SLRIDT Site Background SLRIDT Site Remediation Activities (2006-2009) 2010 Tallas Island Winter Dredging  Options  Pros/Cons  Winter Dredging Activities.

Slides:



Advertisements
Similar presentations
The Committee and Research – Where are we and where might we be going?
Advertisements

1 Dredging Phases 4 phases –excavation –lifting –transportation –disposal Guide 4: Machines, Methods and Mitigation; Chapter 2: Phases of a Dredging Project;
UMR = Balance of Environment and Transportation 1. Pool # 8 - Environmental Management Project 2. Transportation Route – human habitation & settlement.
Building on a Landfill Celeste Manolas, Project Manager Santa Barbara County General Services Capital Projects.
Garbage- Past, Present, future. Review a Landfill Cons – Leachate – Vectors – Aesthetics Pros – Cheapest Method – Provides jobs Garbage overview.
Hub and Spoke Recycling Systems in North Carolina NC SWANA Fall Conference Rob Taylor NC Division of Environmental Assistance and Customer Service.
MINING. Overview StepsDescriptionEnvironmental Effects MiningRemoving mineral resources from the ground Mine wastes – acids and toxins Displacement of.
1 Hazardous Materials Response on Arizona’s Highways Presentation by Travis Qualls HazMat Response Specialist.
Community-Based Coastal Adaptation Planning Interim Local Area Report Findings Presenter name Date.
NYS Department of Environmental Conservation Jamaica Bay Marshlands & Spring Creek Stephen Zahn Deputy Regional Director NYSDEC Region 2 Public Meeting.
GIBSON ISLAND WATER SYSTEM CAPITAL IMPROVEMENT PROJECT Public Information Meeting June 5, 2012.
Hydroraking Sub-committee Dave McDonald Dana Dudley Ron PearsonTom Nowd Suzanna Dudley Bob Novacek Phyllis AndellaMario Andella Mike NaultJim LeBlanc March.
Northeast Corridor Greenway Acquisition City Council Workshop November 12, 2013.
Machine / TA Inspections Rick Weight Cashman Mining Field Service Supervisor Brett Avery Cashman Field Service Technician.
Wastewater Treatment & Collection System Improvements.
1 Great Lakes Maritime Task Force 14th Annual Informational Briefing for the Great Lakes Delegation Tom Buck, C.E.O. Carmeuse Lime and Stone April 2, 2009.
Copyright © 2014 All rights reserved, Government of Newfoundland and Labrador Earth Systems 3209 Unit: 5 Earth’s Resources Reference: Chapters 21; Appendix.
Wareham Fire District Water Department Glen Charlie Road Water Storage Tank Special District Meeting June 23, 2009.
Oil & Gas Issues. High Arctic: Challenges Protection the fragile natural landscape. Adjusting to the cold climate. Drilling on ice flows and small islands.
A division of Holcim (Canada) Inc. Public Information Session Proposed Extension of the Acton Quarry May 5, 2009.
Port Financial Management Challenges Financing Freight Transportation Improvements St. Louis, Missouri April 29 to May 2, 2001 Financing Freight Transportation.
Quyumta Community Sustainability Report Meeting Nelson Island.
Case study III. Requirement 1.Allow the user to grip the handle with hand so that the user can manipulate the dolly. 2.Be fastened on the dolly frame.
Alkali Creek Road Slope Stabilization and Stream Relocation The project scope changed after major rainfall caused slope failure jeopardizing safety and.
Overview of NLCA (b) Igloolik & Pond Inlet November 2011.
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Presentation for 2012 WEDA Midwest.
UNEP Training Resource ManualTopic 7 Slide 1 The purpose of mitigation is to: F find better ways of doing things F enhance environmental and social benefits.
April 29, 2015 Expanding World Language to Elementary Students.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
1 Safety & Health Management. One of the most important factors that should be taken in consideration in the site, (from engineering point view), is the.
CA Regional Water Quality Control Board San Diego Region CEQA SCOPING MEETING: TENTATIVE CLEANUP AND ABATMEMENT ORDER (CAO) NO. R January 21,
1Office of the Federal Coordinator for Meteorology OFCM OFCM Special Session: Challenges of Urban Test Beds Charge to the Joint Action Group for Joint.
Environmental Dredging of Perfluorochemical-Impacted Sediment from a Sensitive Wetland Mark A. Gaetz (3M) Paul Lear (WRScompass)
Consideration of Brownfields and Contaminated Properties During NEPA 2014 Real Estate Workshop.
2014 Budget Overview May 6, 2014 Elizabeth Savill, Chief Administrative Officer Jennifer Moore, Director of Finance/ Treasurer 1.
Nuclear Power Plant Hearing Combined Construction Permit and Operating License.
Mitigation and Impact management
Harbors Module NH3: Formulation – Measures, Strategies and Plans.
Elk Island Public Schools Fort Saskatchewan Boundary Review Elk Island Public Schools Fort Saskatchewan Boundary Review November 19 & 25, 2015 Board of.
Formative assessment of the Engineering Design process Review questions in handout Write brief, informal answers to each question.
Increase Capacity of: Seaport Major Roadways Utility Services Improve the Mass Transit System Revision of Construction Regulations Labor Camps and the.
Pine Mountain Lake Dredging Project Moffatt & Nichol Project Engineers Cooper Crane & Rigging, Inc. Contractor The Right Contractor Adaptability Communication.
Petroleum Development Corporation Garden Gulch Access Road.
Item Th11b San Diego Gas and Electric Substation Relocation Project Chula Vista, San Diego County.
Business Travel and the Sharing Economy
What would green freight look like? What are our options? Rail ownership, capacity issues Barge ownership, capacity, access, applicability issues Truck.
The Climate Action Task Force’s Transportation Workgroup October 16, 2008 FacOps Conference Room B.
ECNM Meeting October 1, Project Purpose The purpose of the US 53 project is to address the termination of the 1960 easement agreement that affects.
Roadex meeting 2016, Oslo Challenges and activities with low volume roads management in Estonia Taavi Tõnts Estonian Road Administration / Leading engineer.
FHWA CMGC Workshop October 23, Project Purpose The purpose of the US 53 project is to address the termination of the 1960 easement agreement that.
SYSTEM MANAGEMENT PERFORMANCE MEASURES, RANKING AND PRIORITIZATION CORRIDOR MANAGEMENT PLANS INCORPORATION INTO STIP & TIP STRATEGY IMPLEMENTATION MONITOR.
What does a Civil Engineer do?
1 Tunnel –v- Surface Routes A UK perspective from Alan Dyke Former MD Channel Tunnel Rail Link Project.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
111 Area-Wide Planning, Superfund Sites, Environmental Justice and Green Infrastructure: Tying it All Together in the Freeport Community Planning Project.
Port of Long Beach CEQA/NEPA Process Rick Cameron 2010 Tenant Orientation.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
Adams County Oil & Gas Traffic Impact Study
Curbside Waste Collection on Private Roads
St. Louis District Biological Opinion RRAT
Hung Shiu Fung, Thomas Fischer
Draft Transportation Element September 6, 2017
Truck Transport Services By KSA Truck Transportation Services Trucksi provides trucks and load transport services by road, the weight.
Truck Transportation Services By Trucksi
Truck Transportation Trucksi
Patti Caswell ODOT Maintenance and Operations Branch October 2017
What’s that smell? Expanding the boundaries of the industrial hygienist Tina Berceli-Boyle, P.E.
Cycle Kerb Product Presentation
Dust Control & Soil Stabilization in Alaska
Facilitate differentiation of Purpose
Presentation transcript:

