 over 20 years of experience on the specialized market of relocation of the industrial facilities;  realization of the projects in many countries in.

Slides:



Advertisements
Similar presentations
ABOUT US Bondada Engineering Private Limited (BEPL) is formed by a team of qualified professionals with the motto to serve infrastructure sector, providing.
Advertisements

PRODUCTION PROCESS 40 years EXPERIENCE. - established in headquarter: Sieradz central Poland - central location in Europe The company Chemitex.
Mars-Energo Scientific & Production Enterprise © Mars-Energo, 2012 Instruments for Power Industry.
Your partner for mechanical components!
CORPORATE PRESENTATION. We will r elocate your BUSINESS Strategic objective: To become the leader in Europe in relocating, dismantling, and assembling.
YOU ALWAYS GET WHAT YOU ALWAYS GOT. Roles and Responsibilities Arden Delisle Chief Inspector Al-Pac March 24 th 2014.
DM Copyright © Tekes Digital Product Process.
Demand Response Potential Assessment in Finnish Large-Scale Industry Hannu Pihala Technical Research Centre of Finland (VTT) Demand Response Workshop,
 over 20 years of experience on the specialized market of relocation of the industrial facilities;  realization of the projects in many countries.
Racco industrial consulting working according to investment law to prepare Engineering, Economic, Technology, Environmental Studies for industrial projects.
SE 464: Industrial Information systems Most Images and inform. used in these slides are SAP © Not to be used for other than educational purposes Systems.
PERFIL EN FRIO – Grupo Condesa Perfiles de Precisión, S.L. CORPORATE PRESENTATION June 2012.
Restoration & Recovery Services Manchester Claims Association November 10 th 2011.
LS Engineering Associates Corporation LS Engineering Associates Corporation CORPORATE PORFILE Engineering Services ■ Bridge Inspection ■ Bridge Design.
Guest speaker – Raffi Sossoyan  Licensed Canadian chartered professional accountant and U.S. certified public accountant. – Currently Vice-President,
NAKIMBRO Engineering and Contractors COMPANY PROFILE COMPANY PROFILE.
Energy year 2013 District Heat Wilhelms District heat in Finland year 2013  Heat sales (incl. taxes) 2,31 mrd €  Sold heat energy31,7 TWh.
KALUGAPRIBOR OPEN JOINT-STOCK COMPANY Company History Kalugapribor OAO was established in Initially it manufactured pyrometric.
New business opportunity between Italy and Poland – Poland, 5 June MONTINI Company presentation Poland, 5 th June 2013.
SELECTING THE BEST FOR SUPPLYING FROM WEST. Who we are TRANS ARK GROUP Trans Ark Procurement Design Service Training Offshore Expert Bureau Consulting.
ENERGY EFFICIENCY IN THE INDUSTRIAL SECTOR: PRACTICAL SOLUTIONS.
From Research Prototype to Production
Dagmara Wolska Post Investment Specialist May 26th, 2011.
Sectoral Coverage – Construction and related services Workshop on Scheduling Specific Commitments for Construction and related engineering services and.
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Introduction to CERN and rails consolidation program Handling Engineering Group.
November 14, 2012, Imatra «Staffing and R&D Support for Russian and Finnish Railways Partnership» «Staffing and R&D Support for Russian and Finnish Railways.
Copyright© Underwriters Laboratories Inc. All rights reserved. No portion of this material may be reprinted in any form without the express written.
Countries of Europe France Spain Italy Germany Which country is this?
A An Eastern Partnership Conference An Eastern Partnership Conference 5-6 th December 2011, Kiev 5-6 th December 2011, Kiev.
Cooperation between Russian and foreign companies.
New Delhi, 5-7 February 2007 Monitoring of energy efficiency in Poland of Poland.
Understand production and operations.
Quality, proven over time. JSC «Liskymontazhkonstruktsia» JSC «Liskymontazhkonstruktsia» is one of the largest Russian manufactures and suppliers of pipelines.
 over 20 years of experience on the specialized market of relocation of the industrial facilities;  realization of the projects in many countries.
Federal Resources Center on Training Managers 3 November 2010, Moscow Pavel Mrduljash.
QBC Europe and its facilities. Building purchased – 1 st August 2006 Open for business – 6 th October 2006.
SMART SOLUTIONS TECHNOLOGY. Smart Solutions Technology Company Ltd., it is a private company that was founded in 2010 with the main goal in creating.
Energy year 2014 District Heat.
Development in World Trade and GDP ,volume (Index 1950=100)
Our School, Professions in the automotive industry Nádražní 301, Holice, Czech Republic.
Supervisor services. Project manager Technological group Chief supervisor Supervisors facilities HSE Quality engineer HSE engineer Administrative support.
Wisconsin’s Focus on Energy - Program Update John Nicol, PE Industrial Program Manager.
Through the thorns to the stars! Lucyi Annei Seneca (4 B.C.)
© Siemens A/S 2015siemens.com/answers Siemens Partner Program Automation, Drives, Power, Services.
1 SWECO Consulting and engineering services for industrial customers.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
One trip Hydraulic Whipstock Anchor type
WELCOME TO STAYER GROUP. WELCOME TO STAYER GROUP.
Competence of Human Resources for Iran Nuclear Regulatory Authority
Activities of Lublin Eco-Energy Cluster for development
Global Computer Numerical Controls Market
INSULATION FOR INDUSTRY AND HOUSING
The report on the IBR-2 modernization
FERO INVEST
IEC Inter-Company Education Centre – Škofja Loka
POWER SUPPLIES EQUIPMENT AND SYSTEMS
Index Blickle in Germany, Europe and Worldwide
ASSEMBLY OF GAS BOILERS FOR RUSSIAN MARKET
WELCOME TO THE 2nd EUROHEAT & POWER RTD WORKSHOP „High efficiency – Improved Building Installations and Customer Comfort“ Norela Constantinescu 2/3.
Orica the Kazak experience
Susanne Wacht (THW) Kick-off meeting 18 January 2017 at DG ECHO / ERCC
ADVERS Third largest heater manufacturer in the world
İSKENDERUN VOCATIONAL SCHOOL
Legal and Regulatory Framework for Nuclear Installations in IRAN
Please click on any button below
The EU – Russia business cooperation
Unit 1 Overview – BUSINESS FUNDAMENTALS
A FEW MINUTES TO INTRODUCE OUR COMPANY
Presentation of the Company
Presentation transcript:

 over 20 years of experience on the specialized market of relocation of the industrial facilities;  realization of the projects in many countries in Europe,... from Iceland to Georgia, from Spain to Finland...  service for different sectors: sugar industry, cement industry, construction industry, pulp and paper industry (including the branch of renewing energy;  specialized equipment and tools;  activity in the international environment;  dynamic development.

 qualified and experienced personnel;  specialized equipment and tools,  loggistic support from company head office,  license to execute an installation, erection and structural works in the area of the Russian Federation,  mobile social and workshop containers,  high flexibility of activities  high reputation on the market.

 Dismantling: consists in the dismantle of the large-sized industrial equipment (e.g. mill or boiler) or production line, so that this equipment or line could be assembled and started up in the other place. In dismantling works POL- INOWEX S.A. cooperate closely with the customer and the companies, which will assemble the dismantled facilities. The dismantling services were provided as the first ones by the company.  Assembling: consists in the assembly of the new industrial equipment in prepared buildings, according to the requirements of the customer and technical documentation. The facilities assembled by POL-INOWEX S.A. are subject to technical acceptance by the customer. It concerns industrial facilities, production lines or complete plant.  Relocation: is a complete service, which consists of dismantling, transport and assembling of industrial equipment.

Relocation of wheels production line from Italy to Poland

Relocation of wheels production line

Transport schedule

PHASE I DISMANTLING Ceriano Laghetto (Italy)

Marking and measuring

Dismantling

Loading and transport

PHASE II ASSEMBLING Lublin (Poland)

Cutting and straightening

Folding and welding

Profiling

Cutting the valve hole

Installation

Welding

Control

Complete line

PIERWSZE URUCHOMIENIE

Copyrights reserved