L. Tavian, TE/CRG, 12.09.2013 Page 2 12 th September 2013 Accelerator Consolidation Workshop L. Tavian, TE-CRG.

Slides:



Advertisements
Similar presentations
Cryogenic system in P4: Possible options S. Claudet & U. Wagner LHC Workshop, “Chamonix XlV” January 2005 (Mostly for RF & beam scrubbing)
Advertisements

Going towards LHC Run2 CRYOGENICS 5 th Evian Workshop 2-4 June 2014 SESSION 4 - Systems 2 - Status and commissioning plans (HW perspective) Krzysztof Brodzinski.
Cryogenics at CERN (LHC)&Helium Inventory Brief review with emphasis given on cryogen management Americas Workshop on Linear Colliders 2014 Fermilab,
ESS Cryogenic System Design
QRL Leak Tests the story so far………. Paul Cruikshank on behalf of TE-VSC colleagues & AL4030 Consortium (S133) 1 Paul Cruikshank TE/VSC - QRL Leak Tests.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Engineering and Design Group Fermi National Accelerator Laboratory Cryogenic Department AAC Review, May , 2005 Jay Theilacker HPTFCRYOGENICS.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Internal review of superconductors and magnet laboratories 2nd part: Infrastructure/Laboratories Cryogenics Klaus Barth (CERN), Vladislav Benda (CERN)
The cryogenic systems of the ATLAS and CMS detectors Johan Bremer on behalf of TE/CRG 06/06/2013AFF.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
Introduction to LHC cryogenic system (layout, architecture) Preparation before cool-down (Purge, flushing) Transient operations to reach nominal operating.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
AT/ECR CRYOGENICS Organisation, Procedures and Communication with TCR Presentation for TCR-ECR-ACR Meeting 2003 by K. Barth.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
N.Delruelle, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Design choices.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
An introduction to Energy aspects at CERN June 2014.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Experience from large helium inventory management at CERN ILC Cryogenics and Helium inventory meeting CERN, Wed. 18 th of June 2014 D. Delikaris Technology.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Cryogenics for crab cavities – SPS/LHC 2 nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team.
The cryogenic system of the HIE-ISOLDE project and its related hazards for persons N. Delruelle on behalf of the TE/CRG group HIE-ISOLDE Safety Review.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
Central He distribution service upgrade status and dedicated He distribution for AD K. Barth on behalf of TE/CRG ADUC and ELENA Meeting Wednesday, September.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Serge Pittet (Work-Package holder) Konstantinos Papastergiou (Work-unit: Sirius converters) CERN Technology Department | Electrical Power Converters 12.
TE-CRG Activities D. Delikaris, TE-CRG.
TAC2 Alpi consolidation in Cryogenics and Cryomodules.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Mathew Wright Cryogenic Systems Operations Engineer
5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system G. Ferlin, CERN Technology department Presented at CEC 2015.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
LHC Cryogenics, equipment & interventions around P3/P7 S. Claudet, “volunteer” for TE_CRG 16 Oct’14.
CRYOGENIC SYSTEM of RAON Chul Jin Choi, Ki Woong Lee Cryogenics and Control Team Accelerator Division 5/23/2013 Chul Jin Choi, Ki Woong Lee Cryogenics.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
A. Perin, TE/CRG, Page 2 CERN-GSI FAIR Project integration/coordination meeting 5 14 th October 2015 A. Perin, H. Derking, L. Stewart, M. Chesi,
Operation of cryogenics for LHC detectors: what did we learn? European Cryogenics days U. Wagner, CERN.
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
FCC Refrigeration cost vs magnet temperature Laurent Tavian CERN, ATS-DO 15 February 2016.
L. Tavian, TE/CRG, LSC Page 2 February 21 th, 2014 LS1 Committee (LSC) L. Tavian TE-CRG.
Internal review of superconductors and magnet laboratories 2nd part: SM 18 & b.163: current status, weak points, possible improvement Cryogenics Vladislav.
TE-CRG Activities A. Perin, on behalf on the Cryogenics Group.
LHC Performance Workshop LS1 Session Cryogenic system: strategy to achieve nominal performance and reliable operation J. Bremer, K. Brodzinski, J. Casas,
ILC Cryogenics: Study of Emergency Action and Recovery - in progress -
CONSOLIDATION day in view of HL-LHC Cryogenic aspects
CONS and HL-LHC day Analysis of needs from BE-CO
Installation of an Instrument on a CERN machine
Cryoplant Installation Scope
SPS cryogenic proximity equipment and SM18 validation
Keeping LHC cold during LS periods Preliminary proposal
HL Consolidation Day Analysis of needs from BE-ICS
Overview & baseline of LS2 and roadmap for CRG
Mathew C. Wright January 26, 2009
SNS Cryoplant Commissioning Past Experiences
CTF Users’ Perspective
Onsite Training at JLab
Review Bloc 4 and SM18 facilities and upgrade
Presentation transcript:

