Managing Emissions to New Standards Using PI Dave Nunn, Process Engineer RWE Power International.

Slides:



Advertisements
Similar presentations
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Using PI for Reporting Regional Seminar Series Skye Blair and Alan.
Advertisements

CEMTEK CEMS Users Group Meeting and Forum September 24-25, 2009 Santa Ana, California RKI Specific DAHS Training and RECLAIM Updates Presented by Norm Iseri, RKI Engineering.
In-house Air Monitoring at IPPC Facilities – An Operator’s Perspective Simon Barry (Manager, Thermal Performance) John Gilmartin (Lead Technologist) ESB.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. CCGT Plant Optimisation using Real Time Data Regional Seminar Series.
Cornerstone Base Station for Calibration Management Applied System Technologies, Inc N.W. 53rd Street, Suite 101 Fort Lauderdale, Florida
© 2009 OSIsoft, Inc. – Company Confidential 1 Empowering Business in Real Time Regional Seminar Series Presents: Jonathan Procopio, Project Engineer,
Comments on the Quality Assurance Standard EN14181 VGB Working Group Emissions Monitoring.
XProtect® Expert 2013 Product presentation
Sixth Edition 1 M a n a g e m e n t I n f o r m a t i o n S y s t e m s M a n a g I n g I n f o r m a t i o n T e c h n o l o g y i n t h e E – B u s i.
PI Statistical Quality Control before Pinpoint process upsets before they become product quality problems!
Cornerstone Cal Station for Calibration Management Applied System Technologies, Inc N.W. 53rd Street, Suite 101 Fort Lauderdale, Florida
10 Quality Control CHAPTER
Hands-On Microsoft Windows Server 2003 Networking Chapter 7 Windows Internet Naming Service.
Axis Intelligent Video Intelligence where you need it.
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill Technology Education Copyright © 2006 by The McGraw-Hill Companies,
Integrating flow measurement into ABB CEMS Steve Donnelly - March 2013.
1 Role of Information Technology in Water and Wastewater Management From Water Quality, Performance & Technical Information Management to Finance and Asset.
1 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Integrating Disparate Platforms for Consistent Analysis and Batch.
Air Quality Data Analysis Using Open Source Tools
1 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Reaching across boundaries, collaboration, Web Parts, and Notifications.
Brooklyn Navy Yard Cogeneration Partners
Waters Corporation Connecting Data to Decisions John Swallow Principal Engineer Waters Data Products
Operational Excellence at Roche: PI Delivers Robert Fretz F. Hoffmann-La Roche Ltd. Basel, Switzerland.
ADDED VALUE APPLICATIONS ~ ENABLED THROUGH PI Jerry Weber, Thermal Performance Specialist Frank Borth, Performance & Data Engineer Wayne Benedeck, Thermal.
Computers Are Your Future Tenth Edition Chapter 12: Databases & Information Systems Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall1.
Fleet Performance and Reliability in Generation Utilities
2 © 2005 OSIsoft, Inc. – Company Confidential Paul Ireland Manager – Information Engineering, RWE npower Technology Services P I.
18/09/2015 Technical and Marketing Resources Ltd.1 CEMSuite Plus Emissions Data logging and presentation software.
1 © 2008 OSIsoft, Inc. | Company Confidential Edison Mission Energy: PI for the Next Generation (of Generation) OSI Regional User Conference 10/09/08 Jerry.
Applying PI in the Chemical Industry
5-1 Business Statistics: A Decision-Making Approach 8 th Edition Chapter 5 Discrete Probability Distributions.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. The Use of PI at International Power Regional Seminar Series Lee.
Web GIS Commander Technical Presentation. Copyright (C) MCS 2013, All rights reserved. 2 MCS Web GIS Commander is Web-based GIS (Geographical.
PI Trickles Down At the Water District Emile Richard Portland Water District Portland, Maine.
Yokogawa Electric Corporation Copyright © Yokogawa Electric Corporation Release 2.10 Functionality Overview September 2004.
Sigmafine 4.0 – The Next Generation ( UC2003 Ales Soudek) Sigmafine 4.0 The Next Generation Ales SoudekMay 2003.
I Information Systems Technology Ross Malaga 4 "Part I Understanding Information Systems Technology" Copyright © 2005 Prentice Hall, Inc. 4-1 DATABASE.
RtPM for Asset and Environmental Monitoring Dave Wilson - National Grid Paul Verey - Capula.
Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for.
Introduction to RtReports – Tony Fenn & Chris Nelson Introduction to RtReports Chris Nelson - Senior Developer Tony Fenn - Product Manager.
Copyright © Yokogawa Electric Corporation Release 2.10 Functionality Overview September 2004.
Touchstone Automation’s DART ™ (Data Analysis and Reporting Tool)
Legislation in the EU and the impact on existing plant Lesley Sloss FRSC FIEnvSci Principal Environmental Consultant
Yokogawa Global MES Solution Centre (GMSC)
Copyright © 2007 OSIsoft, Inc. All rights reserved. Ad-Hoc Reporting Using The RtReports Web Part Tamara Carbaugh RtReports Product Manager OSIsoft, Inc.
Hardware Analyser vs Software Analyser
Virtual Analyser What is it Have you ever faced an analyser failure that requires a plant shut down to repair & wished that there.
EEB5213 / EAB4233 Plant Process Control Systems Digital Implementation of PID Controller.
Workshop of St Petersburg - 27 th October 2009 Expert sub-group on Emerging Technologies/Techniques EGTEI - Emerging technologies/ techniques for LCPs.
DataLink for the Office 2007 Platform Jason King OSIsoft, Inc.
New Product Developments World Leaders in Combustion Management Solutions C.E.M.S., MCERTs & E.P.A. Exhaust Gas Analysers C.E.M.S., MCERTs.
New Product Developments World Leaders in Combustion Management Solutions C.E.M.S., MCERTs & E.P.A. Exhaust Gas Analysers C.E.M.S., MCERTs.
1 © 2005 OSIsoft, Inc. – Company Confidential A Generation Ahead OIS.
2 © 2005 OSIsoft, Inc. – Company Confidential PI Utilization: Strategies for Leveraging Existing Technologies in Refining.
REPORTING SOFTWARE for BUILDING & INDUSTRIAL AUTOMATION.
Chapter 2 Excel Fundamentals Logical IF (Decision) Statements Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Oracle eBusiness Financials R12 Oracle Receivables Functional Overview TCS Oracle Practice.
Jump to first page Title V Reporting at Wasatch Energy Systems Bart Baker - System Manager at Wasatch Energy Systems Mike Fishman – EXELE Information Systems,
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Statistics for Business and Economics 8 th Edition Chapter 9 Hypothesis Testing: Single.
FactoryTalk® View Machine Edition
LCPs – Large Combustions Plants – what ist a large combustion plant?  > 50 MW rated thermal input  Irrespective of type of fuel, age and branch  Heat.
People Inc. from P&A Software
Monitoring aspects of permits and inspections (1)
Test Upgrade Name Title Company 9/18/2018 Microsoft SharePoint
Chapter 10 Verification and Validation of Simulation Models
Basic Concepts in Data Management
People Inc. from P&A Software
Training Module Presented by Steve Wright
CAD DESK PRIMAVERA PRESENTATION.
Overview Activities from additional UP disciplines are needed to bring a system into being Implementation Testing Deployment Configuration and change management.
Presentation transcript:

