5-6 May 2009 AWG Meeting LAX1 Technology Development Project US contributions to global.

Slides:



Advertisements
Similar presentations
SKA New Technology Demonstrator Ray Norris CSIRO Australia Telescope National Facility.
Advertisements

Square Kilometre Array (SKA) Project PRE-CONSTRUCTION PHASE Briefing for Industry & Science Organisations Tuesday 14 th August Wellington.
Antennas for MeerKAT March TDP AWG, 13-14/3/08, San Francisco MeerKAT Semantics K.A.T. = Karoo Array Telescope –KAT is Afrikaans for cat –MeerKAT:
Test Automation Success: Choosing the Right People & Process
Indicative Business Case
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
DVA-1 Project Management Proposal Chris Langley, NRAO 1 US SKA Consortium Meeting - DVA-1 Project Management Proposal June 3-4, 2010.
US Technology Development Project for the SKA Jim Cordes AWG Meeting March 2008, San Francisco SKA Context TDP work plan Constraints and considerations.
Goals of DVA-1 Meeting Overall goal: build an SKA antenna with SKA feeds/receivers, verify performance and fabrication/costs for the next stages of the.
ASKAP and DVP David DeBoer ASKAP Project Director 15 April 2010 Arlington, VA.
22 May 2008Lynn Baker USSKA Consortia Meeting Washington, DC1 Project Manager, Responsibilities and Tasks –Coordination between groups within the TDP –Promote.
March 2009LOFAR MKSP Update: SKA and PrepSKA Paul Alexander.
SKA TDP Advisory Committee Report to US SKA Consortium, 17 November 2008, Madison Trish Henning.
22 May 2008 Jim Cordes US SKA Consortium Meeting Washington, DC1 Technology Development Project Presentation TDP OverviewJim Cordes »Programmatics »International.
Marco de Vos Summary, Conclusions & ActionsAAVP 2010 Summary, Conclusions and Actions Marco de Vos
Dominion Radio Astrophysical Observatory DVA-1 Reflector Development Timeline Gary Hovey NRC-HIA Dominion Radio Astrophysical Observaotry.
National Astronomy and Ionosphere Center © Germán Cortés M 2008 SKA TDP Antenna Optics By Germán Cortés M. Cornell University Ithaca NY 14853, USA National.
Lecture 3 Strategic Planning for IT Projects (Chapter 7)
Enterprise Architecture
1 Portfolio Simulation / Forecasting: Selecting improvement initiatives to maximize “points of leverage“ May 1, 2006 Alan Poirier Director, Analysis Metrics.
SKA-Japan Industry Forum [SKA-Japan Workshop 2010] EMC & Microwave Systems November 05, 2010.
Chapter 11 Assessment Framing Solutions. Collaborative Planning Processes A comprehensive intervention or action plan includes –Goals and objectives –Targets.
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
AAAC Meeting February, New GSMT Role NSF has asked that AURA/NOAO act as NSF’s "Program Manager" for the GSMT Technology development effort at a.
DVA Series Work Flow P. Dewdney Apr 15, SPDO DVP Work Flow 2 DVA-1 CPG.
Transition from SKADS to PrepSKA Richard Schilizzi Lisbon, 3 October 2008.
Andrew Faulkner1 Technology Readiness Levels 4 th SKADS Workshop, Lisbon Technology Readiness Levels TRLs Andrew Faulkner.
N. RadziwillEVLA NSF Mid-Project Report May 11-12, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
Bill SahrEVLA Advisory Committee Meeting May 8-9, EVLA Monitor & Control.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
2 nd convergence workshop: introduction R. T. Schilizzi Penticton 22 July 2004.
SKA System Design Kobus Cloete 9 December 2010 AAVP Workshop "Exploring the Universe with the world's largest radio telescope"
CASS, Marsfield Phil Diamond 4 October 2011 SKA Pre-Construction Phase: Where we are, and what we’re trying to achieve ?
SKA Dishes, CSIRO February 2013 SKA Dish Verification Antenna #1 Gary Hovey Astronomy Technology Program – Penticton 12 February 2013.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
Peter Wilkinson1 Conclusions 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKADS aims to –Demonstrate SKA Scientific Viability and Readiness –Demonstrate.
Peter NapierEVLA Correlator CoDR Nov 2, EVLA Correlator CoDR P. Napier Overall EVLA Project Plan.
Peter Wilkinson SKADS Workshop: Paris 10 October nd SKADS Workshop: Introduction “What is it about?” Peter Wilkinson University of Manchester.
WWRP Implementation Plan for the WWRP Polar Prediction Project Thomas Jung, Steering Group Chair Neil Gordon, WMO Consultant November
Response to ASAC Report of May 2004 Response to ASAC The Atacama Large Millimeter Array Tom Wilson and Al Wootten Science IPT.
1 - RAP-11/17/08 SSEC Agenda Suggestions Preparations for SSEC2 at Cape Town Bob Preston.
DVP Testing Neil Roddis Apr 15, SPDO Why is test and verification so important for SKA dishes? Capital cost: design for low cost of a few thousand.
Director’s update CSIRO Astronomy and Space Science Lewis Ball CASS Chief 11 June 2013.
Answers from the Working Group on AGN and jets G. Moellenbrock, J. Romney, H. Schmitt, V. Altunin, J. Anderson, K. Kellermann, D. Jones, J. Machalski,
1 ARENA Workshop Renewables for Industrial Processes.
June 3,4 2010Lynn Baker USSKA Consortia Washington, DC1 TDP / AWG Update Lynn Baker USSKA Consortia Meeting Washington DC June 3,4, 2010.
Summary of the Paris SKA Meeting 4-8 September 2006 R. T. Schilizzi.
RupenEVLA Advisory Committee Meeting May 8-9, Software Requirements Michael P. Rupen EVLA Project Scientist for Software rev. 3may06.
The North America Array Technology Development and the Realization of the SKA-High Steven T. Myers & Jim Ulvestad NRAO 15 Oct 2009 USSKA Consortium Meeting.
The SKA: Next Week, the Next 3 Years & Beyond Jim Cordes, Cornell University 24 August 01  Concepts  Science Goals & Payoffs  Configurations, Modes.
N. RadziwillEVLA Advisory Committee Meeting May 8-9, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
Managing programs that promote personal effectiveness.
Project Management Plan. Project Organisation DVA-1 Board n One member for each stakeholder n Oversees execution of DVA-1 on time and within budget n.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Bill SahrNSF Review May , EVLA Monitor & Control.
What has been accomplished at the end of MSD 1 & 2?
Computing Introduction Gareth Hunt EVLA System PDR 2001 December 04.
LARP Review, June 10, 2013Cost and Schedule Overview – M. Kaducak 1 Cost and Schedule Overview Marc Kaducak LARP Review June 10, 2013.
6 May 2009Lynn Baker AWG Meeting LA1 TDP Antenna and Feed Plan Lynn Baker Antenna Working Group Meeting Los Angeles, CA May 6, 2009.
17 November 2008Lynn Baker US SKA Consortia Meeting Madison WI1 TDP Activity Report Lynn Baker US SKA Consortia Meeting Madison, Wisconsin November 17,
CETC54 contributions Neil Roddis Apr 15, SPDO In Shijiazhuang Covering the area of 2 sq.km. Founded in 1952 Over 5000 employees (543 senior engineers,
The North America Array Technology Development and the Realization of the SKA-High Steven T. Myers NRAO 14 May 2009 USSKA Consortium Meeting Washington,
SCT Project Management Issues
Jim Cordes Cornell University
VLA to EVLA Transition Plan
Software Requirements
Gustaaf van Moorsel September 9, 2003
DVA1 as Part of the Dish Verification Program (DVP) Washington, DC P
CoDR Scope Definition, Objectives & Agenda Jodrell Bank
Presentation transcript:

5-6 May 2009 AWG Meeting LAX1 Technology Development Project US contributions to global effort to design the SKA –Includes US contribution to the SPDO common fund –TDP deliverables equated with PrepSKA deliverables for LNSD subsystems + verification systems Targets areas that bear strongly on cost and basic performance (A e, T sys, B, cross polarization,calibration and processing, imaging dynamic range) Organized in two working groups (AWG, CPG) Will deliver to the SKA project: –Technology options for LNSD array with broadband single-pixel feeds –Costing of reflectors+mounts vs. D and f max –Optical designs that include both SP + PAF options –SKA-optimized antenna designs –Verification antenna outfitted with feeds/receivers –Calibration and processing algorithms + processing cost assessment for LNSD arrays –Cost-modeling information for project decisions

AWG Meeting Goals, Context and Status TDP goals  SPDO goals Costed system design by 2012 Prototype dish/feed/LNA options realized in one or more prototype (verification) systems by 2012 Broad timeline: Design Phase| Engineering Design | ϕ 1 Construction (now) ~ ± Initial deployment in ϕ 1 will be dishes + SPFs It is understood that other technologies (PAFs, AAs) may provide transformational survey capabilities but may need more time to develop and play a role in later phases 5-6 May 2009 AWG Meeting LAX2

Dilemma How to meet the near term timeline to 2012 (system design, prototypes) while maintaining further development of potentially important options (dishes, wideband feeds, PAFs, AAs) need a balance between downselect and parallel development can we afford it all? do we need hard decisions (at the SPDO level) to make the project affordable, achievable and scientifically viable? 5-6 May 2009 AWG Meeting LAX3

AWG Meeting Outcomes An agreement for now-2012 time frame on work plan deliverables and key reports design review schedule overall schedule A detailed plan for realizing a prototype SKA antenna (outfitted with feeds and receivers) A clear understanding of what the prototype is for A second antenna type may be similarly deployed Prototype(s) likely will coexist with other options still on the table for project decisions Discussion of the proposal to deploy the antenna at the EVLA site for testing A picture of work plan in prior to phase May 2009 AWG Meeting LAX4