6 th Street (Junipero to Bellflower) Bike Boulevard Design Concepts March 2012.

Slides:



Advertisements
Similar presentations
Complete Street Analysis of a Road Diet Orange Grove Boulevard Pasadena, CA Aaron Elias Engineering Associate Kittelson & Associates Bill Cisco Senior.
Advertisements

City of Oakland: Road Diet Experience
Road Diets and Roundabouts
Presented by Nazir Lalani P.E TRAFFIC SAFETY EVALUATIONS (Pedestrians and Bicyclists)
City of Toledo Bancroft Street Neighborhood Public Meeting November 20, 2013.
Pedestrian and Bicycle Issues Richmond, CA Richmond Bicycle & Pedestrian Advisory Committee (RBPAC) June 2, 2008.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Ed Cox City of Sacramento, Department of Public Works Bicycle Solutions in Sacramento.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
Virginia Street Corridor Plan. From our Tier One University, world renowned recreation and our Midtown entertainment area to abundant cutting edge business.
Sidewalk Bikeways: A Safety Problem, Not a Safety Solution.
Juneau Downtown Tourism Transportation Study May 27, 2003.
Contact: Beth Morris
Pedestrian and Bicycle Concerns About Highway Design and Operation Barb Mee, AICP City of Asheville Transportation Department
Slide 1. Slide 2 Introduction How did you get to school as a child?
Building a Bike-Friendly Los Angeles About LACBC The only member-supported, non-profit bicycle advocacy organization in Los Angeles County Founded.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
Divya Nagananda and Dr. Emelinda M. Parentela California State University, Long Beach June 26, 2012 Santa Barbara ITE 2012 An Evaluation of Bike Lanes.
Plan Purpose:  To provide pedestrian environments that are safe, attractive, and accessible to community institutions, employment and retail services.
1 City of Rapid City and Rapid City Community Planning RAPID CITY BICYCLE AND PEDESTRIAN MASTER PLAN in collaboration with: Kadrmas, Lee and Jackson RDG.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Shared Roadways Lesson 14 (This picture shows bicyclists not.
University Bike Master Plan. University Policy  Bicycle committee recommends that the current policy for bicycles on sidewalks be changed to create a.
1 UNION STREET Easthampton | Complete Street Conceptual Design { { Streetscape for Union Street Community Workshop October 28, 2013 Planning Department.
City of Leawood Bicycle Friendly Community The Year in Review.
King Street Cycle Track Project Update Department of Transportation Services City & County of Honolulu.
1 Matadero Creek Trail Midtown Resident Association April 16, 2013.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
APWA Management & Public Administration Committee Creating Complete Streets to Accommodate All Users May 23, 2012.
Biking as Transportation Safely Today we will have a great and safe ride. We will use our bikes as transportation. We will ride in pods, following our.
Drive Smart Virginia Sharing the Road 101 OUR WORLD IS CHANGING Are becoming more popular means of travel So is the way we get places. We still like.
Madison Avenue Traffic Calming Who We Are: Consortium of 17 neighborhood associations, churches, schools, hospital, and businesses concerned about economic.
Comprehensive Plan Update Kevin O’Neill Seattle Bicycle Advisory Board September 2, 2015.
23 rd Avenue Corridor Greenway Community Open House November 6, 2013.
Roundabouts: A Safer Choice. What is a roundabout? A roundabout is a type of circular intersection with yield control of entering traffic, islands on.
Right-of-Way Who Goes First?.
The Main Street Bike Lane Project LADOT Bike Program.
Paul Lippens, AICP Senior Planner phone x Themes for Complete Streets November 13, 2012.
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Complete Streets Plan Philadelphia Vision Zero Presented by Raj Mohabeer PLA, ASLA, AICP, LEED®AP December 3, 2015 Detroit’s.
 Warn drivers about dangerous situations  The are for road conditions that need caution for specific hazards that may be encountered.
Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.
Small Cost – Big Impact: Lessons in Low-Cost Safety Improvements Gustave Scheerbaum, PE Complete Streets Safety Engineer ARLE Grant Programs Manager City.
Traffic Safety. WHY ARE WE HERE To keep children safe around our schools What we will be discussing –Driving safely in and around Schools –Bicycle safety.
Share the Road, Asheville. WATCH THE “DOOR ZONE.” Motorists - LOOK BEHIND before opening door. Cyclists - watch parked cars & stay OUT of the zone. For.
Lompoc Walkability Assessment September 24, 2009.
1 BASIC URBAN BIKEWAY TYPES. 2 Suburban arterial: bike lanes.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
City of Redmond: Northwest Redmond & U.S. Highway 97 Plan - October 11, 2006 What Makes a Great Neighborhood.
A Waterloo Region Case Study.  Waterloo Region  Connecting residents to your work  Ideas start off small  Plan for change  Moving forward  Your.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
Norwalk Bikeway and Pedestrian Transportation Plan Fitzgerald & Halliday, Inc. with Alta Planning + Design and Stantec Innovative Planning, Better Communities.
Bicycle Facilities Design Lecture 25 Norman W. Garrick.
City of Johnston NW55th Avenue Improvements Public Open House June 24, 2014.
Bicycle Safety Countermeasures Module 4.
Saving the King Street Bicycle Boulevard
Bicycling in Minneapolis Bicycle Master Plan/Protected Bikeway Update
32 Transportation Midway City 2016 General Plan
Finance Committee & City Council August 8, 2016
SR 60/Kennedy Boulevard and Jackson Street Resurfacing Projects
Concept Sketch of a Bicycle Priority Lane a) Multilane Street, along a Parking Lane When along a parking lane, right edge of bicycle priority lane is 10.
City of Wilmington Bike Plan Update
Developing a Pedestrian -Bicycle Safety Action Plan
Meadow Lake Boulevard Street Extension Project
Protected Bicycle Lanes Finally Pedal Their Way to KC…
New Hanover Comprehensive Plan
Project Location: 35th Ave HSIP8
Presentation transcript:

6 th Street (Junipero to Bellflower) Bike Boulevard Design Concepts March 2012

2 Bicycle Master Plan Update Daisy / Linden / Myrtle N-S Bike Blvd 14 th – 15 th E-W Bike Blvd 6 th Street E-W Bike Blvd 6th Street is one of 3 bike boulevard projects the City is working on at this time

3 Project Schedule Preliminary Design Community Meetings Permitting Community Meetings Final Design Construction October March 2013 April May 2013 November December 2013 July 2014

What is a Bike Boulevard Low-volume streets optimized for bicycle and pedestrian travel Facilitates interconnectivity among schools, parks and neighborhoods Street beautification Safe pedestrian and bicycle crossing at intersections

Separated Bikeway: Broadway & 3rd Golden Alamitos Broadw ay 3 rd Street 6th Street (Junipero to Bellflower) Key Design Concerns Tie in with linear park planned for PE ROW Crossing at Ximeno Connections with Bellflower and PCH

6 Elements of Design Roundabouts, Circles, Sharrows & traffic signal Vista Bike Boulevard

7 Elements of Design “Sharrows” – Shared Lane Markings Positioning for cyclists outside the door zone Gives notification to motorists to expect cyclist in lane

Slower traffic speeds Safer for bicyclists and pedestrians due to the reduction conflict points with vehicles Roundabouts Doubled number of students walking and tripled number of bicycling to school

9 Design Element Concepts Potential Roundabout Park Avenue Potential Traffic Circles Molino, Temple, Orizaba, Obispo, Grand, Termino, Rosewell, Santiago, Havana & Ultimo Avenues Potential Park Pacific Electric Right-of-Way Potential light Pedestrian Hybrid Beacon at Ximeno

Project Goals Reduce speeds on residential streets Minimize cut through traffic on local streets Ensure safe crossing of busy streets for pedestrians and people who ride bikes Provide safe and convenient access to schools, parks and businesses

For more information Steve Tweed