L. Tavian, TE/CRG, Page 2 12 th September 2013 Accelerator Consolidation Workshop L. Tavian, TE-CRG

L. Tavian, TE/CRG, Page 3 Content Status of the present approved consolidation program Additional consolidation proposals for: LHC machine AD North Area (NA) (Test areas including HIE-Isolde) (General cryogenic services)

L. Tavian, TE/CRG, Page 4 Status of present consolidation program Cancelled (CSAP, LSC, LMC) (Saving of 150 kCHF) New CtC estimate: 225 kCHF (saving of 180 kCHF) New CtC estimate: 510 kCHF (Extra cost: 50 kCHF in 2013) To be reconsidered w/r to the probability of massive magnet quenches (> half sector) + on the LHC detector side, the consolidation of compressor stations: Hot spares for a MTTR < 1 day !

L. Tavian, TE/CRG, Page 5 Additional proposals for LHC (I) Continuation of the compressor station consolidation (Chamonix’2012 proposal): Present situation: Critical spare available to guarantee a MTTRestore of about 1 week in case of compressor failures at Point 18 and P2. Proposal: MTTR of 1 day possible by adding new compressor skids (6 skids: 3 MCHF + EN-EL, EN-ICE, EN-HE support) Stock availability > % by increasing the spare number (4 new spares: 1.2 MCHF)

L. Tavian, TE/CRG, Page 6 Additional proposals for LHC (II) IT cryogenics: Identified as HW limitation before HL-LHC Present limitation following consolidation: Lmax < 1.75 Lnom (considered acceptable at the time) New consolidation to be studied in collaboration with the equipment owner (TE-MSC) for a consolidation work during the LS2  could be an expensive consolidation. (+ EN-MME, EN-HE support)

L. Tavian, TE/CRG, Page 7 Additional proposals for LHC (III) Consolidation of the LHe storage during LS During LS1, about 90 t of helium (~2/3 of the LHC inventory) have been send back to the market via “virtual” storage contracts with gas vendors  ~ 0.7 MCHF/LS This helium has to come back at CERN in 2014:  return rate compatible with the LS1 schedule  but could be a limiting factor if higher rates are required for future LS. The possibility to keep a large fraction (~60 tons) of the 90 tons has to be studied: A small second-hand TCF20 liquefier is under procurement to consolidate 30 t of LHe  to be operational for the LS2 (100 kCHF required for installation (EN-EL, EN-HE support) Another liquefier is required to consolidate an additional inventory of 30 t (1.2 MCHF + EN-EL, EN-HE support)

L. Tavian, TE/CRG, Page 8 Additional proposals for LHC (IV) Electricity & instrumentation consolidation Deported Siemens electronics for control valves in the tunnel:  only 1 spare crate available for 150 operating units (10 year old)  proposal to increase the spare to ~10 % (300 kCHF).