Managing Emissions to New Standards Using PI Dave Nunn, Process Engineer RWE Power International

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 2 Who are we? RWE Power International: brand for services offered by RWE Power (Germany) and RWE npower (UK) RWE npower –Part of the RWE Group of Companies since May 2002 –Leading integrated UK energy company –Core businesses are energy production, retailing, operations and engineering –Own and operate a flexible portfolio of power stations, capable of generating around 10,000MW –UK market leaders in cogeneration and renewable energy production

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 3 Emissions Monitoring Legislation IPPC: Integrated Pollution Prevention and Control –All emissions to air, water and land –Best Available Techniques (BAT) –Application deadline 31 March 2006 for UK Power stations –LCPD is one component

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 4 Emissions Monitoring Legislation LCPD: Large Combustion Plant Directive –EU wide –Applies to all combustion plants >50MWth –Monitoring of SO 2, NOx and Particulates –Emission limits (ELVs) and National Plan (NERP) –Effective from 1 January 2008

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 5 LCPD in the UK A generating unit is a LCP* Plants can choose either ELVs or NERP Required to provide standard reports of SO 2, NOx and Particulate emissions, both concentration and mass release *This approach has been rejected by the EU and is currently being revised to LCP=windshield

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 6 LCPD in the UK Standards provided for installation, testing and monitoring of the CEMs –QAL1: CEM selection (certification) –QAL2: CEM in-situ testing –QAL3: Continuous monitoring of CEM calibration

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 7 MERS Application MERS: Multiple Emissions Reporting System –Modular application for collecting, storing and reporting emissions data –Toolset initially based on LCPD reporting –Excel front-end with Access or SQL server database –Uses PI DataLink to retrieve emission data

