s focus on Using and Enhancing Industry Standards.
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– January 2012 Date: 18 Janaury 2012 Discussion topics during November.
The NIST Smart Grid Interoperability Framework and the Role of CIM Jerry FitzPatrick National Institute of Standards and Technology CIM Users Group Meeting.
1 ISO/RTO Council Wholesale Demand Response Projects & OpenADR David Forfia.
1 Accelerating Standards for the Smart Grid David Wollman National Institute of Standards and Technology
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): David Su Steve Whitesell.
Parent Session #1 Thursday, March 5th, Parent Session #1 Thursday, March 5, 2015.
Jerry FitzPatrick, NIST Chair Wednesday, May 26. Introduction - IKB PAP8 PAP14 DEWG Charter What should the T&D DEWG be doing? T&D DEWG or T and D DEWGs?
1 Connectivity Week 2010 How Can Standards Be Regulated? Thursday May 27 10:30AM-Noon Zahra Makoui.
IEEE 802 Smart Grid Adhoc. SGIP SGIP formed in 2009 by NIST – Provide support to meet requirements of Energy Independence and Security Act of 2007 (EISA)
SGTCC END TO END TESTING INITIATIVE APEC-ISGAN Smart Grid Test Bed Network Workshop Washington, DC -- January 24, 2012 Rik Drummond, Dean Prochaska, Rudi.
Introduction & Overview April 11, 2011 Barry Haaser Managing Director.
PAP 10 UCAIug OpenSG Customer Domain Involvement.
Update on the NIST Smart Grid Standardization Efforts Nada Golmie National Institute of Standards and Technology November 16, 2009.
Common Information Model and EPRI Smart Grid Research
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– March 2012 Date: 18 March 2012 Discussion topics during March Waikoloa.
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): David Su Steve Whitesell.
SG Communications Sessions Tuesday, October 20th, 2009.
Doc.: IEEE /0047r1 Submission SGIP Liaison Report to IEEE Following the SGIP (2.0) Inaugural Conference Nov 5-7, 2013 Date:
OpenSG - SG Communications May 2010 Slide 1 SG Communications DC Meeting AM2 Session Tuesday 5/4/2010 Network Interoperability.
OpenSG Closing Plenary Oct 22 nd, Agenda SG Conformity SG Communications SG Systems SG Security Feedback Next Meeting.
OpenSG Closing Plenary Knoxville February, UCAIug IPR Policy UCAIug Public or Private Documents may or may not contain the information included.
Demand Response Use Case & Functional Requirements Development UCAIug Meeting Jan 6, 2009 Mark van den Broek.
OpenSG Status UCAIug Members Meeting Chris Knudsen – Chair Gary Stuebing – Vice-Chair November 9 th, 2009.
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
Geneva, Switzerland, April 2012 Introduction to session 7 - “Advancing e-health standards: Roles and responsibilities of stakeholders” ​ Marco Carugi.
SMART GRID INTEROPERABILITY PANEL PRIORITY ACTION PLAN 2 WIRELESS COMMUNICATIONS DEC 6, :00 AM MOUNTAIN FACE-TO-FACE PHOENIX, AZ ROOM 162 WEBINAR.
Doc.: IEEE /1542r0 Submission November 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC– November 2011 Date: 08 November 2011 Discussion topics.
1 May 2010 SG Network TF Overview & Deliverables Ron Cunningham (vice-chair) Presented to SGAC AWP 11Jul2012.
1 SGIP PAP 11 PEV V2G DEWG Dec 2-3, 2010 Grid InterOp 2010 Eric Simmon, NIST Jerry Melcher, EnerNex SGIP PAP 11 PEV V2G DEWG Grid InterOp 2010 Meeting.
RPL Applicability Statement for AMI IETF #81, IETF ROLL WG Québec City, Canada July 25-29, 2011 Jorjeta Jetcheva
Doc.: IEEE /0028r1 Submission January 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid Update – January 2011 Date: 2011-January-10 Abstract: NIST.
Open AMI Network 10/22/08.
Submission February 2010 Don Sturek, PG&ESlide 1 Submission Title: [OpenSG San Francisco Opening Report] Date Submitted: [February 1st, 2010] Source: [Don.
SG-Systems Working Group Status: Active, meet once at each face-to-face meeting Charter: The SG-Systems Working Group defines requirements, policies, and.
Advanced Metering Implementation Team (AMIT) Update to RMS Presented by Christine Wright September 21, 2011
Summary of SGIP PAP Activities since October 2011 Mingxi Fan TR-45.5 Liaison to SGIP PAP December 5 th, 2011 ©2011.
Open Smart Grid (OpenSG) Technical Committee Plenary October 20, 2009.
12/10/2016 Smart Grid Requirements for IEEE M2M Network IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16ppc-10/0042.
DOCUMENT #:GSC15-PLEN-52 FOR:Presentation SOURCE:ATIS AGENDA ITEM:PLEN 6.11 CONTACT(S):Maria Estefania ATIS and.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Jeju, 13 – 16 May 2013Standards for Shared ICT Telecommunications Standards for Smart Grids David Su National Institute of Standards and Technology Document.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 11/1/2010.
Demand Response Use Case & Functional Requirements Development UCAIug Meeting Jan 6, 2009 Mark van den Broek.
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): Smart Grid Standardization Activities TIA TR-45.5 Input Smart.
February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task Force Re:
HIS Smart Grid – Summary (1)
NIST PAP Assignments to CIM User Group and/or IEC TC57
Smart Grid SC– January – NIST PAP2 Name Company Address Phone
OpenADR SRS Draft 1 Review
Smart Grid Closing Report – November 2010
Smart Grid ad hoc Closing Report - March 2010
Smart Grid ad hoc Closing Report - May 2010
doc.: IEEE <doc#>
Smart Grid Update – January 2011
SG Communications Boot Camp
SG Communications Sessions
Telecommunications Standards for Smart Grids
Presentation transcript:

May SG Communications Overview Matt Gillmore 02/27/2012

SG Boot Camp Agenda SG Communications structure within UCAiug Overview of this weeks meeting schedule Overview of SG-Network Walkthrough of SG-Networks work – Requirements – Architecture reference diagram – System Requirements Specification overview

Open SG Organization

SG Communications Agenda Feb 27thMon 2-4SG Comm Boot Camp Feb 28thTues 10:30-noonSG Comm Feb 28thTues 1-3pmSG Network SRS Working Session Feb 28thTues 3:30-4:30pm SG Network / SG Simulations Feb 29thWed 8-10amSG Network SRS Working Session Feb 29thWed 10:30-noonSG Network SRS Working Session Feb 29thWed 1-3pm PAP2 Model Area Characteristics by density category: terrain, foliage, endpoint densities March 1 st Thur 8-10am SRS or more Model Area work e.g. finalizing the assessment profile and scaling the payloads, payloads splits baseload March 1 st tThur 10:30-noon SG Network / PAP2 Model Issues: Payload aggregation and lose of payload volumetrics especially on latency.

SG-Network Overview Previously started as AMI-Network with a focus on network management. Scope and Charter for SG-Network within UCAiug – NIST PAP 2 (Wireless standards for the Smart Grid) Supply functional requirements for Smart Grid Networks from a utility perspective Define functional domains within the Smart Grid – Create a System Requirements Specification Provide information to SDO’s (e.g., IEEE P2030) Participation – Utilities, Academia, Vendors

SG-Network Overview Continued Deliverables – Communications Requirements Latency, How Often, Payload size, etc – Database for using the requirements – System Requirements Specification Pulls all of the work together – Reference Architecture Diagram

SG-Network Output Progress to date: – System Requirements Specification V5 complete Key stats: 19 payload-groupings (usecases) 204 payloads 500 payload-parent-sets 7877 requirement rows (including parents and 2 rows flagged for deletion) – Database matches requirements capture from SRS V5

Examples of work accomplished to date Sample Actors – Smart Meter – Load Management System (LMS) Sample Requirement for a Smart Meter Use CaseRequirementHow OftenReliabilityLatency Meter reading Smart Meter shall be able send on demand read information 1 transaction per meter on demand > 98%< 5s Meter reading Smart Meter shall be able to report on demand read communication failure 1 transaction per meter on demand > 98%< 5s Meter reading Residential Electric Smart Meter shall be able to report when scheduled All meters report 4-6 times per day > 98%< 4hr

NIST Conceptual Model

Reference Architecture from NISTIR

P2030 Smart Grid Comms Reference Architecture

SG-Networks Reference Architecture

Deliverables Interim Release 1.0 was published in December 2009 – Requirements and some volumetric and latency requirements Interim Release 2.0 was published in February 2010 – Requirements, volumetric, latency requirements, security, implications and more use cases – Reference Architecture Diagram first published – System requirements specification published Interim Release 3.0 was published in May 2010 – Addition of the following use cases: Pre-Payment, Meter Events, DA and Outage Management – System requirements specification updates Interim Release 4.0 was published in June 2010 – Addition of the following use cases: DRLC, DA fault isolation and reconfiguration – System requirements specification re-write Interim Release 5.0 was published in October 2011

Work Plan for the week System requirements Specification working sessions Review Plan scope of the next interim release NIST SGIP Priority Action Plan 2 joint meeting Thursday

Questions?