L. Tavian, TE/CRG, Page 9 Additional proposals for AD AD new cryogenic distribution & recovery infrastructure: Present situation: Heavy logistics: up to ~20 dewars (500 l) per week Clients not familiar nor trained with helium transfer (1 recent accident during summer).  Safety (handling and cryogenics) is the concern. In addition, 20 % of the delivered helium is lost (generally 10 %)  200 kCHF of extra losses per year Proposal: Add a new cryogenic distribution and recovery infrastructure  800 kCHF + EN-HE support

L. Tavian, TE/CRG, Page 10 Additional proposals for NA (I) NA62 Very old LN2 transfer line without redundancy  loss of Krypton inventory (10 MCHF). Proposal: add a second transfer line and use the old one as redundancy  50 kCHF

L. Tavian, TE/CRG, Page 11 Additional proposals for NA (II) Unicos Controls migration Controls of cryogenic infrastructure is based on obsolete hardware (ABB) and SCADA (PCvue, ABB): ATLAS H8 & CMS RD5 NA62 cool-down & warm-up unit (SM18 compressor station, SM18 magnet test station) (B163 and cryolab pumping unit) (CAST) No CERN support: Hotline with ABB (10 kCHF per year) and old spare are existing  up to 1 to 2 weeks of downtime in case of major problems. 650 kCHF needed for the migration to the UNICOS/PVSS controls system (50 to 150 kCHF per infrastructure)

L. Tavian, TE/CRG, Page 12 Additional proposals for test areas (I) SM18 infrastructure: Problem with impurities: downtime of 1 week per year for cold box cleaning.  New full flow purifier  1 MCHF Compressor station consolidation: 2 critical compressors (Stal S93 & S73)  3 to 6 months of downtime S93 machine recently available in the present LHC spare S73 machine available following the ATLAS consolidation (but ATLAS property ?)  common ATLAS/SM18 spare with ATLAS priority in case of a low-probable dual need  or new spare procurement (0.3 MCHF)

L. Tavian, TE/CRG, Page 13 Additional proposals for test areas (II) HIE Isolde compressor station: HIE Isolde will reuse in 2014 the ex-ALEPH refrigerator. No spare are existing for the two cycle compressors (Aerzen VMY236 and VMY436) i.e. 3 to 9 months of downtime in case of major failure.  Cannibalization of the CAST refrigerator (ex- DELPHI plant identical)  or procurement of two new spares (valid for HIE Isolde and CAST) : 0.4 MCHF  MTTRestore of 1 week.

L. Tavian, TE/CRG, Page 14 Additional proposals for general cryogenic services (I) LN2 storage for CERN infrastructure: Present situation: 3 x l (NA, Central liquefier and SM18) rented 20 kCHF each per year, for more than 10 years, i.e. more 600 kCHF already spent. Cost of a storage vessel: 200 kCHF Proposal: Purchase 3 units (600 kCHF + EN-HE support) LN2 storage for CERN experiment: Present situation: 2 x l (Compass and NA61) rented 12 kCHF each per year, for more than 10 years, i.e. more than 240 kCHF already spent. Cost of a storage vessel: 120 kCHF Proposal: Purchase 2 units (240 kCHF + EN-HE suppport)

L. Tavian, TE/CRG, Page 15 Additional proposals for general cryogenic services (II) Recovery compressors (Helium, 200 bar) Present situation: 3 compressors 1 Burckhard compressor 400 m3/h very reliable 2 Bauer compressor 100 m3/h requiring heavy corrective maintenance (20 kCHF/year over 5 years) and with low running hours (1500 h/y in average instead of 4000 h/y), i.e. the large Burckhard compressor is running often at reduced capacity to compensate the unavailability of the Bauer machines  Efficiency issue and additional wear (number of stop and go). Proposal: Replace the 2 Bauer compressors by a new Burckhard 200 m3/h  350 kCHF

L. Tavian, TE/CRG, Page 16 Summary table Consolidation proposals[kCHF]SupportWhenPriority proposal* LHC - Additional compressor spares1200/asap+++ LHC - Additional compressor skids3000EN-EL, HE, ICE LS2++ LHC - IT cryogenics?EN-MME, HE LS2+++ LHC - LHe storage for Long Shutdown100, 1200EN-EL, HE LS2+++, + LHC - Siemens spares300/asap++ AD - New distribution/recovery infra800EN-HE NA - NA62 LN2 transfer line50/asap++ NA - UNICOS migration350 (+300)/asap++ Test area - SM18 purifier1000/asap+ Test area - SM18 compressor spare0 or 300/asap++ Test area - HIE Isolde compressor spares400/ General services - LN2 storage840EN-HEasap+ General services - Recovery compressor350/asap++ *: According to TE-CRG