Presentation is loading. Please wait.

Presentation is loading. Please wait.

CoDR Scope Definition, Objectives & Agenda Jodrell Bank

Similar presentations


Presentation on theme: "CoDR Scope Definition, Objectives & Agenda Jodrell Bank"— Presentation transcript:

1 CoDR Scope Definition, Objectives & Agenda Jodrell Bank 11. 06
CoDR Scope Definition, Objectives & Agenda Jodrell Bank Tim Stevenson SPDO System Engineer

2 Scope & Objectives The review will consider whether the first order solutions that have been identified are indeed appropriate and will ensure that agreement is reached on the option(s) to be carried forward The aim of the Signal & Transport CoDR is to confirm that the ‘problem’ has been thoroughly explored and is well understood The desired outcome is a (perhaps conditional) release of the next phase of activity

3

4 The Review Panel is requested to consider the following questions:
1. Are the requirements complete, and sufficiently defined for this stage of the project? 2. At the concept level, is the element/subsystem presented capable of meeting the requirements? 3. Has interfaces to other aspects of the system have adequately identified and defined at this stage of the program? 4. Are the options proposed to be carried forward credible and are the presented data and information in support of each option credible? 5. Have all the necessary aspects of the specific element/subsystem been considered and addressed during the review or are there gaps and/or shortcomings? 6. Does the risk profile appear reasonably detailed and assessed for this stage of the program? 7. Do the stated risk controls and proposed mitigations appear reasonable and executable? 8. Is the overall plan (including the identification of the tasks, effort, resources, costs, schedule and risk mitigation needed) to complete the subsequent project phases credible?

5 Roles & Responsibilities
Panel: Review the documentation Raise questions, comments and queries before and during the review related to any part or aspect of the project Support the Chairman in the preparation of the External Review Panel Report Panel Chair (additionally): Organise and lead the External Review Panel Prepare and issue the External Review Panel Report, together with a list of the agreed Actions Observers: Provide written feedback with regards to any of the aspect (including the documentation) of the review after the review Facilitator The Facilitator shall support the panel chair by Keeping presenters to their allotted agenda time Adjusting the agenda according to the panel requests for changes Maintaining discussion focus on the CoDR scope and objectives Supporting the Panel Chair in editorial support for the generation a CoDR report

6 Agenda – Day 1 28th June 2011 11:30 Coffee available
Panel members internal briefing Closed Session 12:30 Lunch 13:30 Welcome, House Keeping & Meeting Logistics RMc 13:40 Welcome and Intro to the SKA project RTS 14:00 CoDR Scope definition, Objectives & Agenda TS 14:30 STaN in the context of PrepSKA WP2 & the PEP KC 15:00 Coffee Break 15:30 System Transport and Networks for the SKA 16:00 RF over fibre solutions for the SKA I PM (ASTRON) 16:30 RF over fibre solutions for the SKA II FP (INAF) 17:00 STaN for AIP PAFs SA (CSIRO) 17:30 Close

7 Day 2 June 29th 2011 9:00‐9:30 Coffee 9:30 Existing site Infrastructure, lessons from the precursors Venkat (Kat7); 9:50 SA (ASKAP Beta) 10:10 Configurations and site plans GH 10:30 11:00 Network Infrastructure Concept Description RMc 11:30 Timing & Synchronisation Concept Description STG (UMAN Questions 12:30 Lunch 13:30 Digital Data Back Haul Systems Context 13:50 Monitor and Control networks –existing systems CTS 14:10 Network Interfaces 14:30 15:00 Digital Data Back Haul ‐ COTs solutions (TBC) 15:30 Digital Data Back Haul – Custom built solutions CS 16:00 System Summary 17:00 Close

8 Day 3 June 30th 2011 9:00‐9:30 Coffee Available 9:00
Closed Panel Meeting Closed Session Wrap up & debrief with observers followed by a tour of the observatory (optional) Open parallel session STG to organise 12:00 Lunch 13:00 Panel Report & Feedback SD (Panel Chair) 14:00 Wrap up and close KC


Download ppt "CoDR Scope Definition, Objectives & Agenda Jodrell Bank"

Similar presentations


Ads by Google