US Army Corps of Engineers BUILDING STRONG ® Gary Hinkle, PE June 10, 2014 Mid-West Electric Consumers Association Board of Directors Meeting Sylvan Lake,

Slides:



Advertisements
Similar presentations
Grant County PUD Plant Upgrades at Wanapum and Priest Rapids Dams
Advertisements

1 ELECTRICAL EQUIPMENT AND SYSTEMS – OFFSHORE AND ONSHORE FACILITIES MAIN ELECTRICAL EQUIPMENTS AND SYSTEMS INSTALLED  GENERATORS: MAIN GENERATORS – 12.
US Army Corps of Engineers BUILDING STRONG ® Mid-West Electric Consumers Association September 16, 2014 Corps of Engineers US Army Missouri River Mainstem.
PRESENTATION OF INDUSTRIAL TRAINING ON
BUILDING STRONG ® US Army Corps of Engineers BUILDING STRONG ® Portland & Walla Walla Districts Columbia-Snake River System Extended Navigation Lock Outage.
Little Falls Powerhouse Modernization Presented by Brian Vandenburg Avista Utilities, Spokane, WA.
FY Budget Presentation to Board of Finance March 31, 2014 SWPCA William P. Brink, Executive Director Rhudean Bull, Administration Manager.
Brushy Creek Municipal Utility District Water Facility Project Status Update Presented at April 9, 2009 Board Meeting Joseph Jenkins, P.E., CH2M HILL.
Seneca Overview & Generator Rewind
5-Year Capital Improvements Water Supply, Treatment and Distribution Water Treatment Plant #1 – Wells and Wellfields$ 500,000 –
SURATGARH SUPER THERMAL POWER STATION
The art of Engineering
HYDRO-ELECTRIC POWER PLANT Prepared by SREEJITH K. & NICE MENACHERY APME APME JEC JEC.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
 Industrial societies spend huge amounts of energy.  Much of it is supply by electricity which comes from generators in power stations.
Irfan Ahmed Operations Department
 Facts about wind power  How would it benefit the future?  Where can you find a wind turbine?  How does the wind turbine work?  A diagram of how.
INNOVATION MATTERS Vision: Striving to be number one company through innovation and customer satisfaction. Introduction: Wamco group.
Increasing the life cycle of existing grids to avoid high replacement costs of new systems By S.R.Sethi Member Delhi Electricity Regulatory Commission.
Power Plant Construction and QA/QC Section 7.4 – Hydroelectric Generators, Transformers and Controls Engineering Technology Division.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
We provide and maintain all utilities such as Electricity, Water, Waste Water, Heating and Cooling Services, Refuse Collection, and the Garrison Recycling.
Hydroelectric Power Plant -Turbine wheel consist of at least one moving part called rotor ( a shaft with blades attached ). -Moving fluid change pressure.
Auxiliary Power Supply System By CGS Gunasekara. Content Why auxiliary supply is needed ? Equipments supplied through auxillary. Modes of operation. Demonstration.
Western States Power Corp.
BUILDING STRONG SM Partnering and Coordination to Accomplish the Navigation Mission.
About Us  We are a group of Mechanical Engineers specialized in Construction & Engineering Services.  Our mission is to provide highest quality of construction.
ACADs (08-006) Covered Keywords Turbine Auxiliaries, Mechanical Systems, Gates, Cranes and Hoists. Description Supporting Material
Do Now: How much water, in cubic meters, is inside of all of the humans on the planet Earth???
TO WHOM IT MAY CONCERN We, N.P.E Co. the provider of technical services and man-power to the most power plant and factories in Iran with over 18 year.
Wood Group – an overview A global market leader in: - services for the oil & gas and power generation markets - deepwater engineering - enhancement.
A SEMINAR ON PRACTICAL TRAINING AT SURATGARH SUPER THERMAL POWER STATION.
US Army Corps of Engineers BUILDING STRONG ® Greg Mellema Hydropower Master Plan (HMP) Operations Division Omaha District 08 Dec 2015.
5-Year Capital Improvements Water Supply, Treatment and Distribution Water Treatment Plant #1 – Wells and Wellfields$ 500,000 –
US Army Corps of Engineers BUILDING STRONG ® Missouri River Basin Cooperative Plains Snow Survey Kevin Grode, P.E. Reservoir Regulation Team Lead Missouri.
US Army Corps of Engineers BUILDING STRONG ® Power Plant Uprate Brief Missouri River Mainstem Mid-West Board Meeting Gary Hinkle Omaha District June 2015.
August 2007 Booster RF Upgrades J.Reid Booster RF Upgrades West Gallery LCW modifications: – Headers in select locations to be upgraded by.
This project on Primary sub station of Visakhapatnam port trust at Visakhapatnam. It is 132kv/11kv substation with incoming feeder from APTransco and 11.
Presentation on:Governing of Pelton WheelTurbine
City Council March 4, Capital Improvement Plan 1/14/2014Budget staff sent CIP forms and instructions to divisions 1/28/2014Projects submitted.
Energy Huntsville Opportunity Report and Government Collaboration April 2016.
A resource that replenishes them selves through natural process within a human lifespan is a __________ resource. Nonrenewable Biomass Renewable Fossil.
City Council April 1, Capital Improvement Plan 1/14/2014Budget staff sent CIP forms and instructions to divisions 1/28/2014Projects submitted.
ROLL NO.ENROLLMENT NO.NAME MAKVANA DISHA R. GUIDED BY : PROF. R. JADAV.
1 Electric Utility Power Systems Generation of Electricity.
HYDRO POWER PLANT PRESENTED PRESENTED BY B.yedukondalu v.manikanta.
Approve Change Order No. 4 for the Caylor Wholesale Meter Modification Item 4B.
JSC UZBEKENERGOTAMIR A specialist enterprise with more than 45 years of experience in overhauling an maintenance. 1.
City Council March 6, Capital Outlay Priorities Infrastructure  Reconstruction of Bell St. from Concho River to Old Ballinger Hwy  Reconstruction.
National Organization of Minority Engineers Metropolitan Water Reclamation District of Greater Chicago June 30, 2016.
Solar Water heating System information card
Western States Power Corp.
Western States Power Corporation
Customer fund program update
CYLINDER BLOCK GROUP FIG 101
City of Whitehorse 2017 Capital Projects & Service Requirements Peter O’Blenes, P. Eng February 21,2017.
Sun City Lift Station Odor Control Improvements
UMCP Learning Objectives
RECLAMATION Power O&M Program Great Plains Region
Engineering Technology Division
District-Wide Well Maintenance, Rehabilitation, and Repair
RECLAMATION Power O&M Program Great Plains Region
Gas Power Plant - Layout and Operation
Mid-West Electric Consumers Association
Preparation of the activities for the LHC Long Shutdown 2
Reach 4 Air Valve Replacements Award of Construction Contracts
POWER FOR WATER: Meeting Infrastructure Needs
Lake Orion Community Schools Board Presentation
Director of Water Engineering
Project focus areas FY20+ Potential contract opportunities
Presentation transcript:

US Army Corps of Engineers BUILDING STRONG ® Gary Hinkle, PE June 10, 2014 Mid-West Electric Consumers Association Board of Directors Meeting Sylvan Lake, SD U.S. Army Corps of Engineers Omaha District Update

US Army Corps of Engineers BUILDING STRONG ® Customer Funded Projects Since 2004, 51 Projects Over $105M Past, Present & Future

BUILDING STRONG ® 3 Generators Big Bend Generator Rewinds - $24M Future: Preparation of Rewind Specifications; GP, FR, OA, FP

BUILDING STRONG ® 4 Garrison Rewind Autotransformer $1M Oahe Rehab GSU’s, Spare GSU, Containment $3.4M Oahe Parallel Autotransformer $3M Big Bend Rehab GSUs, Oil Containment $2.4M Gavins Point Replace GSUs $5.3M Future: Fort Randall Replace GSU Transformers $15M Transformers

BUILDING STRONG ® 5 Relay Replacements Line Relays $1M Big Bend Generator Relays $500K Fort Randall Generator Relays $500K Future: Fort Peck $400K, Misc Requests

BUILDING STRONG ® 6 Switchyards Gavins Point Breaker Replacement $1.5M Fort Randall – Switchyard Upgrades $15M Oahe – Switchyard Breaker Replacement - $4M Oahe – Switchyard Upgrades - $7.6M

BUILDING STRONG ® 7 Exciters Fort Randall Exciters, $5.5M Big Bend Exciters, $6.5M Oahe & Gavins Point Exciters; $6.5M

BUILDING STRONG ® 8 Gavins Point Vacuum Breakers $1M Oahe – SF6 Breakers - $3.5M Big Bend Unit Breakers - $4M Unit Breakers

BUILDING STRONG ® 9 Station Service Equipment Completed Station Service Rehabs at GA, BB, FP Requesting Station Service Rehabs at FR & GP Future Requests for Oahe

BUILDING STRONG ® Governors 10 Design Governor Upgrades $250K Governor Upgrades Supply Contract $2M Governor Installation $3M / Plant

BUILDING STRONG ® Mechanical Repairs 11  Oahe Generator Air Coolers $1.3M  Big Bend Bearing Oil Coolers / Shaft Sleeves / HP Oil Lift $800K  Fort Randall Penstock Packing; $525K  Gavins Point Trash Racks $80K  Unwatering Valves / Station Drainage, Big Bend & Fort Randall

BUILDING STRONG ® 12 Turbines Garrison Major Rehab Fort Peck Unit 2 Future: Fort Randall, Big Bend, Fort Peck, Gavins Point, Oahe

BUILDING STRONG ® 2015 Request - $16.3M  Station Service Breakers & Dry Type Transformers; (Gavins Point & Fort Randall)  Unwatering Valves, Raw Water Header, Drainage Piping (Big Bend & Fort Randall)  Replace Excitation Systems (Oahe & Gavins Point  Upgrade Governor Controls (GP, BB, OA)  New Designs (Fort Randall GSU Transformers, Generator 3 projects) 13

BUILDING STRONG ® Questions  Thank you. 14