Presentation is loading. Please wait.

Presentation is loading. Please wait.

LEGISLATIVE BRIEFING SERIES

Similar presentations


Presentation on theme: "LEGISLATIVE BRIEFING SERIES"— Presentation transcript:

1 LEGISLATIVE BRIEFING SERIES
presented to Alamo Area Legislative Delegation presented by Diane Rath Executive Director May 14, 2018

2 ALAMO REGION

3 CONNECTIVITY CORRIDORS
March, 2017

4 SAN ANTONIO DISTRICT RURAL FUNDING

5 2018 UTP TxDOT/AAMPO Mobility Funding Categories
Congestion and Connectivity Funding Program Areas 10-Year Statewide Funding ($ Million)* 10-Year Allocation (SAT) ($ Million)(1) Un-programmed Amount ($ Million) (1) Category 2 – Metro & Urban Corridor Funding (MPO) $ 12,152 $1,192 $ 93 Category 4 Urban - Connectivity Corridor Congestion (3C) (TxDOT) $ 5,082 $485 $ 229 Category 12 – Texas Clear Lanes (TxDOT) $ 4,898 $629 $ 142 (2) Category 4 Rural - Rural Connectivity Corridors (TxDOT) $6,399 $5 $2,430 (Statewide Unallocated) (2) Category 12 – Strategic Priority (TxDOT) $5,100 $178 $3,086 Total $ 33,631 M $2,500 M $635 M (SAT) $5,516 M (Statewide) (1) Allocations per the TxDOT 2018 UTP (December 2017) – For Planning Purposes and Subject to Change (2) Project Specific Statewide Allocations by Texas Transportation Commission (3) Category 7 (STP-MM) Funds are not included in this summary as this funding includes off-system projects and are traditionally selected by a Project Call CAT 4 Rural Connectivity was increased to by $5.0 million CAT 12 Strategic Priority was increase to $171. M

6 Frontage road connection,
HWY County Limits Description LEN EST SH 16 Atascosa SH Atascosa River Widen Bridge 0.134 $ 1.6 Bandera Old San Antonio Road to Robindale East Expand to 5 lane 1 $ 10.0 I 35 Frio IH 35 SH 85 and B -35 ( Dilley) Frontage road connection, 2.3 $7.0 US 181 Karnes County line to County Line Expand to 4 lane divided highway 16 $40.0 I10 Kendall at US 87 N Operational Improvements 0.99 $ 5.0 SH 27 Kerr Kerrville to Centerpoint Expand to 5 Lane 8 $ 56.0 US 290 Gillespie Johnson City to Fredericksburg operational improvements 29 $29.0 FM 1957 Medina * SH 211 to FM 471 w Expand to 4 lanes 6.52 $ 45.6 McMullen* SH 72 to Atascosa county line Expand 4 lane divided 12.83 $ 89.6 US 87 Wilson La Vernia to Bexar County/Wilson County Line 4 lane divided highway 4.2 $ 29.4 US 90 Uvalde SH 481 to Uvalde/Kenny County Line Super 2 17 $ 42.5 Texas Department of Transportation

7 Why I JOINED AACOG Thank You!


Download ppt "LEGISLATIVE BRIEFING SERIES"

Similar presentations


Ads by Google