CITY OF LEANDER June 10, 2013 Williamson County Bond Projects 2014-15 Requests.

Slides:



Advertisements
Similar presentations
Prince William County Government Prince William County Department of Transportation Road Program DATA June 23, 2010.
Advertisements

Dulles Corridor Metrorail Project Status Update Fairfax County Transportation Advisory Commission November 16, 2010 Richard Stevens Fairfax County Department.
County of Fairfax, Virginia Department of Transportation Board Four Year Transportation Plan 2013 to 2016 Board Transportation Committee June 12, 2012.
Previously Evaluated Alternatives Out of Corridor October 2005.
1. Larger regional parks Nature based and exploratory parks County trails that connect with City trails Projects consistent with adopted County Plan 2.
Williamson County Bond Program: City of Georgetown PARKS ELEMENT – –Hike and bike trail expansion from Bootys Road Park to Williams Drive along Bootys.
ITE Luncheon February 26, 2014 $825 MILLION PLAN.
January 23, El Dorado County Development Projects 1.Carson Creek (D1) 2. Blackstone/Valley View (D2) 3. El Dorado Hills Business Park (D3) 4. Clarksville.
Proposed Significant Additions and Changes for the 2010 CLRP Public Comment Release April 15, 2010 National Capital Region Transportation Planning Board.
Meeting Name Date. Agenda Introductions Transportation Funding 101 Program Development Process Program Projects Strategic Funding Tax Rate Implications.
Titusville to Edgewater Bike Loop PD&E Study
Pecan Plantation Emergency Evacuation Routes. Pecan Plantation Comanche Peak Nuclear Plant Quicksilver Gas Plant Comanche Peak Evacuation Zones Plan calls.
Capital Improvement Program City of Warren, Ohio April 2012.
Dulles Corridor Metrorail Project 23-mile new Metrorail line branching off the Orange Line after East Falls Church 11 new stations 5 in Phase 1: East Falls.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Jacobs Sverdrup Conference Center 1500 Perimeter Parkway Suite 100 Huntsville, AL USA From Huntsville Airport: Take I-565 East (toward Huntsville) to Exit.
Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.
NTTA Expansion Program ASCE January Luncheon Meeting Delivering Mobility Gerry Carrigan Assistant Executive Director of Project Delivery North Texas Tollway.
1. 2 Anderson Mill Rd New Hope Drive Little Elm Trail Whitestone Blvd.
I-95/Pioneer Trail Interchange
City of Palm Coast- Flagler County Transportation Impact Fees City Council-Flagler County Commission Workshop.
Golden Triangle Blvd. Progress Report March 27, 2007.
Route 364 (Page Ave. Extension) The Missouri Department of Transportation.
Interlocal Agreement – Transportation Impact Fees City Council Workshop July 9, 2013.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
WESTERN CARY WATER STORAGE TANK Town of Cary Preliminary Engineering Report Progress Meeting June 8, 2015.
Krum Amtrak Stop Status September 21, 2010 Mayor Terri Wilson Krum, TX.
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
JUNE 19, 2012 BCC APPEAL HEARING ON BZA #SE , April 5, 2012 APPLICANT/APPELLANT: TONY RAHBANY.
Comprehensive Transportation Plan Burnet County Transportation Plan Overview Presented to Burnet Transportation Committee on June 18, 2008 by Brian.
2006 Capital Improvement Budget  Capital Improvement Plan to Capital Improvement Budget  Receive further direction  Property Tax Projects  Parks and.
Proposed Significant Additions and Changes for the 2010 CLRP As Approved by the TPB on May 19, 2010 National Capital Region Transportation Planning Board.
Texas Transportation Commission October 25, 2012.
Comprehensive Update on Indian Trail Infrastructure Plan September 8, 2015.
ORANGE COUNTY TRAFFIC MANAGEMENT SYSTEM FEBRUARY 13, 2007.
Phase 2: 30% Design Plans September 4 th, 2012.
0 Regional Measure 2: Capital Program Update May 12, 2010 Programming and Allocations.
VOLUSIA TRANSPORTATION PLANNING ORGANIZATION (TPO) NOVEMBER 27, 2012 Craig Coffey, County Administrator 1.
FY Budget Worksession Parks & Recreation Division July 13, 2015.
2012 ACEA MEETING ORANGE BEACH Brad Lindsey, P.E. Assistant State County Transportation Engineer – Pre Construction Alabama Department of Transportation.
Lawton Fort Sill Regional Airport Lawton Airport Industrial Park U.S. Hwy 81 I Approx. Acres (Total)
Regional Transportation Committee (RTC) 10-Year Project Milestone Policy Transportation and Trinity River Project Committee October 26, 2015.
Road Update October 19, Lebanon Road (FM 423 to Presidents) START: 1/08 COMPLETE : 7/09.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
INTERNATIONAL DRIVE CRA Modification to Community Redevelopment Plan September 1, 2009.
PHASE 2 Public Information Meeting Site Selection Analysis for Central Texas January 27-28, 2004.
2040 Long Range Transportation Plan for River to Sea TPO CAC and TCC Meetings May 19, 2015.
Interlocal Agreement – Transportation Impact Fees City Council Meeting July 16, 2013.
Transportation Projects City Council Workshop May 14, 2013.
Metropolitan Council 1 Twin Cities Region Transportation Policy Plan Nacho Diaz Metropolitan Council Evaluating Economic and Community Impacts of Transit.
Program Manager Administrator
VOLUSIA TRANSPORTATION PLANNING ORGANIZATION (TPO) OCTOBER 23, 2012 Craig Coffey, County Administrator 1.
Proposed TIF-Funded Road Improvements: TIF 7 North Tarrant Parkway Presented by Jay Chapa, Assistant City Manager April 12, 2016.
ITEM 9B Authorize a Commercial Developer Agreement with Keller Watermere, L.P., for South Village at Watermere, located south of West Southlake Boulevard.
TxDOT Street Projects Eldorado Parkway Widening FM423 North Widening Oak Grove Pkwy (FM 720) US 380 Widening (from Denton to Collin County line)
Financing Options I. Bond Issues 1. General Obligation 2. Leasehold Revenue 3. Certificates of Participation (COPs) II. State DNR SRF/Grant Program Revenue.
Transportation Program (Infrastructure) Presentation Board of Aldermen Work Session February 29, 2012.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Innovation North-Side Neighborhood Access Feasibility Study
NC Division of Water Infrastructure Drinking Water Grant
FY 2012 Status Report on the North Mainland (Ormond Crossings CRA)
WEST & EAST DISTRICT PROJECTS PRESENTATION
Kerr Tar Project Update – June 2016
Transportation CIP Update
Real Estate with a Servant’s Heart ®
LEGISLATIVE BRIEFING SERIES
US 1 Project “A” FM No.: Work Mix: Intersection Improvement At: Park Ave. Phase: Design Year Funded: 2020 Cost: $200,000.
2020 RTP Update - Proposed Changes to Transit Projects
Presentation transcript:

CITY OF LEANDER June 10, 2013 Williamson County Bond Projects Requests

Williamson County Bond Projects CITY OF LEANDER Trails Requests June 10, 2013

Bagdad Heritage Trail Continuation Phase One TxDOT STP Grant $1.2 million Williamson County Bond Projects Trails Bagdad Heritage Trail Continuation Phase One TxDOT STP Grant $1.2 million Bledsoe Park Crystal Falls Pkwy Proposed Trail to connect existing Heritage Trail (constructed in 2006 T-21 grant) at Bledsoe Park to Crystal Falls Parkway Bagdad Road TOTAL PROJECT$900, WILCO Request (80%)$720, City Match (20%)$180, PRIORITY 1

Bagdad Heritage Trail Continuation Phase One TxDOT STP Grant $1.2 million Williamson County Bond Projects Trails Bagdad Heritage Trail Continuation Phase One TxDOT STP Grant $1.2 million Proposed Trail to connect existing Heritage Trail at Bledsoe Park to Crystal Falls Parkway TOTAL PROJECT$900, WILCO Request (80%)$720, City Match (20%)$180, PRIORITY 1

183A/Metro Trail Williamson County Bond Projects Trails 183A/Metro Trail Proposed Trail to connect existing 183A Trail to Metro Station to Hwy.183 Approx ft Hero Way Mel Mathis Blvd FM 2243 Capitol Metro Station HWY 183A Hwy 183 TOTAL PROJECT$600, WILCO Request (80%) $480, City Match(20%)$120, PRIORITY 2

Williamson County Bond Projects CITY OF LEANDER Roadways Requests June 10, 2013

Hero Way East and West Williamson County Bond Projects Roadways Hero Way East and West Proposed Roadway Improvements connect from Reagan Blvd to Lakeline Extension FM 2243 Hero Way Crystal Falls Pkwy Reagan Blvd FM 2243 HWY 183A HWY 183 Lakeline Extension Bagdad Rd TOTAL PROJECT (PH 2)$9,000, WILCO Request (50%)$4,500, City Match(50%)$4,500, TOTAL PROJECT (PH 1)$17,000, WILCO Request (50%)$8,500, City Match (50%)$8,500, PHASE ONE PHASE TWO PRIORITY 1

Hero Way West Williamson County Bond Projects Roadways Hero Way West Proposed Roadway Improvements connect from Reagan Blvd to Lakeline Extension Western Phase heavily constrained with utility lines and open drainage PRIORITY 1

Hero Way East Williamson County Bond Projects Roadways Hero Way East Proposed Roadway Improvements connect from Reagan Blvd to Lakeline Extension PRIORITY 1

Bagdad Road North Williamson County Bond Projects Roadways Bagdad Road North Proposed Roadway Improvements from FM2243 to CR 280 CR280 FM2243 San Gabriel Pkwy Halsey Dr Collaborative Way High School #6 TOTAL PROJECT $9,000, WILCO Request (50%)$4,500, City Match (50%)$4,500, PRIORITY 2

Bagdad Road North Williamson County Bond Projects Roadways Bagdad Road North Proposed Roadway Improvements from FM2243 to CR 280 TOTAL PROJECT $9,000, WILCO Request (50%)$4,500, City Match (50%)$4,500, PRIORITY 2

San Gabriel Parkway Williamson County Bond Projects Roadways San Gabriel Parkway Proposed Roadway Improvements from CR170 to Reagan Blvd. CR170 San Gabriel Pkwy Reagan Blvd Kittie Hill Airport TOTAL PROJECT $7.500, WICO Request (50%)$3,750, City Match (50%)$3,750, A PRIORITY 3

San Gabriel Parkway Williamson County Bond Projects Roadways San Gabriel Parkway Proposed Roadway Improvements from CR170 to Reagan Blvd. TOTAL PROJECT $7,500, WICO Request (50%)$3,750, City Match (50%)$3,750, PRIORITY 3

CITY OF LEANDER June 10, 2013 Williamson County Bond Projects Requests Summary Trails Total$1,500, Wilco$1,200, (80%) City$300, (20%) Roadways Total$42,500, Wilco$21,250, (50%) City$21,250, (50%) Combined Total$44,000, Wilco$22,450, (51%) City$21,550, (49%)