SLRIDT Site Background SLRIDT Site Remediation Activities ( ) 2010 Tallas Island Winter Dredging  Options  Pros/Cons  Winter Dredging Activities  Challenges Experienced  Project Benefits Overview

SLRIDT Site Background

SLRIDT Site Remediation 2006

SLRIDT Site Remediation 2007

SLRIDT Site Remediation 2008

SLRIDT Site Remediation 2009

2010 Tallas Island Compensatory Mitigation Project

2010 Tallas Island Compensatory Mitigation Project

2010 Tallas Island Compensatory Mitigation Project

Options….. DDredge and Transport via Barge DDredge and Transport via Over-the-Road Trucks DDredge and Hydraulic Transport Tallas Island Winter Dredging

Pros  Expedite 2010 Construction Schedule  Minimizes Environmental Impacts  Minimizes Community Nuisances  Allows Shallow Draft Dredge Equipment Access  Cost savings Tallas Island Winter Dredging

Cons  Potential Hazards of On-Ice Dredge Work  Schedule Constraints  Temperature Dependent  Vegetation Segregation Tallas Island Winter Dredging

Challenges Experienced Tallas Island Winter Dredging

Unseasonably Mild Temperatures Tallas Island Winter Dredging

On-Ice Construction Safety Hazards Tallas Island Winter Dredging

Frost Road Construction Tallas Island Winter Dredging

Segregation of Vegetative Root Mass from Ice Tallas Island Winter Dredging

Thin Ice Experiences Tallas Island Winter Dredging

Extreme Working Conditions Tallas Island Winter Dredging

Project Benefits  Flexible 2010 Construction Schedule  Minimized Environmental/Community Impacts  Expedited Other SLRIDT Work Activities  Monetary Impact  Restoration of the Surrounding Environment Tallas Island Winter Dredging

Special Thanks To: