1 Overview of Onsite Progress Jian-ping Chen g 2 p /G ep Collabroation Meeting

2 REGION 1 REGION 2REGION 3 REG 4 REGION 5 Slow Raster FZ1 FixedStand FZ2 Telescoping Stand DUMP TARGET Polarized Solid NH 3 Target (Hall C/UVa target) Target material irradiation Beamline (Similar to Hall C) Magnetic Chicane/Beamline modifications. Low beam current BCM/BPMs Slow Raster Hall A Engineering/Design Local Beam Dump Hall Infra-structure Scattering Chamber/ Target/magnet mount Septum Magnets Simulations/Optics/Spectrometer/Detectors/QAD… BPMs Use existing equipments Hall C beamline/target Keep change minimum modify the existing PREX septa use simple local beam dump Major equipments for g 2 p /G E p experiments Septa/HRS

3 Significant Progress in Beam Line System (T. Michalski, B. Dillon-Townes) Overview conceptual design completed Region 1 and Region 2 design drawings completed Region 3 main items identified and detail design on-going Existing hardware items (magnets, raster, power supplies) located New items (BPM electronics, Harps, BCM, BD magnets, …) Target Progress (C. Keith/ D. Crabb) Conceptual design Rotating seal Pumps ordered New fridge at UVa tested (along with existing target materials and other systems) need to manufacture one fridge at JLab Target material irriadiation: will do it at NIST Magnet is being shipped from Oxford back to JLab? Hall A infrastructure, Beam dump, Septum (A. Gavalya, R. Wines) Setup at the pivot area for the target Beam dump Septum Scattering chamber/ layout/ interferences 3 rd Arm for polarization monitoring Simulations Overview of Progress

4 3.3 GeV, 12.5 deg 2.2 GeV, 15 deg 3.3 GeV, 6 deg 2.2 GeV, 6 deg 1.6 GeV, 6 deg 1.1 GeV, 6 deg Polarized beam: 50-130 nA up to 5 uA? for optics, 30 uA ? for Compton Polarized NH 3 target Slow Raster 25 mm diameter G e p configuration is now basically g 2 p at the elastic setting Two configurations: with septa (6 degree) (target at 87 cm upstream) and without septa (12.5 and 15 degrees) (target at original pivot) g 2 p needs target at 90 degrees for all and 0 degree for 3.3 GeV G E p needs target at 80 degree Kinematic Settings (Last Meeting)

5 3.3 GeV, 12.5 deg 2.2 GeV, 12.5 deg 3.3 GeV, 6 deg 2.2 GeV, 6 deg 1.6 GeV, 6 deg 1.1 GeV, 6 deg Polarized beam: 50-130 nA up to 1 uA for optics, (also for Compton?) Polarized NH 3 target Slow Raster 20-25 mm diameter G e p configuration is basically g 2 p at the elastic setting Two configurations: with septa (6 degree) (target at 87 cm upstream) and without septa (12.5 and 15 degrees) (target at original pivot) G 2 p : target at 90 degrees for all and 0 degree for 3.3 GeV G E p : target at 20 degree? Kinematic Settings (Now)

6 Cost, mostly consistent with initial estimation, some increase due to new items A) Beam line procurement: 14 BMP electronics harps (can not use the existing French harps) Beam line manpower: the two items above + software group B) Target group estimation, procurement increased from 80 K to 140K. FY11, continuing resolution addition funding from DOE (promised) not here yet. User pledged contribution to procurement : $ 80K to Engineering/Installation: ? Total: $140K Will need user to honor the pledges. Manpower cost will be supplied from within JLab. Need help from user manpower Budget and User Contributions

7 Questions and Issues Should we do Compton with 1 uA, straight-through, how many times? How should we do optcis study-? What optics target(s) should we have? How to do the polarization monitoring (3 rd arm)? Should we do a field map at EEL? Should we add some iron plates to study the effect? Should we and how to measure field direction? Should we do a field map in Hall A (combining target/septa)? …?

8 Onsite User/Hall A People Power PhD Students: Pengjia Zhu (USTC, advisor: Yunxiu Ye), 3 rd year, onsite, (beamline, target) Min Huang (Duke, Haiyan Gao), 3 rd year, onsite, (simulation, optics) Chai Gu (UVa, Nilanga Liyanaga), 2 nd year, onsite from 2/2011 Melissa Cummings (W&M, Todd Averett), 2 nd year, onsite from 5/2011 A student from Temple (Zein-Eddine Meziani), 2 nd year, onsite from 5/2011? Name? (New Hampshire, Karl Slifer), 1 st year, onsite from? ? Postdocs: Kalyan Allada (Hall A), beamline, 3 rd arm Jixie Zhang (Hall A): simulation, optics Xiaohui Zhan (Argonne) (onsite from 2/2011), target? Narbe Kalantarians(UVa): target Hovhannes Baghdasaryan (UVa) ? Sarah Philips (New Hampshire) ? ? Physicists: Jian-ping Chen (Hall A): Project manager, overall coordination Alexandre Camsonne (Hall A): Beam line, DAQ, … Karl Slifer (New Hampershire): Overall consideration, run plan, … Doug Higinbotham (Hall A) (will be more available after SRC experiments?) Guy Ron (LBNL)? ?