PACS System Selection Methodology Rex Osborn 2004.

Slides:



Advertisements
Similar presentations
Integrated Healthcare Management system. Standards based design. [ Supports HXP (Health Exchange Protocol) a standard in exchanging health care data ]
Advertisements

Collaborative Picture Archiving & Communication System (PACS) Project SISU Medical Systems July 17, 2006.
1. 2 August Recommendation 9.1 of the Strategic Information Technology Advisory Committee (SITAC) report initiated the effort to create an Administrative.
Program Management Office (PMO) Design
Welcome to Game Lets start the Game. An electronic health record (EHR) is a digital version of a patient’s paper chart. EHRs are real-time, patient-centered.
Roadmap for Sourcing Decision Review Board (DRB)
OCD Internal and Education and Training Purposes Only A New Approach for You to Create Broader, Long-term Customer Engagements CL12092.
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
Course: e-Governance Project Lifecycle Day 1
BENEFITS OF SUCCESSFUL IT MODERNIZATION
Building the Right Business Case Eric Frantz Solution Consultant - Value Creation, QAD QAD Explore 2012.
<<replace with Customer Logo>>
ECM RFP 101 Presented by: Carol Mitchell C.M. Mitchell Consulting.
What IHE Delivers 1 Business models - sustainability IHE Australia Worhshop – July 2011 Peter MacIsaac & Paul Clarke.
Panorama Consulting Group LLC ERP Assessment, Selection, and Planning SAMPLE APPROACH.
Program Management Overview (An Introduction)
Capital Planning Update 1 Senate Fiscal Committee/COPE Presentation January 3, 2012.
Managing the Information Technology Resource Jerry N. Luftman
What Happens after You Sign with Missouri Health Information Technology Assistance Center?
Health Informatics Series
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
ECM Project Roles and Responsibilities
THE DICOM 2013 INTERNATIONAL CONFERENCE & SEMINAR March 14-16Bangalore, India DICOM Medical Image Management the Challenges and Solutions – Cloud as a.
> Blueprint Kickoff >. Introductions Customer Vision & Success Criteria Apigee Accelerator Overview Blueprint Schedule Roles & Responsibilities Communications.
© Copyright High Performance Concepts, Inc. 12 Criteria for Software Vendor Selection July 14, 2014 prepared by: Brian Savoie Vice President HIGH.
Basel Accord IITRANSITIONSERVICES Business Integration Support FCM Management Limited Paris New York Toronto.
UMT and Microsoft Presenting Tips and Tricks Basics What’s new in Microsoft Project 2010 Brian Feder, MBA, PMP Senior Vice President UMT Consulting Group.
September, 2005What IHE Delivers IHE Eye Care Integration Profiles Andrew Casertano Department of Veterans Affairs.
Revenue Cycle Management Medical Technology Acquisition and Assessment Team Members: Joseph Dixon, Michael Morotti, Mari Pirie-St. Pierre, David Robbins.
© 2010 Plexent – All rights reserved. 1 Change –The addition, modification or removal of approved, supported or baselined CIs Request for Change –Record.
QAD's Customer Engagement Dan Blake Consultancy Development Director, QAD QAD Explore 2012.
The Evergreen, Background, Methodology and IT Service Management Model
Success Principles in Integrated Delivery System.
SUBTITLE TEXT. Optimal Solutions What is E- Business Suite Oracle E-Business Suite is the most comprehensive suite of integrated, global business applications.
Server Virtualization: Navy Network Operations Centers
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
1 Our Expertise and Commitment – Driving your Success An Introduction to Transformation Offering November 18, 2013 Offices in Boston, New York and Northern.
Industrial Engineering Roles In Industry
State of Maine NASACT Presentation “Using the Business Case to Guide a Transformation Procurement” 1 Using the Business Case to Guide a Transformation.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
September, 2005What IHE Delivers 1 Mike Schmidt, Carl Zeiss Meditec IHE Eye Care Webinar Business Overview of IHE Eye Care June 6-7, 2006.
The Minnesota State Colleges and Universities system is an Equal Opportunity employer and educator. Information Technology Enterprise Strategic Investment.
普 华 永 道 Phase 1: Project Preparation Phase 1: Project Preparation Phase Overview Phase Overview.
National Picture Archive and Communication System Allan Somerville National PACS Project Team.
Unit 8.2: Effective Implementation Planning HIT Implementation Planning for Quality and Safety Component 12/Unit 81 Health IT Workforce Curriculum Version.
ORGANIZING IT SERVICES AND PERSONNEL (PART 1) Lecture 7.
Adoption and Use of Electronic Medical Records (in Federally Qualified Health Centers) and Supporting an ASP Community Care Network of Virginia, Inc.
Integrating the Healthcare Enterprise How to Purchase IHE Conformant Systems John Paganini Guardian Healthcare.
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
Healing Hospital North Shore, IL Vendor Selection for an Adverse Events Information System Imran Khan Project Manager Steven Stanford Chief Information.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
STRATEGIC PLAN FOR UPGRADES IN RADIOLOGY FOR REGIONAL HEALTH HOSPITAL BY: LADINA METZLER.
Budget Study Sessions Strategic Support Proposed Operating Budget OUTCOMES: - A High Performing Workforce that is Committed to Exceeding.
Collaborative Picture Archiving & Communication System (PACS) Project
What is the Best Way to Select an EHR
Systems Analysis and Design in a Changing World, 4th Edition
Information Systems Selection
Software Requirements
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
2 Selecting a Healthcare Information System.
By Jeff Burklo, Director
Managed Content Services
MAZARS’ CONSULTING PRACTICE Helping your Business Venture Further
Agenda Purpose for Project Goals & Objectives Project Process & Status Common Themes Outcomes & Deliverables Next steps.
Enterprise Resource Planning (ERP) Systems
Define Your IT Strategy
Agenda The current Windows XP and Windows XP Desktop situation
MAZARS’ CONSULTING PRACTICE Helping your Business Venture Further
{Project Name} Organizational Chart, Roles and Responsibilities
Presentation transcript:

PACS System Selection Methodology Rex Osborn 2004

Project Methodology We support a full spectrum of project activities. Plan Architect Integrate Optimiz e Requirements: Technical, Functional, Integration, & Process Clinical Scenarios Technology Selection and System Design Vendor Contracting Readiness Assessment Strategic Benefits Total Value Calculation / Financial Planning Executive Education Budget Approval Implementation Planning Implementation and Integration Process Improvement Baseline Administration Maintenance Reinvestment Process Improvement Measurement Optimize Redesign

Planning Plan Archite ct Integrate Operate Step 1. Assessment and Financial Planning

Link to Strategic Direction Project Objectives Strategic Direction Clinical Quality Enable Growth Service Excellence Physician Partnership Community Service Employer Of Choice Improve Patient Care and Satisfaction       Efficiently Read Multi-Image and Serial Studies      Increase Involvement in the Care Delivery Process Eliminate Unread Studies    Reduce Lost and Misplaced Films       Improve Report Turnaround Time     Provide Concurrent Access to Diverse Image Information     Easily Find Any Image, Anywhere Throughout the Healthcare System       Improve Physician Satisfaction      Integrated with EHR       Reduce Operational Costs     Plan

Many organization’s Vision is to provide their clinicians an integrated, “content-rich” point of care environment that transcends departments on a common workstation enabling timely access to a patient’s comprehensive clinical information for optimum diagnoses and treatment. Imaging is a significant portion of the required clinical information. Integrate with Overall IT Plan Plan

System Readiness Planning Focus AreaPlanning Steps Executive LeadershipCommitted to a structured approach: e.g. enterprise- wide planning, multi-year investment, policy that no departments can opt out. Physician Acceptance Physician project champions working with site coordinators who help educate the physician community on the benefits of PACS. Enterprise Connectivity Network enhancements are budgeted to provide an enhanced, reliable network and storage. Clinical IntegrationIntegration plans and system acceptance testing procedures. Data ConfidentialitySystems planning for user log-ins and passwords integrated with the EHR. Technology Obsolescence Contractually bind the vendor to upgrade PACS hardware and software - purchase workstation, network and storage separately from existing vendors System Implementation Have a dedicated project management and train PACS administrator's. Plan

Identify Success & Risk Factors FactorRisk Level Steps Executive LeadershipSustained commitment to a structured and disciplined approach against plan: program management, funding, purchasing, operating procedures. No departments opt out. Physician AcceptanceIdentify a physician project champions and site coordinators who will help educate the physician community on the benefits. Enterprise ConnectivityIncremental network enhancements are budgeted to provide an enhanced, reliable network and storage. Clinical IntegrationHave a solid contract with the vendor for system acceptance; bind system acceptance to final payment. Data ConfidentialityEnterprise systems support user log-ins and passwords and may be integrated with the EMR. Technology Obsolescence Contractually bind the vendor to upgrade hardware and software to keep the system current. Purchase workstation, network and storage separately for your existing vendors. System Implementation Have dedicated project management to deliver a successful implementation. M e d i u m L o w H i g h M e d i u m L o w H i g h M e d i u m L o w H i g h M e d i u m L o w H i g h M e d i u m L o w H i g h M e d i u m L o w H i g h M e d i u m L o w H i g h Plan

Establish High-Level Implementation Plan Plan

Calculate Financial Impact Plan Outflows Capital  DI/PACS System Core / Back-office User Equipment  Computed/Digital Radiography  Modality Upgrades  Infrastructure Upgrades  System Integration  Renovations  Vendor Services  Re-investment Operational  Support Staff  DI/PACS system maintenance  CR/DR maintenance  Network equipment maintenance  Incremental network cost Inflows Capital  Potential increase revenue Reduction in missed billings Increase in utilization Operational  Labor  Film  Film processing  Supplies  Storage space  Courier / Transportation

Sample-PACS Financial Model Plan

Step 2. Architect: Vendor Selection Architect the Solution Plan Archite ct Integrate Operate

Determine Priorities Architect

Selection - Sample Goals & Objectives To mitigate your risk during the vendor selection and contract negotiation process To ensure the selected solution meets requirements Provide investment protection to ensure investments in the solution are properly timed and aligned with an overall strategic vision Guarantee Integration to Enable Digital Workflow To arrive at a well-designed solution with preferred digital imaging vendors To develop a comprehensive contract that will set a strong foundation for both a successful implementation and long-term relationship between Bassett and the vendor To shorten the time-to- contract with the vendor Architect

Approach: Leverage the IHE* Standards Allows for focus on workflow solutions, not connectivity issues Lowers integration costs – implementation durations Minimizes custom interfaces – clearly defined interface owners Vendors representing 90% of the digital imaging market participate - RIS, CVIS, PACS, Modality, Web, Reporting, 3D Workstations, Voice Recognition Systems You get integrated information systems vs. information islands MPI ADT RIS PACS Modality Display HIS *Integrated Healthcare Enterprise Architect

Example: Selection Criteria  References  RFP Response  Clinical Visit  Visit Evaluation Functionality Technology Criteria Weight Definition Cost Experience Integration Vision Source  RFP Response  Clinical Site Visit Evaluation  References  RFP Response  Clinical Site Visit Evaluation  RFP Response  Vendor - Cost Benefit Models (RFP)  RFP Response  Demonstration  Functionality Coverage  Detailed Scenario Ratings  Overall Scenario Ratings  Application Maturity  Alignment with Vision  Shared integration approach  Vendor track record, IHE, CCOW  Customer Service  Implementation Depth, Methods  R&D Expenditures  Annual Contracts  Preliminary Cost Models  Implementation /Benefit Timing  Cost of Ownership  Technology Assessment, Ownership  Cost of Ownership  Technology Risk Assessment  Number/ Complexity of Integration 25% 15% 30% Architect

Example: Workflow Enablement Guarantee Proof of Concept Scorecard Architect

What’s in a Contract and Why Examples of Final Contract Exhibits, System Configuration, and Bill of Materials:  Terms and Conditions  Bill of Materials  License Software Module Schedule  System Requirements Compliance Matrix from RFP  Specifications and Acceptance Testing Protocols  Payment Schedule  Service Agreements  Project Milestones  Escrow Agreement  User Documentation  Original RFI/P/Q Response and Subsequently Issued Requirements & Specifications  Works in Progress Agreements Ensure common understanding and agreement to cost, performance, capacity, and scalability Minimize client risk associated with vendor terms and conditions, solution offerings, costs, and future product direction. Architect

Technology Selection Process Project Initiation Project Initiation Organize Selection Teams Organize Selection Teams Prepare and Distribute RFP Prepare and Distribute RFP Requirements Session Requirements Session Develop Requirements Workflow Analysis Develop Requirements Workflow Analysis Assess Against Current Vendors; Identify Benefits Prepare Scripted Scenarios Prepare Scripted Scenarios Analyze Vendor Responses Analyze Vendor Responses Vendor Responses Vendor Responses Conduct Vendor Demos Conduct Vendor Demos Conduct Reference Calls Conduct Reference Calls Recommend Vendor(s) Of Choice Recommend Vendor(s) Of Choice Executive Presentation and Approval Executive Presentation and Approval Final Approval Down Select to 2 Vendors Down Select to 2 Vendors Architect

For enterprise systems to be successful, standards are critical  Guarantee information flow which allows the organization to focus on workflow solutions, not connectivity issues  Less integration complexity and lower costs shorten implementation durations  Minimize custom interfaces and clearly define which vendor owns each integration boundary Using Standards in Selection *Integrated Healthcare Enterprise Architect

Prenuptials for Partnerships Terms and Conditions Referencing Exhibits:  Service Levels  Bill of Materials  Schedule of Software  Acceptance Testing Procedures  System Requirements and Performance Specifications  Project plan and Statements of Work Links to Payment  Service and Maintenance Agreements with Uptime Guarantees  Training Materials, Schedules and Documentation  The Original RFP Response  Product Roadmaps Goals  Ensure agreement - costs, project scope, system performance, capacity, and scalability  Understand and mitigate risk associated new product offerings and future product direction Architect

Integrate Plan Archite ct Integrate Operate Step 3: Integration & Implementation

Improvement Example "After organizing work flow to take maximum advantage of the capabilities inherent to PACS, we saw the number of steps involved in scheduling, producing, reading, reporting and billing a single chest radiographic study decrease from 59 to nine" "Clinicians are now able to quickly retrieve diagnostic images-in full fidelity with imaging reports at workstations we've deployed throughout the medical center," says Siegel. "Because we're saving them time, clinicians are able to focus more attention on patient care, delivering care that's of higher quality than ever before." – VA Hospital Baltimore Integrate

Driving Accountability Integrate

Resource Optimization Integrate

Project Timeline Implement, Operate, Optimize Board Approval for PACS Training Kickoff Softcopy Reading PACS Subnetwork “Live” Interface Design Modality Integration Archive Installed Database Preparation GO LIVE Acceptance Test Complete RFI Released Negotiations PACS RFP Released CR Workshop Contract/Re-quote Released PACS Vendor Selected Site Visits and Reference Checks DI Architecture, Selection Contract Complete Workflow Redesign Network Preparation Facilities Preparation Implementation Team Resource Checkpoint Pre- Implementation Planning “GO” Web Distribution Integrate PACS Planning FCG Engaged Network Assessment Staff Interviews Modality/ DICOM Assessment Current Environment Assessment Months

DI Transformation – Operate Plan Archite ct Integrate Operate Step 4. Operate: Transform & Operate