G2p/GEp Beamline Tim Michalski Project Lead. Overview Facilitate the design, procurement, and build of the beamline – up to the target chamber g2p/GEp.

Slides:



Advertisements
Similar presentations
G2p/GEp Preparation Overview Jian-ping Chen g 2 p /G ep Readiness Review 5/6/2011.
Advertisements

Overview of the GlueX Tagger and Photon Beamline..
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Y. R. Roblin, G2P review, 1/17/ HALLA G2P readiness review Yves Roblin, CASA.
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
G2P Target installation and Beyond. Schedule Pivot before.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
E166 “Polarized Positrons for Future Linear Colliders” John C. Sheppard E166 Co-spokesman SLAC: August 31, 2004.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
1 Hall A Update Thia Keppel APEX Collaboration Meeting April 2015.
Bubble Chamber Planning Meeting 04 September
Improved beam line for Hall A layouts, present and proposed optics in altered region benefits of proposed layout costs of proposed layout conclusions.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
Bubble Chamber Installation Kick-Off Meeting May 28, 2014, Grames Let’s discuss two jobs between the cryounit and injector gate. Bubble chamber (5D) New.
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
S PIN A SYMMETRIES ON THE N UCLEON E XPERIMENT ( E07-003) Anusha Liyanage Experiment Nuclear Physics Group Meeting Hampton University May 11, 2009.
UVA Polarized Target In Hall A Pictures and Cost Paul Brindza Dec 17, 2009.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
Draft HPS Run Plan March 30, Next Steps Beamline Setup Trigger Commissioning Beam Stability Studies SVT Commissioning Data Taking Checking the.
G2p/GEp Beamline Tim Michalski Project Lead. Beamline Overview Slow Raster Tungsten Calorimeter Upside Down Girder (correctors, BCM, superharp) FZ1 Magnet.
Update on Accelerator Commissioning Plan Todd Satogata Accelerator Physics Group Head Center for Advanced Studies of Accelerators Accelerator Readiness.
G 0 Coordinator Update & “To-Do List” Joe Grames William & Mary, June 5-6, 2006  Hall C Beam Line Tasks  Accelerator Preparation Tasks  Beam Halo 
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
G2p/gep Beamline Project Overview Tim Michalski Project Lead.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
Welcome to Jefferson Lab R. D. McKeown Jefferson Lab Hypernuclear Workshop May 27, 2014.
Thia Keppel 6/4/13 Hall A Update. Near term accelerator schedule – same as last meeting Accelerator Run II: Beam in hall 3/2014, or maybe as early as.
1 G9a -FROST. 2 Experiments FROST New generation of CLAS photoproduction experiments with FROzen Spin Polarized Target (FROST) E02-112: γp→KY (K + Λ,
Conventional Construction Working Group Meeting Tom Lackowski L2 Conventional Facilities Mu2e Working Group.
NUMI NuMI Magnet Power Supply System WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 11, 2001.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
Y. R. Roblin Hall A beamline and accelerator status.
PIP Update April 10 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Eliana.
Spreaders & Recombiners Beam Transport Michael Bevins May 30, GeV Upgrade - Beam Transport Spreader/Recombiner Dipoles and Layout, & Installation.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
SANE Collaboration ( E07-003) Anusha Liyanage Hampton University January 12, 2010 Measurement Of the Proton Form Factor Ratio at High Q 2 by Using The.
Bubble Chamber Planning Meeting 07 August
Run Coordnator Report 2012/04/ /04/10 Jixie Zhang
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Beam Position Reconstruction Pengjia Zhu 02/15/2012.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
G2P Installation Readiness. Fast raster & Calorimeter.
HB2008 – WG F: 27 Aug. S. Childress – Diagnostics_2MW 1 NuMI Beam Diagnostics and Control Steps to 2 MW S. Childress Fermilab.
Failure Analysis Tools at DESY. M. Bieler, T. Lensch, M. Werner, DESY ARW 2013, Melbourne,
Overview of Onsite Progress Jian-ping Chen g 2 p /G ep Collabroation Meeting.
Extraction/Separator Setup Michael Spata Operations Stay Treat July 16, 2015.
G2p/GEp Beamline Status Tim Michalski Project Lead.
Beam Loss Monitors and Ion Chambers for protecting Hall Equipment Tommy Michaelides (SSG) Stay Treat 2016.
Paul Scherrer Institut
Potential Use of PEP-II Magnets by Project X
Upgraded Injector Test Facility
Hall C – this week Time Period Plans 10/24-10/27 Target cool down
Hall C Beamline Upgrade
Extraction Michael Bevins May 17, 2007
Ion Source and LEBT Beam Diagnostics
(Beam) Commissioning Plan
Injector/Linac Design Status C. E
Isotope Readiness Review Run Plans
Presentation transcript:

g2p/GEp Beamline Tim Michalski Project Lead

Overview Facilitate the design, procurement, and build of the beamline – up to the target chamber g2p/GEp Beamline Overview Experimental Plan Project Overview Project Status Project Challenges with Risk Mitigation Project Schedule and Milestones

Beamline Overview A second configuration will have the target at the pivot and a longer articulating arm.

