What are “Pinch Points” PPinch Points are areas identified on the Highways Agency network of roads that experience high levels of congestion TThe.

Slides:



Advertisements
Similar presentations
A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
Advertisements

Consultation on key routes which run parallel to Oxford Road corridor September 2012 Bus priority package.
CityCo, Piccadilly Hoteliers Forum
Hazel Grove Car Park Proposals Overview Transport for Greater Manchester (TfGM) is developing plans to provide over 100 additional car parking spaces at.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
Totnes Bridge Presentation to Totnes Town Council 5 November 2012 John Fewings.
1 Lincoln Footbridges Stewart Bewick -22 nd September 2014.
Dr. Essam Almasri Advanced Traffic Engineering 3. Roundabout.
MERTON HIGH STREET MATTHEW EALES. 2 Background Southern Gas Networks have been repairing leaks in Merton High Street over a number of years resulting.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Region 1 Traveler Information on 2010 Construction Route 7 over I-87 (Exit 6) Bridge Replacement Town of Colonie.
Study Area What is this consultation about? This consultation has been prepared to seek your views and provide you with information about proposed transport.
Site Location Site Bus Stop Footbridge 400, 800, 1,200 and 1,600 Metre Walk Distance Primary Shopping Areas
OVERVIEW AND SCRUTINY COMMITTEE SCRUTINY OF 20MPH SPEED LIMITS Rupert Thacker Team Leader – Forward Planning and Rail Liaison.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
CitywallCitygate St James Boulevard Newcastle Upon Tyne NE1 4JH Tel: +44 (191) By Road There is a pay and display parking facility to the front.
Work Zone Safety It Starts With YOU!!. 2 BOOK 7 What is NEW??? IMSA TECHNICAL EXPO October, 2014 Dave Edwards.
Existing informal footpath (owned by HCA) to connect to Lodge Jct crossing Carriageway widened into wooded area Proposed area for landscaping.
Cycle Skills Network Audit Mark Strong Managing Consultant Transport Initiatives LLP 145 Islingword Road Brighton BN2 9SH
How to find us Environmental Design Associates. Where we are ► Clicking on the following link shall automatically connect you to Google map. Alternatively.
At 5am on Sunday 25 March 2012, two of the give way rules are changing to make our roads safer.
Going from 4 Lanes to 3 Lanes Jefferson City’s McCarty Street Project.
CENTRAL ACCESS SCHEME FOR THE CITY OF KILKENNY Traffic Considerations The feed back resulting from public consultation did cause us to revisit the traffic.
Joint Transport Forum I Rapid Transit Line 2 Our Future Transport I West of England Sub Region.
A presentation to a Roads Academy Masterclass May 2011 Paul Mitchell Head of Health & Safety Aiming for Zero The Highways Agency’s approach to improving.
Runways – 7 July Paul Harwood
Protecting Telford’s uniqueness and our community assets Keith Harris Service Delivery Manager – Transport & Highway Development.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
INTRODUCTION THIS IS AN EXHIBITION OF THE “CAMBORNE POOL REDRUTH TRANSPORT STRATEGY STAGE 1” PLANNING CONSENTS WERE GRANTED IN NOVEMBER 2008 AND JANUARY.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
How would a truck get through? Any suggestions?. No parking allows access.
Roads & Traffic Department College Green Public Transport Priority measure.
Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Accommodation & Hospitality Services Team 2 February Team Meeting.
BELMONT TRANSPORT PACKAGE A49 – B4349 (Relief Road Southern Section) Meeting 14 June 2013.
Oxfordshire County Council has exciting plans to transform the centre of Oxford’s transport and pedestrian experience.
Totnes Old Bridge Presentation to the Totnes Traffic and Transport Forum 10 October 2012 John Fewings.
Newquay & St Columb Community Network Meeting Transport update Vicky Fraser & Rebecca Lyle Cornwall Council 20 th October 2015.
21st October 2015 Stillorgan Village Area Movement Framework Plan PUBLIC CONSULTATION INFORMATION PERIOD DOCUMENT.
Rookery South Resource Recovery Facility (RRF) Community Liaison Panel Transport Presentation – 14 th December 2009 John Hopkins, Peter Brett Associates.
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Integrated Transport Policy / Regional Transport Plan Environment & Regeneration Scrutiny Committee 13 December 2006.
Communities M40 J12-J14 – Data Analysis, Modelling and Scheme Development.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
A64 (T) Hopgrove Roundabout Improvements. Background The roundabouts at Hopgrove are located to the north east of the City of York and form a junction.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
Land west of Grace Crescent, Hardwick Presentation to Hardwick Parish Council 23/08/2016.
MD 30 (Hanover Pike) at Mt. Gilead Road
JUAN DE FUCA PEDESTRIAN CROSSING Transportation and Public Infrastructure Committee Colwood, BC 1 October 2012.
Bristol’s 20 mph experience Peter Mann Service Director, Transport
General Manager Logistics Systems UK
M40 J12-J14 – Data Analysis, Modelling and Scheme Development
After the NACTO Guide Now I’m going to discuss the options available within the NACTO Urban Bikeway Design Guide.
A future benefit for the South Cheshire infrastructure
Highway 169 Bridge Replacement & Pavement Resurfacing
A future benefit for the South Cheshire infrastructure
Contract 60X10 Informational Meeting Weber I-55
Work Hours: Monday – Saturday, 5:00 a.m. – 3:30 p.m.
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
3 November 2017 Fraserburgh and Peterhead to Aberdeen Strategic Transport Study: STAG Part 1 Plus Bob Nicol: Project Director David Murtagh: Project Manager.
Utility Relocation: 11th/Mill
GCP Transport Update Meeting for: M11 J11 Park & Ride Engagement Group
Western Orbital.
Presentation transcript:

What are “Pinch Points” PPinch Points are areas identified on the Highways Agency network of roads that experience high levels of congestion TThe Pinch Point Programme (PPP) was set-up as part of the Government’s initiative to deliver improvements to the strategic road network and promote improved traffic flows and stimulate economic growth TThe Highway Agency was allocated £300m to deliver these improvements during the period AAs the service provider for Area 10, Balfour Beatty Mott McDonald are charged with delivering the scheme

A55/A483 Pinch Point  A55/A483 junction is an essential connection between North Wales and northwest England Existing problems include:  congestion at the junction  significant queues and delays at peak times  safety issues  accidents associated with the existing layout

A55/A483 Pinch Point - Improvements Improvements being introduced include:  Providing additional lanes on Posthouse Roundabout  Providing additional lane on A55 Westbound exit slip  New traffic signal junction at Rough Hill  Change roundabout to traffic signals at Wrexham Road  Installation of a new footbridge  Improved street lighting and barriers Timescale – September 2014 to March 2015

A55/A483 Pinch Point - Benefits The aims of the scheme are to:  Help reduce daily congestion  Reduce journey times  Improve safety  Stimulate the local economy

Overview of the scheme Posthouse Roundabout Rough Hill Junction Wrexham Road Junction Chester Wrexham

Timescales From 15 th September 2014 to 31 st March 2015  Phase 1 – Install New Traffic Signals With Right Turn Into Rough Hill – September 15 th to October  Phase 2 – Remove Wrexham Road Roundabout and Install New Traffic Signals – October to January  Phase 3 – New Footbridge Across the A55 – November to Christmas  Phase 4 – Widening on Roundabout and Slip Road – January to March

Rough Hill Junction New Right Turn Into Rough Hill New Traffic Signals With Pedestrian Crossings New Footpath Chester Wrexham

Wrexham Road Junction New Left Turn Into Wrexham Road Traffic Signal Controller and Maintenance Layby New Traffic Signals Chester Wrexham Pulford

A55/A483 Roundabout Additional 4 th Lane New Footbridge Additional 4 th lane Additional 4 th lane and new traffic signals Chester Manchester Wrexham

A55 Westbound Off Slip Additional 4 th lane New ‘Tiger-Tail’ road marking to separate traffic flows Manchester

Phase 1 – Rough Hill  Timescale – From September 2014 to October 2014  Works – Installation of traffic signals with right-turn facility into Rough Hill  Road Closures – Overnight closures of A483 between J7 and A55 J37 from Monday to Friday 9pm to 5am (7am at weekends if needed)  Diversions will be signed well in advance

Phase 2 – New Pulford Junction  Timescale – October 2014 to January 2015  Works ;  Removal of roundabout  New drainage system  Raising of carriageway levels  Installation of new signalised junction  Road Closures – Overnight closures of A483 between J7 and A55 J37 from Monday to Friday 9pm to 5am (7am at weekends if needed)

Important Information for residents in Pulford and Rossett  Whilst this junction is being constructed there will be;  No exit from Wrexham Road onto the A483  No right turn into Wrexham Road from the A483  Access to the A483 will be via J7 at Rossett  We know this may cause problems for residents but the drainage works we need to carry out cannot be done safely any other way  We are building a new link from the A483 into Wrexham Road to maintain access throughout the day

Phase 3 – New Footbridge  Timescale – November 2014 to December 2014  Works – Installation of new footbridge for pedestrians and cyclists across the A55  Road Closures - Overnight closures of A55 between J35 and J38 from Monday to Friday 9pm to 5am (7am at weekends if needed)  Diversions will be signed well in advance of the closures

Phase 4 – Roundabout and slip roads  Timescale – January 2014 to March 2015  Works – Widening of lanes and reconfiguration of existing roads  Road Closures – Partial overnight closures of A55/A483 from Monday to Friday 9pm to 5am (7am at weekends if needed)  Diversions will be signed well in advance of the closures

Phase 4 – Roundabout and slip roads  Timescale – January 2014 to March 2015  Works – Widening of lanes and reconfiguration of existing roads  Road Closures – Partial overnight closures of A55/A483 from Monday to Friday 9pm to 5am (7am at weekends if needed)  Lane closures on A55 Westbound exit and the A55 mainline  These lane closures may increase queues slightly during construction but they are necessary for safety, both yours and ours

On Line Details & Updates HA Website address - Twitter account – Highway Agency North West Drop in Centre – open every Monday morning from 10.00am until am at the site offices at the Rough Hill Junction