Major Construction Completed

Slides:



Advertisements
Similar presentations
Metrolinx is an agency of the Government of Ontario Planning, Design and Engineering (PDE) Workplan February 20, 2009.
Advertisements

1 ESA Facts Over the past few months, we have reported on the actual and potential loss of schedule contingency (the IEC has reported that their analysis.
East Side Access Outreach
TBITE 05/15/ Heather Sobush, Senior Planner Christopher Cochran, Senior Planner
STATE OF NEW YORK Andrew M. Cuomo Governor New York State DOT Joan McDonald Commissioner Presentation by NYSDOT to the Transportation Border Working Group.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
HUDSON-BERGEN LIGHT RAIL TRANSIT SYSTEM HUDSON-BERGEN LIGHT RAIL TRANSIT SYSTEM Facts and Highlights Facts and Highlights.
APRIL 2014 CPOC LIRR SANDY RESTORATION PROJECTS. Active LIRR Sandy Projects PROJECT EAC Traction Power Substations64.1M Long Beach Branch Systems 56.4M.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
INTERCITY PASSENGER RAIL NORTHEAST UPDATE AASHTO – FEBRUARY 29,
New York Building Congress November 13, 2014 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM.
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
Railway Safety Plan and Its Status in Korea
Jess Albino Facility Advisory October 29, 2007 FACILITY ADVISORY COMMITTEE PLENARY CONVENTIONAL FACILITIES UPDATE October.
Railroad 101 Equipment April 9, Next Generation Corridor Equipment Committee  Established by Section 305 of the Passenger Rail Investment and Improvement.
Rapid Transit System Steering Committee Meeting December 4, 2012.
WORKING IN THE DARK: Citizens Budget Commission October 20, 2009 IMPLEMENTATION OF THE METROPOLITAN TRANSPORTATION AUTHORITY’S CAPITAL PLAN.
Northern Lights Express High Speed Rail: MN APA Conference September 2011.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
Ottawa’s Light Rail Transit Project OLRT Tunnel Geotechnical Update Technical Briefing December 21, 2010 John Jensen Director Rail Implementation Office.
Current Construction Projects Major Projects Pinellas County.
1 Broken Hill Solar Plant Community Information Session 1 July 2015.
May 25, 2010 Wisconsin High Speed Intercity Passenger Rail From vision to reality MADISON COMMUNITY MEETING John Oimoen, High Speed Passenger Rail Program.
MTA Regional Commuter Rail System. Bringing the LIRR to Grand Central Terminal (GCT) - Route Map.
Organization Date Alaskan Way Viaduct & Seawall Replacement Program 4 th Quarter 2009 Progress Report Meeting December 9, 2009.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
September 26, East Side Access Status Report to CPOC September 26, 2011.
Lina Williams Budget & Financial Analyst Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, April 28 th, 2015.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
1 Construction of Salt Waste Processing Facility (SWPF) Charting the Course for Major EM Successes in September 29, 2015 Frank.
South East Fire & Rescue Service Regional Management Board – Achieving Level 3 of the Equality Standard – Update report. Doug Feery 16 th January 2008.
Silver Line Phase 1 – Status Report Status Overall Phase 1 Construction – 99% complete All Station at 98% complete except Wiehle – Reston East at 99% complete.
1 Public hearing on conditional grants and capital expenditure: 3rd quarter Presentation to Select Committee on Finance Northern Cape’s Department of Agriculture.
1 September 26, 2011 Recap The IEC was directed to report their confidence in the project’s mitigation proposed in June. In response, the IEC has evaluated.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Biomass Cogeneration Facility Savannah River Site Aiken, SC
CTA CAPITAL IMPROVEMENT PROGRAM. FY FY 2019 CIP Preliminary Marks.
Planning Commission Study Session: Preferred Plan July 23, 2015.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, May 3 rd, 2016.
Tower 55 Rail Reliever Study Fort Worth City Council Briefing June 8, 2010.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
Expo Line Transit Project Exposition Light Rail Transit Project Expo Board Presentation Monthly Project Status Update October 2, 2008.
Review of 2016–2021 Strategic Budget Plan Development Process and 2016 Budget Assumptions Financial Administration and Audit Committee April 14,
Southeast Rail Extension Update RTD Board of Directors FasTracks Monitoring Committee March 3, 2015.
2015 Annual Program Evaluation (APE) Status Update July 14, 2015.
Open Road Tolling Procurement Update
Stage 2 Light Rail Transit Program “In the ground ready”
Potomac Yard Metrorail Station
Northwest Area Mobility Study FasTracks Monitoring Committee
Light Rail Transit Project
Turning Ideas into Reality Presentation to Build NYC
UK Financial Plan & Risks
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
2018 Adopted Budget February Financial Plan
Capital Programming Committee South Coast Rail Phase 1 Service
Key Issues CPOC Update February 2011 Second Avenue Subway TBM Drive #1
Regional Rail What is Missing? Metro-North NJ Transit LIRR
25th Avenue Grade Separation
25th Avenue Grade Separation
INFRASTRUCTURE RENEWAL AT NEW YORK PENN STATION
Cost Containment Working Group Board Update
Supplemental Independent Review Team - ESA Management Review
Central Corridor - Light Rail Transit Metropolitan Council
Cost Containment Working Group Board Update
Harbour Island Force Main Replacement
Second Avenue Subway Project Execution Strategy
Design and Engineering Services
Presentation transcript:

MTACC Quarterly Progress Report to CPOC East Side Access January 27, 2014

Major Construction Completed Over $2 Billion in construction was completed in 2013 including the four major tunneling contracts in Manhattan and Queens 1

Manhattan Caverns and Tunnels Overview 50th St 43rd St 55th St 59th St 2

59th St Transition Key 3

53rd St Transition Key 53rd St 50th St 4

53rd St Crossover Key 53rd St 50th St 5

Caverns Key 6

Caverns Key West Cavern East Cavern 60 ft. 1140 ft. (Typ) 60 ft. 7

Mined Caverns and Shafts Below Grand Central Park Avenue Vanderbilt MNR Lower Level MNR Upper Level LIRR Mezzanine Off Street Entrances LIRR Concourse Escalator Shafts Terminal Caverns Upper Platform Lower 91’-0” 140’-0” Freight Elevators Passenger Section Looking North 19 Elevators and 50 Escalators Section Looking North 8

43rd St Transition Key 43rd St 9

Muck Removal Muck traveled 3.5 miles to Queens 10

1.5 Million Cubic Yards of Muck Removed 75,000 Trucks = 700+ miles (NYC to Indianapolis) 700 feet Other Muck West Cavern East Cavern 11

Other Construction in Manhattan Ventilation Plants: Facilities at 44th Street and 50th Street, worth in excess of $110M, are on target for completion during the first quarter 2014 Facility at 55th Street is progressing on schedule, with all excavation to be completed by the end of January Manhattan South Structures (CM005) was awarded in September and construction is progressing ahead of schedule. 12

Queens – Existing Site 1 mile Sunnyside Yard Northern Blvd Yard A 43rd St 39th St Honeywell St Harold Interlocking Queens Blvd Thomson Ave 1 mile To Penn Station 13

Queens – Harold Interlocking NYS AGC Construction Industry Conference - December 5, 2012 4/15/2017 Queens – Harold Interlocking 2 miles of tunneling under the busiest passenger train interlocking in the United States (~750 trains through Harold) Four different Railroads impacted (LIRR, Amtrak, NJ Transit and NY Atlantic) 14 MTA/LIRR East Side Access

Harold – Summary of Infrastructure 4 Tunnels totaling 10,500 linear ft. 313 catenary poles – 60 ft. tall with 40 ft. hand dug foundations 10.7 miles of new track 95 new switches 5 new railroad bridges 26 signal towers for high tension power 15 signal bridges 15 new Signal CILs (Central Instrument Locations) 13,500 linear ft. of LIRR signal trough Hand digging foundations & rebar for catenary structure Northern Blvd. Crossing 15

Construction Highlights in Queens & Harold Plaza Substation and Queens Structures includes work on the B10 Substation and in the 63rd Street tunnel in preparation for immediate turnover to the Systems contract Active Harold Construction contracts to be completed by summer of 2014 Westbound Bypass (CH057A) The first High Speed Rail funded contract was awarded in November, with NTP in December Extended Track Outages Under review with inputs from LIRR and Amtrak 16