Experimental Plan Run # Bam Energy Beam Current Target AngleTarget LocationSepta MagnetDump Target MaterialTarget fieldComments uA2087 cm upstreamN/A Hall A DumpN/A0.0Straight Thru Beam at nominal height nA9087 cm upstreamg2pYes - 6 degLocal DumpNH35.1 T nA max9087 cm upstreamg2pYes - 6 degLocal DumpCarbon(?)5.1 TThru Target(?) - Optics nA2087 cm upstreamGEpYes - 6 degLocal DumpNH35.1 T uA2087 cm upstreamN/A Hall A DumpN/A0.0Straight Thru Beam at nominal height nA2087 cm upstreamGEpYes - 6 degLocal DumpNH32.5 T nA9087 cm upstreamg2pYes - 6 degLocal DumpNH32.5 T nA max9087 cm upstreamg2pYes - 6 degLocal DumpCarbon(?)2.5 TThru Target(?) - Optics uA2087 cm upstreamN/A Hall A DumpN/A0.0Straight Thru Beam at nominal height nA9087 cm upstreamg2pYes - 6 degLocal DumpNH32.5 T nA max9087 cm upstreamg2pYes - 6 degLocal DumpCarbon(?)2.5 TThru Target(?) - Optics nA2087 cm upstreamGEpYes - 6 degLocal DumpNH32.5 T nA2087 cm upstreamG2pYes- 6 degLocal DumpNH35.1TTarget nominal height nA9087 cm upstreamg2pYes - 6 degLocal DumpNH35.1 TTarget nominal height uAN/A87 cm upstreamN/A Hall A DumpN/A0.0Straight Thru Beam at nominal height nA087 cm upstreamg2pYes - 6 degHall A DumpNH35.1 TLongitudinal target polarization run nA9087 cm upstreamg2pYes - 6 degLocal DumpNH35.1 T nA max9087 cm upstreamg2pYes - 6 degLocal DumpCarbon(?)5.1 TThru Target(?) - Optics uAN/AAt pivotN/A Hall A DumpN/A0.0Straight Thru Beam at nominal height nA90At pivotg2pNo degLocal DumpNH35.1 T nA max90At pivotg2pNo degLocal DumpCarbon(?)5.1 TThru Target(?) - Optics nA90At pivotGEpNo degLocal DumpNH35.1 T *** nA90At pivotNo – 12.5 degLocal DumpN/A2.5 TOptics Transform uAN/AAt pivotN/A Hall A DumpN/A0.0Straight Thru Beam at nominal height nA90At pivotg2pNo degLocal DumpNH35.1 T nA max90At pivotg2pNo degLocal DumpCarbon(?)5.1 TThru Target(?) - Optics nA90At pivotGEpNo degLocal DumpNH35.1 T *** - FZ1 and FZ2 in position for 2.2 GeV run, but with half field strength on FZs and Target magnets Rev 3

Run Trajectories FZ1 FZ2 Target FZ1 FZ2 Target

Region 1

Slow Raster/Calorimeter Stand

Regions 2 and 3

Upside Down Girder – Region 2

FZ1 Magnet Stand – Region 3

Viewer – Region 3

Beam Diagnostics Girder “Articulating Arm” – Region 3

Project Overview Design, procurement, component calibration and testing –Now through May, 2011 –Some components arrive after May Access to Hall A for installation –May 16, 2011 Installation completion – start of Physics –November 19, 2011

Project Status Regions 1 and 2 designs complete and material ordered Region 3 design complete – procurement under way Calorimeter controller repaired and SW upgrades complete I&C electronics designed and being built New Transport electronics being built for existing BPMs in Hall A Safety systems for experiment reviewed Resource planning integrated into 6MSD schedule

Project Challenges BPMs and BCMs for Low Current data –Mitigation BPM – short M15 style, new electronics, tested in North LINAC BCM – new receiver, tested in Hall A FZ Magnet PS requirements evolving –Need up to 4 kG, requiring 231A for FZ1 –Need up to 8 kG, requiring 465A for FZ2 –Mitigation – assessed capabilities of magnet power supplies in Hall C – meet requirements – assembling spares

Project Challenges Acquisition of equipment from various sources –FZ magnets, corrector magnets, slow raster, new BPMs, power supplies, controllers –Mitigation – get control as soon as possible, test and calibrate early (before installation) Resurrection of Tungsten Calorimeter –Reposition in beamline, re-establish functionality, recalibrate –Mitigation – Controller extracted from Hall A, repaired, SW complete

Project Challenges Slow Raster control issues in previous experiment –Mitigation – New function generator – Testing in Progress by Physics Fast Electronics Group Installation at the same time as 12 GeV upgrades during 6 month down –Mitigation – tied to detailed 6MSD planning – all resources identified in schedules – have ~3 weeks float

Project Challenges Not all material for installation on site yet –Mitigation –FZ2 Stand procurement being managed – potential impact to 6MSD installation reviewed –Viewer and Articulating Arm Girder / Positioning – manage through Machine Shop and local vendors

Safety – PSS / FSD Uses standard BLA system components Monitoring FZ magnet PS current – limits set to ensure beam is controlled successfully through the chicane FSD masking for Calorimeter Operation Viewer in chicane – allows MCC Operators to view beam for steering confirmation Thermocouples on LC dump Viewer on LC dump – allows MCC Operators to view beam for steering confirmation Update PSS sweep procedure as required after walk- through, equipment installation “Lock Out” FZ2 stand control – remove controller

Beamline Installation Schedule

Beamline Installation Milestones