22 May 2008Lynn Baker USSKA Consortia Meeting Washington, DC1 Project Manager, Responsibilities and Tasks –Coordination between groups within the TDP –Promote.

Similar presentations


Presentation on theme: "22 May 2008Lynn Baker USSKA Consortia Meeting Washington, DC1 Project Manager, Responsibilities and Tasks –Coordination between groups within the TDP –Promote."— Presentation transcript:

1 22 May 2008Lynn Baker USSKA Consortia Meeting Washington, DC1 Project Manager, Responsibilities and Tasks –Coordination between groups within the TDP –Promote and facilitate communication among separated groups –Assist coordination between TDP and PrepSKA –Promote collaboration between TDP and other research groups –Develop project planning documentation –Assist with reporting requirements to the NSF, PrepSKA, others –Provide a central repository for reports & minutes, web based –Oversight of budgets, schedules, project performance –Engineering responsibilities, especially antennas

2 22 May 2008Lynn Baker USSKA Consortia Meeting Washington, DC2 TDP Participation (to date) Direct TDP Funding: Caltech Cornell/NAIC MIT/Haystack SETI Institute U.C. Berkeley U. Illinois Management: Cornell/NAIC US SKA Consortium In-kind participation: JPL NRL NRAO U. New Mexico ATNF DRAO U. Calgary South Africa

3 22 May 2008Lynn Baker USSKA Consortia Meeting Washington, DC3 TDP Antennas Working Group Jack Welch (UCB) Chair Matt Fleming (Minex/SI) German Cortes (Cornell) Dean Chalmers (DRAO) Bill Imbriale (JPL) Roger Norrod (NRAO) Roger Schultz (Schultz Associates) Sandy Weinreb (Caltech) External: –Dave de Boer (ATNF/ASKAP) –Peter Dewdney (DRAO/SPDO) –Justin Jonas (MeerKAT) or proxy

4 22 May 2008Lynn Baker USSKA Consortia Meeting Washington, DC4 TDP Calibration and Processing Group Athol Kemball (UI, Chair) Geoff Bower (UCB) Jim Cordes (Cornell) Joe Lazio (NRL) Colin Lonsdale (MIT/Haystack) Steve Myers (NRAO) Joeren Stil (U. Calgary) Greg Taylor (UNM)

5 22 May 2008Lynn Baker USSKA Consortia Meeting Washington, DC5 TDP Project PathfindersPrepSKA AWGCPG Technological Interactions

6 22 May 2008Lynn Baker USSKA Consortia Meeting Washington, DC6 Interaction between AWG and CPG –Science data products result from CPG modeled algorithms –CPG results define the required antenna specifications –AWG provides feasibility and cost models of specifications –Rescoping of science goals leads to multiple antenna options –Early AWG work will focus on low cost design and fabrication

7 22 May 2008Lynn Baker USSKA Consortia Meeting Washington, DC7 AWG Major Objectives –Fabrication methods and designs to provide low cost antennas –Cost modeling of antennas to estimate optimum parameters –Provide broadband feeds and low noise receivers AWG Work Blocks –Reflector fabrication techniques, especially hydroforming –Antenna mounts, structural support of reflectors –Analysis of environmental effects, solar, gravitation, wind, climate –Reflector optical designs to achieve specifications –Cost modeling of antennas –Broadband feeds, potentially 10:1 bandwidth –Low noise amplifiers matched to feeds

8 22 May 2008Lynn Baker USSKA Consortia Meeting Washington, DC8 CPG Major Objectives –Feasibility of calibration and processing meeting science goals –Cost modeling WRT array and antenna parameters –Provide antenna specifications to AWG –Demonstrate algorithms on pathfinder data –Liaison with other calibration and processing groups CPG Work Blocks –Signal transport –Calibration algorithms –Imaging, spectroscopy, time domain imaging –Scalability and high performance computing

9 22 May 2008Lynn Baker USSKA Consortia Meeting Washington, DC9 AWG Meeting, March 2008 First meeting of the AWG and associated experts –Extended presentations from four pathfinder projects –Presentations on composite and hydroformed fabrication –Presentations on low noise receivers and broadband feeds –Presentations on reflector optics designs and tradeoffs –Conclusions from the meeting included in the AWG work plan CPG Organizational Meetings, March & May 2008 –Discussions of goals, work plans and required staffing –Status of recruitment for project

10 22 May 2008Lynn Baker USSKA Consortia Meeting Washington, DC10 TDP/AWG URL: http://skatdp.astro.cornell.edu/ CPG URL: http://rai.ncsa.uiuc.edu/SKA/RAI_Projects_SKA_CPG.html TDP Web Pages


Download ppt "22 May 2008Lynn Baker USSKA Consortia Meeting Washington, DC1 Project Manager, Responsibilities and Tasks –Coordination between groups within the TDP –Promote."