1 Open AMI Network 10/22/08

2 Data Collection Systems
Standards Overview AMI-SEC Utility Systems Meter-Specific Networks Data Collection Systems HAN Wide Area Networks MDM System Network Operations OMS Data Collection MDM Or MDUS Open HAN 1.0 GIS Planning & Scheduling Control & Configuration MDM AMI Network ??? WMS Load Mgmt. Load Control MDUS Meter Data & Comm. C12.19 C12.22 CIS Meter Maintenance AMI-SEC

3 Consumers Energy’s Service Territory
1.8 Million Electric Meters 1.6 Million Gas Meters 1 Million gas meters in non Consumers Energy’s service territory

4 AMI – Observations Differences between systems
Proprietary Communication Technology System logging and auditing Device registration – device dependant Collector Meter Substation metering Other (smart grid devices, etc) Network management interfaces Outage reporting Troubleshooting Monitoring performance System configuration and upgrades

5 AMI – Observations (Cont.)
AMI communication vendors are not interoperable for maintenance and management Meter Collector/Access Point/Mesh Gate/Take out point/Cell Relay/Tower Gateway Base Station/ Base Station HAN ESP interface managed and implemented different between vendors

6 AMI-Network TF Proposal
Define the devices and well defined points of interoperability within the AMI network for maintenance Define the benefits of interoperability between AMI network maintenance components to utilities Sharing backhauls Gas AMR meters Water AMR meters Hybrid AMI systems Point to Point and mesh and PLC

7 Proposed TF Scope Evaluate existing Maintenance Use Cases
Define New Maintenance Use Cases Define System Functional Requirements for AMI meters to the AMI head end for maintenance/lifecycle purposes Identify areas within an AMI network that are viable for maintenance interoperability Scope is outside of OpenHAN and the Zigbee/Homeplug efforts Input from the Group???

8 Evaluate Existing Use Cases
SCE use cases S1 AMI system recovers after power outage, communications or equipment failure U1 Utility installs, provisions and configures AMI system U2 Utility manages end-to-end life-cycle of the meter system U3 Utility upgrades AMI system to address future requirements Other Utility use cases AMI Vendor use cases

9 Define New Use Cases Focus on maintenance life cycle related activities for the meter thru the head end system Avoid HAN use cases with the exception of the AMI Communication interface with the ESP IP/3rd party gateways

10 Functional Requirements
Create a SRS (system requirements specification) similar to OpenHAN’s efforts Derive requirements from the use case review Focus on the AMI head end to the meter from a network maintenance perspective Input from the group???

11 Schedule Questions/Comments? Next Steps?
Meet via teleconference every 3 weeks Meet at every UCA face to face meeting Questions/Comments? Next Steps?