Next Phase of Construction is Underway Project is transitioning from underground excavation construction to Civil/Systems construction which is MTA’s core competency 17

Three Month Look Ahead Contract awards valued at $850M following January Board meeting Manhattan North (CM006), Systems Facilities (CS179) and Signal Equipment procurement (VS086) Advertise three contracts worth approximately $500M by end of first quarter 2014 GCT Concourse and Finishes (CM014B) following an industry outreach which occurred in November Traction Power procurement (CS084) LIRR Track installation (CH057B) Continue the Request for Expression of Interest (RFEI) for the GCT Caverns (CM007) Contractor submissions and interviews scheduled for February 18

Supplemental Independent Review Update to CPOC CM005 – South Structures Finish Out Work CM006 - North Structures Finish Out Work CM007 – GCT Caverns Finish Out Work 19

Supplemental Independent Review Background Project Budget and Revenue Service Date as established in 2012: $8.245 billion September 2019 January 2013 – Contract repackaging (CM005, CM006 & CM007) due to CM012R (Manhattan Structures) over budget March 2013 – MTA Chairman/CEO calls for Supplemental Independent Review Review ESA Management/Organizational Structure Evaluate constructability issues (access) in Manhattan for civil and systems work Check Estimate on schedule and cost projections April 2013 – FTA/PMOC cites preliminary cost and Revenue Service Date ranges June 2013 to January 2014 – Supplemental Independent Review Activities Organizational review Constructability review for Manhattan and Harold Participation in Risk Assessments Project wide and Contract level analyses of schedule and budget CM005 – South Structures Finish Out Work CM006 - North Structures Finish Out Work CM007 – GCT Caverns Finish Out Work 20

Supplemental Independent Review Initial Findings/Recommendations Risk Profile Change Transition from tunnel boring & mining to systems/finishes Organizational changes to reflect transition from civil finish out to systems work Informed Repackaging Plan for Manhattan Structures Finish Out Work Manhattan & Harold Constructability Assessment Overall base schedule forecast beyond 2019 Overall project cost forecast above $8.245B Critical issues with Harold operations informed schedule – ongoing review 21

Management/Organizational Changes Tone at the Top - MTAHQ is prompting change at East Side Access and endorses the following: ‘Executive Steering Committee’ ESA Executive Management Team ESA management structure changes ESA reporting lines simplified Business Processes (Change Control, Procurement, Estimating, Scheduling) strengthened 22

Proposed ESA Organizational Chart (including Capital Program oversight) CPOC ESA EXECUTIVE MANAGEMENT TEAM Technical Support (As Needed) IEC MTA Chairman/ CEO Headquarters/ Capital Programs Program Executive Heavy Civil ESA EXECUTIVE STEERING COMMITTEE Tom Prendergast Chairman, MTA Michael Horodniceanu Member, MTACC Helena Williams Member, LIRR TBD Member, AMTRAK MTA-CC President Senior Program Executive MTA-CC East Side Access Program Executive Project Control/ Support Program Executive Harold/Queens/ Systems & Startup Heavy Civil Construction Harold/ Queens Systems LIRR & AMTRAK Working Team(s) Design Support Contracts Contracts Contracts Construction Coordination and Interface Project Controls Budget Finance and Operations 23

Budget Forecast Comparisons Budget Forecast Status January 2014 ESA Budget Forecast Note: This risk/contingency figure reflects a medium degree of mitigation (MDM) Rolling Stock Reserve Base Cost Risk/Contingency 24

Schedule Forecast Comparisons Schedule Forecast Status January 2014 Base Schedule Note: Supplemental Independent Review, Independent Engineering Consultant, and FTA risk/contingency number represents a medium degree of mitigation (MDM). MTACC risk/contingency is based on ‘bottom-up’ approach to establishing project schedule. Risk/Contingency 25

RECENT and Upcoming Activities Management and Organizational Changes: - Senior Program Executive has recently been appointed Project Controls and Heavy Civil Program Executives have recently been appointed Appoint Harold/Queens Systems Program Executive Realize Executive Steering Committee Issue final Supplemental Independent Review reports on remaining tasks by end of March 2014: Refinement of Project Schedule and Budget Complete project wide and contract specific risk assessments: Manhattan – Systems & Harold Interlocking 26