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 8 LCPD Calculation Path CEM Sample d data Hourly average 48 - hourly average 40 minutes of data? >= 6 hours of data? >= 3 48h averages? Monthly Statistics Yes Annual Percentile Exclude Data CEM malfunction CEM calibration Monthly Mean Maximum Minimum Std Deviation

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 9 MERS Outputs Monthly statistics –Average, Maximum, Minimum and Standard Deviation Hourly averages 48hr averages Annual percentiles CEM reliability Calibration drift QAL3 charts (CUSUM and Shewart) Mass release (future version)

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 10 Calculation Modules Exclusions –Event types: Calibration, Maintenance, Bad Data –Events generated from PI data (can be edited) –Bad data events: emission tag failure –Other events: generated using formula or signature (calibration only)

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 11 Calculation Modules: Exclusions 1.Zero in tolerance 2.Span in tolerance 3.Transition time within specification 4.Event times: detect edges (or use default times)     Signature event detection 1.Event start: equation False (0)  True (1) 2.Event end: equation True (1)  False (0) Formula event detection Formula: (IF TagBad('03-MLA000.di','*') THEN "Er" ELSE '03-MLA000.di'="On")

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 12 Calculation Modules: Exclusions

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 13 Calculation Modules Concentration –Calculates hourly averages from sampled PI data –Valid period defined by formula (e.g. Load>150MW and FGD in service) –Link to exclusion module to get excluded times –Also calculates: 48 hourly averages Percentiles CEM Reliability

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 14 Calculation Modules: Concentration Valid Period Not Valid Period AVG Discarded Average Averages generated when valid period equation is True (1) –In above case equation: Load>=250MW Values during calibration, maintenance and bad data events excluded Averages less than minimum time length (40 mins) are discarded

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 15 Calculation Modules QAL3 –Calibration times sourced from exclusion module –Can take spot, average, maximum or minimum reading for zero/span within calibration event –Calibration drift calculated using reference value –Calibration drifts can be edited

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 16 Calculation Modules: QAL3 Event Start 19:52:00 Event End 19:57:00 Reading times are calculated from event times –Zero: spot reading at 60 seconds from event start –Span: average reading between 240 and 180 seconds from event end Spot readingAverage reading

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 17 Calculation Modules: QAL3

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 18 Exclusions Sharing Enables Concentration and QAL3 modules to use the events from Exclusions modules Several modules can be dependant on one Exclusions module Minimises amount of collected data and event editing

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 19 Exclusions Sharing Examples Particulates ESI05 Concentration LCPD Concentration QAL3 Exclusions NOxSO 2 Per CEM Exclusions Per CEM QAL3 LCPD Concentration Exclusions Per CEM QAL3 Abated LCPD Concentration (with FGD) Non-Abated LCPD Concentration (no FGD)

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 20 Example Reports: Statutory

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 21 Example Reports: Ad-hoc Chart

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 22 Example Reports: QAL3 Chart

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 23 Technical Challenges Automation of PI DataLink Daylight-saving time Time changes Minimising data collection time Formulas

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 24 Automating PI DataLink Calculate the number of rows required (add extra for time changes) Enter formula as formula array Calculate the cells Excel add-ins have hidden sheet – used for PI DataLink formula

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 25 Daylight-Saving Time Dates/times used throughout system Decision made to use and store all timestamps in standard (not daylight-saving) time Retrieve the time change times from the Windows time-zone settings PI DataLink only retrieves local time, convert all timestamps to standard time For autumn time change need special measures…

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 26 Time Changes Autumn time change: one hour of duplicate (ambiguous) overlapping timestamps PI DataLink retrieval starting/ending in this period returns first occurrence of timestamp Solution: expand data collection to start before and end after the time change – guarantees detection of the actual timestamp during the ambiguous period

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 27 Minimising Data Collection Time Could have a system configured with 300+ tags Collecting this data can take a LONG time Solution –MERS calculation modules request data from a central collection process –Requests are collated and those that overlap with the same tag and sample interval are collected once –Collected data is then distributed back to modules –Has reduced the collection requirement by about 50%

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 28 Formulas System uses PI DataLink expression calculation (PIExpDat) to evaluate formulas Limitations: –Maximum equation length: 255 characters –When using operators (>,,>=,<=) if tag has bad value the equation returns False (0) Solutions: –No solution to length –Created formula builder that adds to equation: tests tags for bad value and forces equation to fail

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 29 MERS Benefits Common solution –Independent of unit or CEM layout –Uses PI as standard interface layer to DCS –Central repository for emission data Scalable –Single module CCGT to multi-unit coal-fired Configurable –‘Unlimited’ emissions –Customised reports

Thanks for your time Any questions?