GCC Tape Room and Library Status of 19-Mar-2006 Gene Oleynik

Slides:



Advertisements
Similar presentations
GCSE ICT Networks & Security..
Advertisements

NASK RESEARCH AND ACADEMIC COMPUTER NETWORK Collocation at the NASK Collocation and Hosting Centre.
Data Center Relocation Can Be a Moving Experience Rob Lyons Consultant, Resilient Systems, Inc.
XenData SXL-5000 LTO Archive System Turnkey video archive system with near-line LTO capacities scaling from 210 TB to 1.18 PB, designed for the demanding.
Background Information. 2 Scope: Computer Hardware  Tablets, Laptops, Embedded Systems  Desktops, Servers, Supercomputers  Peripherals and Accessories:
XenData SX-520 LTO Archive Servers A series of archive servers based on IT standards, designed for the demanding requirements of the media and entertainment.
XenData SX-10 LTO Archive Appliance An Archive Appliance based on IT standards, designed for the demanding requirements of the media and entertainment.
XenData SXL-3000 LTO Archive System Turnkey video archive system with near-line LTO capacities scaling from 150 TB to 750 TB, designed for the demanding.
A new Network Concept for transporting and storing digital video…………
MUNIS Platform Migration Project WELCOME. Agenda Introductions Tyler Cloud Overview Munis New Features Questions.
Buildings and Structures 2 Fixed Installations Aim To provide students with information to allow them to recognise the types of fixed fire protection.
Relocation of the Operations Control Center Oil Movements May 4, 2007 For RCAC Board Meeting.
The physical parts of Computer
Telenor Tier 3 Data Center April About Telenor Tier 3 Data Center Telenor built it´s own Data Centar in accordance with the latest industrial standards.
1 Northwestern University Information Technology Data Center Elements Research and Administrative Computing Committee Presented October 8, 2007.
SUMS Storage Requirement 250 TB fixed disk cache 130 TB annual increment for permanently on- line data 100 TB work area (not controlled by SUMS) 2 PB near-line.
Anne R. Kenney SCLD Annual Conference April 24-26, 2006 The Sum of its Parts: Consolidated Storage, Management, and Delivery Services.
Mobile Lab Kick Off!. Mobile Lab  What’s that?!  Show-n-tell  Things to consider  Group activity  Q & A.
High Lights of SAP Business One for Manufacturing.
1 Lesson 3 Computer Protection Computer Literacy BASICS: A Comprehensive Guide to IC 3, 3 rd Edition Morrison / Wells.
Hardware and Software Basics. Computer Hardware  Central Processing Unit - also called “The Chip”, a CPU, a processor, or a microprocessor  Memory (RAM)
Cold Chain Surveillance Coordinator Provincial EPI cell.
A New Building Data Center Upgrade capacity and technology step 2011 – May the 4 th– Hepix spring meeting Darmstadt (de) Pascal Trouvé (Facility Manager.
Chapter 3 – Computer Hardware Computer Components – Hardware (cont.) Lecture 3.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Symmetra ® LX – redundant UPS High performance, redundant.
CS102 Introduction to Computer Programming
1 Laredo Independent School District Information Technology Department Board Member’s Workshop Presentation January 7, 2003.
Types of Computers Desktop / Laptop PC / Mac Client / Server.
Adam Jansen Digital Archivist Washington State Archives ISB Presentation Status Report for Digital Archives.
VIA Visitor Internet Access at the Baylor University Libraries.
Dependencies on NETS Presented by UCAR Technical Security.
1. There are different assistant software tools and methods that help in managing the network in different things such as: 1. Special management programs.
Copyright (c) 2004 Prentice Hall. All rights reserved. 1 Committed to Shaping the Next Generation of IT Experts. Go! Computer Concepts.
1 Lesson 3 Computer Protection Computer Literacy BASICS: A Comprehensive Guide to IC 3, 3 rd Edition Morrison / Wells.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Site Networking Anna Jordan April 28, 2009.
Chapter 8 Purchasing and Recieving Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives Describe the role.
Midterm Hardware vs. Software Everyone got this right!
Lower Storage projects Alexander Moibenko 02/19/2003.
3 rd Party Registration & Account Management SMT Update To AMWG January 20, 2015.
SL500 Modular Library System. Objectives Locate needed information. Define the safety and ESD requirements. Identify and locate major components. Unpack,
1 Presentation to Technical Services Step 1 - Walk-through of new premises Step 2 – This presentation will focus on next steps to relocate staff and departmental.
MicroMet Cutting Edge Technology Defence Systems Division.
The Storage Function Chapter 8. The Storage Function Consider – Location & layout of Facility Dry, cold & freezer storage Quick storage Near production.
Semester One 2001/2002 Sheffield Hallam University1 What does a PC do? computers collect, process, store, and communicate information Collect via input.
Data Center Facility & Services Overview. Data Center Facility.
Cloud Computing is a Nebulous Subject Or how I learned to love VDF on Amazon.
Orbis Cascade Alliance Courier Service Membership Program Debi Baker, Business Manager NWILL September, 2007.
Install, configure and test ICT Networks
Week1: Introduction to Computer Networks. Copyright © 2012 Cengage Learning. All rights reserved.2 Objectives 2 Describe basic computer components and.
WLCG Service Report ~~~ WLCG Management Board, 31 st March 2009.
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
SDDC-ISUAL ISUAL-SDDC/ 1 Current status of the Science Data and Distribution Center (SDDC) H.T. Su, Alfred Chen, P.W. Kao and J.L. Chern ISUAL SDDC, Physics.
Australian Synchrotron Data curatorship for protein crystallography Julian Adams & Richard Farnsworth.
Managing Equipment 9 chapter. Recreation Facility Equipment Recreation facility equipment could be described as items that enhance, make functional, and.
PADME Kick-Off Meeting – LNF, April 20-21, DAQ Data Rate - Preliminary estimate Tentative setup: all channels read with Fast ADC 1024 samples, 12.
Environmental Monitoring and Alerting for Computing Room Facilities Wednesday, November 17, :00 am – 10:00 am Gerry Bellendir, Jack MacNerland, David.
Rotary Global Grant Medical Supplies and Equipment for a Village Primary Health Care Center in South Sudan.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
West Cambridge Data Centre Ian Tasker Information Services.
TEVATRON DATA CURATION UPDATE Gene Oleynik, Fermilab Department Head, Data Movement and Storage 1.
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
XenData SX-10 LTO Archive Appliance
IC3 GS3 Standard COMPUTING FUNDAMENTALS Module
Robotics and Tape Drives
Software Planning Guidelines
Data Center Service Brian Messenger 11/15/2016.
FY09 Tactical Plan Status Report for Site Networking
Personal Computers and Applications
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
Presentation transcript:

GCC Tape Room and Library Status of 19-Mar-2006 Gene Oleynik

Tape Library Bill K. has requisition for Library, 15 LTO-3, Fire suppression system & installation. License & 1yr Maintenance reqs in MMS Bill says earliest PO can be cut is April 14 News from Storage Tek is 10K slot library not available until May 4 Option to get 6600 slots then expand to 10K in May doesn’t help unless May 4 date slips Desire to get ADIC out of warehouse ASAP. Would release to STK as soon as PO cut.

Tape Library Room Facilities Redundant power from 1000 KVA in computer room and 40 KVA in Tape Room Facility Ops assert able to cover until portable generator can arrive Question about Generator including CRAC in humid summer months for any extended downtime

Tape Library Room Facilities con’t Primary (40 KVA) available this month – Fac Op Secondary 1000 KVA power available circa end- April – Fac Op Planned for up to 10 racks with redundant power (4 30A per rack – 2 from each source) Overhead sprinkler of wet variety as in all of our computer rooms. Room with Electrical

Tape Library Room Facilities con’t Security via Key card access: ISA, ESS, and Storage Tek Field Service Fac Op plan to install cameras that monitor entrances and record on DVR Locked Cabinets will be supplied for STK parts, ISA spares Blank tapes will be secured

Facility monitoring Humidity and temperature measured at CRAC currently. Want several other collection points in room (DR) Work to alarm and page when humidity or temperature are out of range (DB,DR) Web pages displays Application work to shut down the Library when UPC batteries run low (DB, DR)

Tape Library Room Furnishings 2 Locked Cabinets for STK parts, ISA spares. Desk & chair (KC). Crash cart need to be ordered, PC (ISA - GS) Blank tapes will be delivered to GCC and will require secured storage for in the small room off the library room (MB) Need Hand pallet jack (to receive tapes on dock), 2 rubbermaid heavy-duty service carts with lipped shelf to unload and cart tapes (MB)

Tapes Order for starter 250 quantity 400GB Fuji LTO-3 - Division Head approval Labels will be made at FCC with label printer. ADIC LTO-2 label samples sent to STK to see if the format will work with SL8500 Have 5 tapes in hand for testing Read back d0 LTO-2 on LTO-3 drive

Movers and Mover racks Need throughput over network to tape of 80 MB/s continuous to stream the drive at 80 rather than its second lower speed of 40 MB/s Redundant power required 16 per rack with 4 10 outlet strips and power console Have received external LTO-3 (LVD) to test mover rate and against ftt (WB, VS) Yet to specify mover, need to run some throughput tests on current mover and other candidates (WB, GO, SF)

Networking Extend Private (ACSLS) LAN between FCC and GCC in April (PD) Phil D. has requisition in for a Catalyst 6509 switch - Special Approvals See accompanying CCF design note isd.fnal.gov/gcc/gcc_6509.pdfhttp://www- isd.fnal.gov/gcc/gcc_6509.pdf Initially stken, cdfen, or d0en will own drives in it (a la dlts in the ADIC)

Enstore and monitoring The library has 4 arms each serving a plane of slots and drives. Each will appear as an LSM to enstore Need to integrate this new library into enstore web pages (CCF) Tape loads will require different procedures (to get them in plane to minimize inter-plane elevator movement)

Milestones Site pre-install visit by STK and fire suppression system experts ASAP (GO will arrange this week) Cut Library PO mid-April (BK) Cut mover requisition ASAP (GO, WB, SF) Test LTO-3 drive on ftt, read LTO-2 tape – April (CCF) Full redundant power available end-April (Fac Op) Enough presence (rack, mover, enstore media changer and library) available end-April to test system (CCF) Private LAN extension April (PD) Delivery May 4 th, Library Installation May 5 th (GO, KC, STK) Installation of Fire Suppression. When, how long? (Fac Op) Testing of system in with media changer 1 mover by ~ May 15 (CCF) Delivery and installation of networking late May (CCF) Delivery and installation of 16 mover rack late May (CCF, D1?) Integration into enstore Late May (CCF) Installation of infrastructure April-May (desks, shelving, procedures, etc)