14 Ventilation Skill Drills. 2 Objectives (1 of 2) Break glass with a hand tool. Break a window with a ladder. Break windows on upper floors using the.

Slides:



Advertisements
Similar presentations
Ground Ladders.
Advertisements

35 FOOT LADDER 3 PERSON.
Report # Captain escapes injury from chainsaw. Report Number: Report Date: 06/04/ :16.
Interior Wall and Ceiling Finish
Take Ladder Safety One Rung at a Time
CVFD Training – Ladder Practices
Power Tools Safety. Portable Circular Saws Stock must be well supported in such a way that the kerf will not close and bind the blade.. Thin materials.
TWO (2) Installation principles 1. Cabinets need to be installed straight, plumb, and level. 2. The area you are working in is rarely straight, plumb,
2 Fire Fighter Qualifications and Safety Skill Drills.
Ropes and Knots Skill Drills.
Portable Power Tool Safety. Portable Electric and Cordless Drill Be sure the electric drill is disconnected from the power source before installing bits.
Cutting With a Jeweler’s Saw
Strain Prevention Name Job Title Phone Number Address.
North Idaho Emergency Services Academy. Objectives Types of fire service laddersTypes of fire service ladders Ladder termsLadder terms Ladder raising.
11 Forcible Entry Skill Drills. 2 Objectives (1 of 3) Force entry through an inward-opening door. Force entry through an outward-opening door. Use the.
FVCC Fire Rescue Ventilation Part A Truck Company Operations Review of Ventilation Principles & Practices.
CHAPTER 14 LADDERS Copyright© Delmar is a division of Thomson Learning.
OSHA Office of Training & Education
Ladder Safety Training
Ladders Can take you… to great heights or on a quick trip to the ground.
Climbing the Ladder to Safety
Ladders Skill Drills.
CHAPTER 14 Copyright © 2007 Thomson Delmar Learning 14.1 Ladders.
Stairways and Ladders.
1 Telecom Cabling Ladder safety. 2 OSHA Office of Training & Education ation Telecom Cabling Stairways and Ladders.
Fall Protection and Ladder Safety Training. Course Outline  Introduction  Fall Protection  Ladder Safety  Wrap-up.
LADDER & STAIRWAY SAFETY
FVCC Fire Rescue LADDERS.
CVFD Training – Ladder Practices SFFMA Training Objectives –
4/19/2017 Ground Ladders Brantley County Firefighters Association Monthly Training Conducted by the Atkinson Volunteer Fire Department December 2008 Atkinson.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
2- BODY WEIGHT SQUATS: Feet shoulder width apart, hands behind head with fingers locked. Lower body until top of thighs are parallel to the floor. Maintain.
Salvage Operations Henderson Truck Company Manual.
Machine Guarding.
2006 Hand and Power Tool Safety Basic Rules for Rube Goldberg Competition,
FVCC Fire Rescue Ventilation Part B. Types of Ventilation Horizontal Ventilation: Use of doors and windows to ventilate across the floor of a building.
To make employees aware of potential hazards and methods for operating small-engine equipment safely.
Ventilation Tools Firefighter I. Copyright and Terms of Service Copyright © Texas Education Agency, These materials are copyrighted © and trademarked.
14’ Roof Ladder Beam Raise Level I 4/1/12. Introduction This presentation demonstrates the basic operation of a one person beam raise. The evolution begins.
12 Ladders Skill Drills. 2 Objectives Perform one-, two-, three- and four-FF carries. Perform one-, two-, three- and four-FF raises. Tie the halyard.
Search and Rescue Skill Drills.
Table Saw Safety & Operation The Table Saw is one of the most versatile pieces of equipment but must be operated safely and correctly. Follow these safety.
Table Saw. General Safety Wear your safety glasses at all times Take off all jewelry Do not wear loose clothing Make sure you are the only person in the.
11 Forcible Entry Skill Drills. 2 Objectives Force entry through inward- and outward- opening doors. Use the triangle method to open an overhead garage.
18 Salvage and Overhaul Skill Drills. 2 Objectives Perform the one- and two- fire fighter salvage cover folds. Fold and roll a salvage cover. Perform.
21 Fire Suppression Skill Drills. 2 Objectives Apply water using the direct, indirect or combination attack. Use a large handline using the one- or two-
Structure Fire Ventilation Making firefighting easier.
Ropes and Knots Skill Drills.
State of Georgia BASIC FIRE FIGHTER TRAINING COURSE
35’ Ladder Beam Raise Two Person Level I 4/1/12. Introduction This presentation demonstrates the basic operation for a two person beam raise. The evolution.
Aerial Apparatus Operator
Ventilation Skill Drills.
Ladders Module 2. Introduction The fire service ladder is one of the most basic fire fighter tools. Ladder technology has not changed much over the years.
General Safety Foundations of Engineering and Technology I.
BACK SAFETY & SAFE LIFTING Bureau of Workers’ Comp PA Training for Health & Safety (PATHS) 1PPT
Safety on Call LADDER SAFETY. Safety on Call LADDERS CAN TAKE YOU… To great heights or on a quick trip to the ground.
Search and Rescue Skill Drills.
Structure Fire Ventilation
General Safety Foundations of Engineering and Technology.
Write down three safety rules we talked about in the past few days. Talk with someone near you and see how many ways are out there to lift a car for service.
Perspective Drawings Linear perspective is a geometric method of representing the apparent diminishing of scale as the distance from object to viewer increases.
Aerial Lift Safety Today, we’re going to talk about aerial lift safety. You may know this type of equipment by commonly used names such as “cherry pickers”
Learning Objective 7 Describe the types of vertical ventilation.
3 PERSON PERPENDICULAR RAISE LD35’-2
STRAIGHT ARM WALL LADDER RAISE LD16’-4
STRAIGHT WALL LADDER OVERHEAD RAISE LOW SHOULDER CARRY
SAN BERNARDINO COUNTY FIRE VERTICAL VENTILATION TECHNIQUES
Power Tool Safety Don’t operate a machine until:
FVCC Fire Rescue LADDERS PART B.
North Carolina Fire & Rescue Commission Ladders I Updated 9/2011
Presentation transcript:

14 Ventilation Skill Drills

2 Objectives (1 of 2) Break glass with a hand tool. Break a window with a ladder. Break windows on upper floors using the Halligan toss. Establish negative-pressure ventilation. Establish positive-pressure ventilation. 14

3 Objectives (2 of 2) Sound a roof. Operate a power saw. Perform a rectangular cut. Perform a louver cut. Perform a triangular cut. Perform a peak cut. Perform a trench cut. 14

4 Skill Drill 14-1 Breaking Glass with a Hand Tool Step 1: Position yourself to the side of the window. Step 2: With back against the wall, swing backward forcefully with the tip of the tool striking the top 1/3 of the glass. 14

5 Skill Drill 14-1 Breaking Glass with a Hand Tool Step 3: Clear remaining glass from the opening with the hand tool. 14

6 Skill Drill 14-2 Break a Window with a Ladder 1.Wear full personal protective equipment, including eye protection. 2.Select the proper size ladder for the job. 3.Check for overhead lines. Use standard procedures for a ladder raise utilizing one, two, or three fire fighters, depending on the size of the ladder. 14

7 Skill Drill 14-2 Break a Window with a Ladder 4.If a roof ladder is used, extend the hooks toward the window. 5.Raise the ladder next to the window. Extend the tip so it is even with the top third of the window. 6.Position the ladder in front of the window. 14

8 Skill Drill 14-2 Break a Window with a Ladder 7.The ladder is forcibly dropped into the window. 8.Exercise caution; falling glass can cause serious injury. Glass may slide down the beams of the ladder. 9.Raise the ladder from the window and move it to the next window to be ventilated. Either carry the ladder vertically or pivot the ladder on its feet. 14

9 Skill Drill 14-3 Breaking Windows on Upper Floors— Halligan Toss Step 1: Lower the Halligan tool over the edge of the roof to measure the distance. Step 2: Toss the Halligan tool over the roofline so that it swings back to break the glass

10 Skill Drill 14-4 Negative-Pressure Ventilation Step 1: Hang the fan in the upper part of the opening. 14

11 Skill Drill 14-4 Negative-Pressure Ventilation Step 2: Use salvage covers to prevent churning. Provide openings on the windward side for cross ventilation. 14

12 Skill Drill 14-5 Positive-Pressure Ventilation Step 1: Place the fan in front of the opening to be used for attack. Step 2: Provide an exhaust opening at or near the fire. 14

13 Skill Drill 14-5 Positive-Pressure Ventilation Step 3: Start fan and allow smoke to clear. 14

Skill Drill 14-6 Sounding a Roof Step 1: Use a hand tool to check the roof before stepping onto it. 14

