Procurement ORNL U.S. ITER Project 1 November 15, 2006 PROCUREMENT Jeff Geouque U.S. ITER Procurement Director.

Slides:



Advertisements
Similar presentations
Blanket-Port Limiter Systems ORNL U.S. ITER Vendor Fair Blanket & Port Limiter Systems Michael Hechler Blanket Team Leader November 15, 2006.
Advertisements

ITER Tokamak Cooling Water System Fusion Power Symposium Washington, DC Tom Coleman AREVA Federal Services December 15, 2011.
Quality Assurance U. S. ITER Project Office U.S. ITER Project 1 November 15, 2006 U. S. ITER QUALITY ASSURANCE Gail Okulczyk, Presenter U. S. ITER Quality.
Report from US ITER Fusion Power Associates December 15, 2011 Ned Sauthoff Project Manager.
Will Minter Division Director, Asset Management & Small Business Programs Office November 15, 2006 ITER Project.
David Johnson Diagnostics Team Leader
Tritium Handling and Management in MFE - What We Learned from TFTR - C. A. Gentile June 24, 2014 PPPL / ITER Workshop 1.
Generation Business Line
Oak Ridge National Laboratory Mentor-Protégé Program Business Success Stories Presented by Cassandra McGee Stuart ORNL Small Business Programs Office May.
Decisions, Decisions, and still more Decisions Tom MayerDirector State of Alaska Jason SozaCPO State of Alaska Paul MashAsst. Director State of Utah Steve.
Member of the Helmholtz Association Status of the JULE-PSI project B. Unterberg, S. Kraus, A. Kreter, L. Scheibl and B. Schweer Institute for Energy and.
EPICS Collaboration Meeting – Aix-en-Provence June 2010 Page 1 ITER welcomes EPICS WD Klotz ITER int. Organiztion That’s me.
WBS Tokamak Exhaust Process
The main function of the divertor is minimizing the helium and impurity content in the plasma as well as exhausting part of the plasma thermal power. The.
PWF 3/01 Plasma Fueling Program1 Pumping Systems for ITER, FIRE and ARIES P. W. Fisher Oak Ridge National Laboratory C. A. Foster Cryogenic Applications.
1 Lecture #24 Fusion ENGR 303I. 2 Outline Fusion →Definition →Atoms usually used Previous attempts at fusion Current attempts at fusion →International.
April 2011 NC Division of Child Development1. April 2011 NC Division of Child Development2 SEEK Awareness Subsidized Early Education for Kids.
Meet The Buyer December Pat Condon Procurement and Legal Services Manager.
1Managed by UT-Battelle for the Department of Energy Doing Business with Oak Ridge National Laboratory Presented to the SBTDC Opportunities 2008 Will Minter,
Page 1 Electrical Supply Contract Information Day – 16 th July 2015 © 2015, ITER Organization IDM UID: iTER_D_R6QAFK Page 1 Tender Processes and Rules.
Developing a Vendor Base for Fusion Commercialization Stan Milora, Director Fusion Energy Division Virtual Laboratory of Technology Martin Peng Fusion.
Doing Business with Oak Ridge National Laboratory Presented to 22 nd Annual OSDBU Procurement Conference Keith S. Joy, Director ORNL Small Business Programs.
Presented by: Janice R. Thomas, Senior Director Office of Business Diversity & Civil Rights PROCUREMENT OFFICERS EVOLVING RULES AND FUTURE OPPORTUNITIES.
Procurement Evaluation and Re-Engineering Team (PERT)
ARIES Project Meeting, L. M. Waganer, Dec 2007 Page 1 Restructuring System Cost Accounts and Algorithms L. Waganer December 2007 ARIES Project.
US ITER UFA Meeting APS-DPP Savannah, GA Ned Sauthoff (presented by Dale Meade) November 15, 2004 US In-kind Contributions and Starting Burning Plasma.
We are small in number but mighty in spirit. With that said when it comes to staffing and electronic resources many of us wear many hats. There is a core.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 16th TOFE Madison, Sept , EUROPEAN TECHNOLOGICAL EFFORT IN PREPARATION OF ITER CONSTRUCTION ROBERTO.
Peer Reviews. 2 FY2010 Review Site Savannah River M & O Los Alomos National Security Lawrence Berkeley National Laboratory Princeton Plasma Physics Laboratory.
Alliance Texas Small Business Fair GSA, PBS Fort Worth, TX June 26 th, 2008.
How to Become a DIR Vendor Learn How to Do Business with the State of Texas through DIR Cooperative Contracts.
Work Plans for FY06 Sandia National Laboratories Michael Ulrickson Presented at PFC Technology Meeting May 9-11, 2005 At PPPL Sandia is a multiprogram.
BioEnergy Research Collaborative Tom French Manager - Strategic Programs, SRNL Nick Rigas Director - South Carolina Institute for Energy Studies, Clemson.
Report on Developing Industrial Cost Estimates for ITER Systems of Possible Interest to the US For Discussion with FESAC Gaithersburg, MD March 5, 2003.
Advances In High Harmonic Fast Wave Heating of NSTX H-mode Plasmas P. M. Ryan, J-W Ahn, G. Chen, D. L. Green, E. F. Jaeger, R. Maingi, J. B. Wilgen - Oak.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
ITER Project Status Ned Sauthoff Project Manager U.S. ITER Project Office FESAC 7/27/04 “preparing for an efficient start of ITER construction”
USIPO Export Control Project Status
U.S. Fusion Energy Sciences Program Fusion Program Summary for Program Leaders February 7, 2005 E xcellent S cience in S upport of A ttractive E nergy.
1 Gatwick Procurement Overview Alastair McDermid Raymond A. Melee October 2015.
DEPARTMENT OF INFORMATION TECHNOLOGY State of Maryland Information Technology Contracts Michael E. Balderson, Contract Administrator Michael Meinl, Procurement.
ORNL is managed by UT-Battelle for the US Department of Energy Fusion Energy Development at ORNL (non-US ITER) Phil Ferguson Fusion Power Associates 36.
SLAC Accelerator Department Type A Investigation and PEP-II John T. Seeman Assistant Director of the Technical Division PEP-II MAC Meeting December 13,
State of Georgia Department of Administrative Services State Purchasing Division.
1 Nuclear Fusion Class : Nuclear Physics K.-U.Choi.
Federal Acquisition Service U.S. General Services Administration Bernadette Mount Assistant Commissioner Small Business Branch Pathway to Success.
1 Preparation and Positioning of Korea for the ITER Project 2004 KSTAR US-Korea Workshop May 19-20, General Atomics.
Richland Creek Water Supply Program Contract for Reservoir, Pump Stations, and WTP Final Design Services Paulding County, Georgia Water and Sewer Advisory.
Doing Business With The U.S. Environmental Protection Agency EPA’s Mission and Buying Offices; What and How EPA Buys; Finding Procurement Opportunities;
DOE Buys Bio for Energy Security. Overview What and Why “Buying Bio”? What Biobased Products Displace Petroleum? Which Products Has USDA Proposed? What.
Peer Reviews. 2 FY2009 Review SiteWest Valley Demonstration Project NST Nevada Test SiteKansas City PlantOak Ridge Y-12Oak Ridge National Laboratory Pacific.
Doing Business with B&W Y-12 U.S. Small Business Administration Tennessee District Office Tennessee State University, Avon Williams Campus Nashville, Tennessee.
Industrial Assessment Centers IAC Student Meeting – Washington, DC February 8-10, 2006 Attended Student: Yin Yin Wu 2006 IAC Student Meeting Overview.
MAIN COMPONENTS  INTODUCTION  PRINCIPLE  CONSTRUCTIONAL DETAILS  PROCESS  ADVANTAGES  DISADVANTAGES  CONCLUSION.
The tritium breeding blanket in Tokamak fusion reactors T. Onjun1), S. Sangaroon2), J. Prasongkit3), A. Wisitsorasak4), R. Picha5), J. Promping5) 1) Thammasat.
PENNSYLVANIA’S STATE SYSTEM OF HIGHER EDUCATION
US Participation in the
Western Michigan University Central Power Plant
National Aeronautics and Space Administration
Total Contract Management
VETERAN’S FEDERAL PROCUREMENT OPPORTUNITIES
PRESENTATION OF AWARDS
Veterans Federal Procurement Opportunities
Veterans Federal Procurement Opportunities
PENNSYLVANIA’S STATE SYSTEM OF HIGHER EDUCATION
VETERANS FEDERAL PROCUREMENT OPPORTUNITIES
Veterans Federal Procurement Opportunities
Project Management Considerations
Savannah River and You: Partnering for Success
Presentation transcript:

Procurement ORNL U.S. ITER Project 1 November 15, 2006 PROCUREMENT Jeff Geouque U.S. ITER Procurement Director

ProcurementORNL US ITER Vendor Fair November 15, Procurement Overview >$464M in Procurements U.S. ITER Partner Laboratories: – Oak Ridge National Laboratory (ORNL) – Project Office – Princeton Plasma Physics Laboratory (PPPL) – Savannah River National Laboratory (SRNL)

ProcurementORNL US ITER Vendor Fair November 15, To Do Business with US ITER Project Procurement Website – Register on Vendor Database Business Opportunities for U.S. ITER – ORNL – PPPL – SRNL

ProcurementORNL US ITER Vendor Fair November 15, Work Breakdown Structure Elements ORNL – 1.1.1Magnet Systems – 1.1.2First Wall Shielding – 1.1.3Port Limiters – 1.2.1Cooling Water Systems – 1.3.1Vacuum Pumping & Fueling Systems – 1.5.1Ion Cyclotron Systems – 1.5.2Electron Cyclotron Systems PPPL – 1.4.1Electric Power Systems – 1.5.3Diagnostics SRNL – 1.3.2Tritium Plant Exhaust Processing

ProcurementORNL US ITER Vendor Fair November 15, Procurement Staff / Point of Contacts ORNL – ORNL Contracts Director – Jerome Hicks – U.S. ITER Procurement Director – Jeff Geouque – U.S. ITER Procurement Team Leader – Roy Etheridge – U.S. ITER Procurement Subcontract Administrator – Kelli Kizer PPPL – Rod Templon SRNL – Gregg O’Brien