15 Skill Drill 14-6 Sounding a Roof Step 2: Use the tool to sound ahead and to both sides as you walk. Locate support members by sound and rebound. Check conditions around your work area periodically. 14

16 Skill Drill 14-6 Sounding a Roof Step 3: Sound the roof along your exit path. 14

17 Skill Drill 14-7 Operating a Power Saw 1.The saw should always be checked during daily apparatus inspection. 2.Be sure the cutting device or blade is appropriate for the material anticipated. If it is not, put the correct blade on before going to the roof. 3.Briefly inspect the blade or chain for obvious damage. 14

18 Skill Drill 14-7 Operating a Power Saw 4.Ensure that your proper protective gear is in place, including eye protection, SCBA, and full personal protective equipment. 5.The saw should be started to ensure that it runs properly before going to the roof. Set the choke to halfway position, or as recommended by the manufacturer. 14

19 Skill Drill 14-7 Operating a Power Saw 6.Stay clear of any moving parts of the saw, use a foot or knee to anchor the saw to the ground, and pull the starter cord as recommended to start the saw. 7.Run the saw briefly at full throttle to verify power operation. 8.Shut the saw down, wait for the blade to stop completely, then carry the saw to the roof. 14

20 Skill Drill 14-7 Operating a Power Saw 9.If possible, always work off of a roof ladder or aerial platform for added safety. 10.Start the saw in an area slightly away from where you intend to cut. 11.Always run a saw at maximum throttle when cutting. The saw should be running at full speed before the blade touches the roof decking. Keep the throttle fully open while cutting and removing the blade from the cut to reduce the tendency for the blade to bind. 14

21 Skill Drill 14-8 Rectangular or Square Cut Step 1: Locate the roof supports by sounding. Make the first cut parallel to the roof support. Step 2: Make a triangle cut at the first corner. 14

22 Skill Drill 14-8 Rectangular or Square Cut Step 3: Make two cuts perpendicular to the roof supports (3 and 4). Then make the final cut parallel to another roof support (5). Step 4: Pull out or push in the triangle cut. 14

23 Skill Drill 14-8 Rectangular or Square Cut Step 5: Punch out the ceiling below. Be careful for a sudden updraft of hot gases or flames. 14

24 Skill Drill 14-9 Louver Cut Step 1: Locate the roof supports by sounding. Step 2: Make two parallel cuts perpendicular to the roof supports. 14

25 Skill Drill 14-9 Louver Cut Step 3: Cut parallel to the supports and between pairs of supports in a rectangular pattern. Step 4: Tilt the panel to a vertical position. 14

26 Skill Drill Triangular Cut Step 1: Locate the roof supports. 14

27 Skill Drill Triangular Cut Step 2: The first cut is made from just inside a support member in a diagonal direction toward the next support member. 14

28 Skill Drill Triangular Cut Step 3: The second cut begins at the same location as the first, and is made in the opposite diagonal direction, forming a “V” shape. 14

29 Skill Drill Triangular Cut Step 4: The final cut is made along the support member and connects the first two cuts. Cutting from this location allows fire fighters the full support of the member directly below them while performing ventilation. 14

30 Skill Drill Peak Cut 1.Sound the roof with a tool to locate the roof supports. 2.Clear the roofing materials away from the roof cap. 3.Make the first cut vertically, at the furthest point away. Start at the roof peak in the area between the support members and cut down to the bottom of the first plywood panel 14

31 Skill Drill Peak Cut 4.Make parallel downward cuts between supports, moving horizontally along the roofline to make additional ventilation openings. 5.Strike the nearest side of the roofing material with an axe or maul, pushing it in, using the support located at the center as a fulcrum. 14

32 Skill Drill Peak Cut 6.This causes one end of the roofing material to go downward into the opening and the other to rise up. 7.This process can be repeated on both sides of the peak, horizontally across the peak, or vertically toward the roof edge. 8.Open the interior ceiling area below the opening by using the butt end of a pike pole. This hole should be the same size as the vent opening made in the roof decking. 14

33 Skill Drill Trench Cut Step 1. Make two parallel cuts, 2' to 4' apart, across the entire roof, starting at the ridge pole (for peaked roofs) or a bearing wall (for flat roofs). Cut between the two long cuts to make a row of rectangular sections. Remove the rectangular panels to open the trench. 14